Process Excellence L6S PFMEA Discussion Why Do Process Improvement Programs Fail? SOURCE: www.moresteam.comwww.moresteam.com 1.

Slides:



Advertisements
Similar presentations
CHAPTER 18 1 Use with BUSINESS TO BUSINESS MARKETING MANAGEMENT: A GLOBAL PERSPECTIVE ISBN Published by Routledge 2013.
Advertisements

CHAPTER 11 MANAGING INTERNAL OPERATIONS: ACTIONS THAT PROMOTE GOOD STRATEGY EXECUTION.
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Baldrige National Quality Program 2009 Baldrige National Quality Program The Path to Excellence and Some Path-Building Tools Baldrige National Quality.
Human Resource Management Strategy
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
Baldrige Performance Excellence Program | 2015
 Creatively joining your company’s capabilities with your customer’s needs.
BTEC First Engineering
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 14 Building and Sustaining Total Quality Organizations.
Management is Essential
Leading and Managing Business Intelligence 21 st Meeting Course Name: Business Intelligence Year: 2009.
HR Society Event 15 th Dec 2011 Αθήνα, 15 Δεκεμβρίου 2011 “Ο Στρατηγικός ρόλος του HR στις νέες εργασιακές συνθήκες και πραγματικότητα”
JIT and Lean Operations
Agile Project Management By: Jim Highsmith Presented by: Brian Faulk.
© Cultural Chemistry 2011 | | slide 1www.culturalchemstry.com Lean HR Do More With Less Enjoy doing it.
BIS 494: Topics in Information Systems 1 The Lean Manufacturing and Value Stream Mapping Chapter 4 (Supplement) Business Process Modeling, Simulation and.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Motivating Channel Members
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
1 Understanding Process Basics. BA 553: Business Process Management2 What is Systems Thinking? Systems thinking is a holistic approach to analysis that.
Trent Blinkman International Business Process Execution Manager An Overview of BEP / Hoshin Kanri 3M International Operations Business Execution Process.
New Product Development Management NPDM 4 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
Logistics and supply chain strategy planning
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Sales Ops Data Governance Guide salesbenchmarkindex.com.
Social media strategy and planning MARK 490 Week 4.
Session 1 MANAGING Mata kuliah: A0012 – Manajemen Umum Tahun: 2010.
BTO Transformation Operational Team Briefings Lean Maturity Assessment and Day in the Life Of.
Managing Product Development Prepared by: Ayesha Sarfraz(group leader) Madiha ashiq Aneeka akram Tanzila khawar.
Strategy: A View From the Top
UKSMA 2005 Lessons Learnt from introducing IT Measurement Peter Thomas –
What is a Process? A logically related set of tasks performed to achieve a defined business outcome. A structured, measured set of activities designed.
Lean Production The elimination of waste in the production process.
The Value Driven Approach
Readiness for AdvancED District Accreditation Tuscaloosa County School System.
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
Chapter 12 Translating Expectations to Specifications CEM 515: Project Quality Management Prof. Abdulaziz A. Bubshait King Fahd University of Petroleum.
Quality Management Theory Terms, Concepts, & Principles.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Manufacturing Engineering Team Work and Leadership Development Copyright © Texas Education Agency, All rights reserved. 1.
Confidential and Proprietary 1 Project Management using Scrum at Wachovia.
Open the Worksheet: CRL/Year 11/Technology/Engineering/Unit 1/ Lean Manufacturing worksheet WLT Think about what you already know about lean manaufacturing.
Amity School of Business Amity School of Business Management Foundation Module-II By Neeti Saxena Assistant Professor, ASB 1.
Human Asset Performance Improvement Model HAPI. Human Asset Productivity Improvement (HAPI): The Challenges In our experience, clients face numerous challenges.
10-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Cross-Cutting Capabilities: Lean Operations,
® ® Workshop Synthesis Reflections on the Day Completing the Handbook Making an Impact.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
ASQ Section 1212 November 17, 2016 Allan Glasby
OPS 571 help / ops571helpdotcom
Business process measurement
Management is Essential
Management is Essential
IT Governance at the SCO
Instructor LISA Galina PhD. in Economics
Change Management Approaches
Orientation and Training
Orientation and Training
Creating High-Performance Work Systems
Objectives 1. An understanding of the importance of management to society and individuals 2. An understanding of the role of management 3. An ability to.
Creating High-Performance Work Systems
Objectives 1. An understanding of the importance of management to society and individuals 2. An understanding of the role of management 3. An ability to.
CITE THIS CONTENT: RYAN MURPHY, “QUALITY IMPROVEMENT”, ACCELERATE UNIVERSITY OF UTAH HEALTH CURRICULUM, JANUARY 30, AVAILABLE AT: 
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
Six Sigma Introduction 1 1.
Enterprise Business Agility Transformation What it takes to start and to scale Andrea Willemse EBA Summit Atlanta Sept 11-12, 2019.
CITE THIS CONTENT: RYAN MURPHY, “QUALITY IMPROVEMENT”, ACCELERATE UNIVERSITY OF UTAH HEALTH CURRICULUM, JANUARY 30, AVAILABLE AT: 
Process improvement for the lab
Presentation transcript:

