The Integrated Surface Hourly (ISH) Global Database ESDIM/OGP funded, FCC effort 2 QC phases thus far Full POR online via FTP, partial POR via CDO ISH.

Slides:



Advertisements
Similar presentations
DATA RESCUE IN AFRICA: SYNERGY WITH NATIONAL AND REGIONAL PROJECTS Climate&Environment Department ACMAD International Workshop on the Rescue and Digitization.
Advertisements

Configuration Management
Meteorological Observatory Lindenberg – Richard Assmann Observatory The GCOS Reference Upper Air Network.
Personal Digital Assistant August,  Maintenance Services  Aspects Of The Personal Digital Assistant System What Did We Want To Achieve What Items.
Climate Change Committee WG1 QA/QC terminology and requirements from the IPCC Good Practice Guidance and the Guidelines for National Inventory Systems.
INTEGRATING SURVEYING AND GIS PREPARED FOR: WVAGP SEMINAR Jared D. Wilson Instructor of Land Surveying Glenville State College Glenville, WV.
LAPS Analysis & Software by Steve Albers. 2 Basic Solution LAPS coupled with MM5 NWP model Use diabatic initialization (“hot start”) Utilize parallel.
1 Fischer-Porter Retrofit Workshop Sterling, Virginia Nov , 2008 Hourly Precipitation Data Processing System at NCDC Stuart Hinson Meteorologist.
8.
Report from the GCOS Archive/Analysis Center Matthew Menne NOAA/National Centers for Environmental Information Center for Weather and Climate (NCEI-Asheville)
Operational Quality Control in Helsinki Testbed Mesoscale Atmospheric Network Workshop University of Helsinki, 13 February 2007 Hannu Lahtela & Heikki.
Illinois Institute of Technology
7.2 System Development Life Cycle (SDLC)
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
1 Automated Snow Sensor Experiment Overview In 2003, Nolan Doesken (Colorado State Climatologist) was granted funding from Headquarters, to perform testing.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
E.R.P.S University of Palestine. Risks in an ERP environment : The use of ERP systems clearly introduces additional risks into the system environment.
System Software Integration Testing Mars Polar Lander Steven Ford SYSM /05/12.
Annie Griffith December 2007 December 2007 Gemini OSU - UKLC Update.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Monday 13 th November GSY/050388/ © BAE SYSTEMS All Rights Reserved ESA Space Weather Applications Pilot Project Service Development.
Meteorological Observatory Lindenberg – Richard Assmann Observatory The GCOS Reference Upper Air Network.
CCSM Software Engineering Coordination Plan Tony Craig SEWG Meeting Feb 14-15, 2002 NCAR.
California’s Surface Water Ambient Monitoring Program Data Management Systems Cassandra Lamerdin SWAMP Data Management Team Marine Pollution Studies Laboratory.
Technical Working Group, II Teruko Manabe Steven Worley Miroslaw Mietus Shawn Smith Simon Tett Volker Wagner Scott Woodruff David Berry Liz Kent.
Real-time Observation Monitoring and Analysis Network Haihe LIANG, etc. TECO-2008.
An Approach To Automate a Process of Detecting Unauthorised Accesses M. Chmielewski, A. Gowdiak, N. Meyer, T. Ostwald, M. Stroiński
VERIFICATION OF NDFD GRIDDED FORECASTS IN THE WESTERN UNITED STATES John Horel 1, David Myrick 1, Bradley Colman 2, Mark Jackson 3 1 NOAA Cooperative Institute.
HIGH INTENSITY DRUG TRAFFICKING AREA FINANCIAL MANAGEMENT DATABASE PROJECT.
ArcGIS Data Reviewer: An Introduction
Michael A. Palecki USCRN Science Project Manager National Climatic Data Center DOC/NOAA/NESDIS USCRN PROGRAM STATUS MARCH 3, United States Climate.
IP Connectivity on TELESYNERGY® TANDBERG codecs Aaron Taye Division of Cancer Treatment and Diagnosis National Cancer Institute, USA Contractor, TerpSys.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Mapping Operations Section B 1.
GOES Users’ Conference III May 10-13, 2004 Broomfield, CO Prepared by Integrated Work Strategies, LLC GOES USERS’ CONFERENCE III: Discussion Highlights.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Chapter 10 Electronic Data Processing Systems.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 In Situ SST for Satellite Cal/Val and Quality Control Alexander Ignatov.
NIST Data Science SymposiumMarch 4, 2014 NIST Data Science SymposiumMarch 4, Climate Archives in NOAA: Challenges and Opportunities March 4, 2014.
Initiative overview 30 November 2011 Jay Lawrimore Chief, Ingest and Analysis Branch, NCDC.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Surface Water Quality Monitoring Information System (SWQMIS) Cindi Atwood Tetra Tech, Inc. (703) Nancy Ragland TCEQ.
CPC Unified Precipitation Project Pingping Xie, Wei Shi, Mingyue Chen and Sid Katz NOAA’s Climate Prediction Center