Process Excellence L6S PFMEA Discussion Why Do Process Improvement Programs Fail? SOURCE: 1

Process Excellence L6S PFMEA Discussion Why Do Process Improvement Programs Fail? Consider the simple model below (Figure 1) to describe the most basic elements of successful process improvement efforts: Successful program implementation depends upon three basic inter-related factors, which must be present consistently over time: 2

Process Excellence L6S PFMEA Discussion Skills The organization must be broadly educated to apply the right collection of process improvement tools. Many tools are needed to build a house, and all are necessary for the overall effort to succeed. A good saw does not compensate for a missing hammer. Beyond identifying the tools that are required, building the organization toolbox requires a means to deliver education content as needed, as well as the basic capability to learn, master, and apply that content. 3

Process Excellence L6S PFMEA Discussion Structure Skills are of diminished usefulness without a systematic structure to prioritize and guide their application on a broad scale. Efforts must be focused on the business issues that translate into customer value and waste elimination. 4

Process Excellence L6S PFMEA Discussion Structure Process improvement must cross organization functional boundaries, and can cause functional frictions (e.g. manufacturing vs. engineering), usually because of inappropriate performance metrics. A rigid functional organization can squelch cross-functional improvement efforts that inevitably require trade-offs. 5

Process Excellence L6S PFMEA Discussion Structure In recognition of this, many firms are reorganizing around processes rather than functions. The successful implementation of Lean practices requires a Value Stream Manager who owns the value stream across functional boundaries. 6

Process Excellence L6S PFMEA Discussion Environment The workforce must be motivated and engaged to apply the skills within the structure. Recognition, compensation policies, and the business culture must consistently support team oriented process improvement or it will die. The workforce must understand WHY it is important to improve processes, and feel that they have a meaningful stake in the success of those efforts. 7

Process Excellence L6S PFMEA Discussion Environment A systems perspective is necessary to connect cause and effect and therefore fully understand the WHY of Lean Enterprise thinking. Programs fail because of a weakness in one of these three areas. A basketball coach once said that "it doesn't do any good to steal the ball and then dribble it off your foot!" The message is that any program requires all of the important elements to be present. 8

Process Excellence L6S PFMEA Discussion Process improvement is an organic process. Think of it like tending a garden, which relies upon the correct application of several mutually supportive activities - good soil, sunlight, water, fertilizer, pest control, pruning, etc. All of those activities can represent process improvement programs. All are important, but the garden doesn't flourish unless several of them are present in the right mix over time. 9

Model for Lean Rollout 10

More information 11