IHOP_2002 DATA MANAGEMENT UPDATE Steve Williams UCAR/Joint Office for Science Support (JOSS) Boulder, Colorado 2 nd International IHOP_2002 Science Workshop.
IHOP-2002 Data Archive and Development of Composite Data Sets Steven F. Williams, Scot M. Loehrer, Linda E. Cully, Darren R. Gallant, Janine Goldstein,
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
TSS Database Inventory. CIRA has… Received and imported the 2002 and 2018 modeling data Decided to initially store only IMPROVE site-specific data Decided.
Meteorological Observatory Lindenberg – Richard Assmann Observatory (2010) GCOS Reference Upper Air Network Holger Vömel Meteorological Observatory Lindenberg.
Weather and Climate. Introduction Before the end of June 2011, the National Oceanic and Atmospheric Administration (NOAA) officially declared the year.
Homogenization of Chinese daily surface air temperatures:An update for CHHT1.0 Li Qingxiang, Xu Wenhui, Xiaolan Wang, and coauthors (National Meteorological.
The Lake Pontchartrain Forecast System Rick Luettich Jason G. Fleming Institute of Marine Sciences University of North Carolina.
Towards Zero Copies Brian Alconcel, P.E. Chief, Office of Highway System Information & Performance CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS.
August 14-15, 2003 Crystal Gateway Marriott Arlington, VA Software Developers Conference.
2/18/2016 Data Management Issues Related to Drought Monitoring at Environment Canada Robert Morris Data Analysis and Archive Division Meteorological Service.
CIOSS Ocean Optics Aug 2005 Ocean Optics, Cal/Val Plans, CDR Records for Ocean Color Ricardo M Letelier Oregon State University Outline - Defining Ocean.
N ational C limatic D ata C enter Development of the Global Historical Climatology Network Sea Level Pressure Data Set (Version 2) David Wuertz, Physical.
Automated Operational Validation of Meteorological Observations in the Netherlands Wiel Wauben, KNMI, The Netherlands Introduction QA/QC chain Measurement.
Oncology Patient Enrollment Network OPEN Quality Assurance Lucille Patrichuk OPEN Implementation Manager OPEN Conference September 18, 2008.
NOAA National Climatic Data Center Dr. Karsten Shein Climatologist NOAA/NESDIS/NCDC 151 Patton Ave. Asheville, NC
Module 6 ********* Data Loading Workforce Information Database Training Last update November 2006.
88 th Annual American Meteorological Society Meeting New Orleans, LA January 20-25, The Integrated Surface Database: Partnerships and Progress Neal.
1 Ambient Monitoring Program PM 2.5 Data Lean 6 Sigma Air Director’s Meeting May 2015.
MEASURE Evaluation Data Quality Assurance Workshop Session 3 Introduction to Routine Data Quality Assessment.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
MANAGEMENT INFORMATION SYSTEM
Latin American and Caribbean Flood and Drought Monitor – What it does and does not do Figure showing current system Coarse resolution 25km, daily Satellite.
Jay Lawrimore, Matt Menne
Progress in development of HARMONIE 3D-Var and 4D-Var Contributions from Magnus Lindskog, Roger Randriamampianina, Ulf Andrae, Ole Vignes, Carlos Geijo,
MODIS SST Processing and Support for GHRSST at OBPG
Level 1 Level 1 – Initial: The software process is characterized as ad hoc and occasionally even chaotic. Few processes are defined, and success depends.
Presentation transcript:

The Integrated Surface Hourly (ISH) Global Database ESDIM/OGP funded, FCC effort 2 QC phases thus far Full POR online via FTP, partial POR via CDO ISH is being renamed ISD – Integrated Surface Data, to reflect its usage in the Integrated Surface Data Processing System, and inclusion of hourly, daily, etc data

ISH Quality Control Phase 1 Data comparisons as part of merge process to ensure records are for same station-time Inventory system to ensure no data loss from beginning to end of process Test data to verify all software is working properly Random checks of “Version 1” output data Reprocessing as necessary

ISH Quality Control Phase 2 57 quality control algorithms (1 or multi-checks per algorithm, fully automated) Validity checks for all data fields Extreme value checks to eliminate gross errors Temporal continuity checks (2-sided) for elements such as temperature, dew point, wind, & pressure Internal consistency checks between elements Checks for several known systematic problems Test data verification Random checks of “Version 2” output data

The Results…. ~ 20,000 stations historically. As early as 1900 to present. Available data increases in 1948, and further increases in 1973.

Future Plans Place full period of record online in CDO--now have most recent data online ( Additional online capabilities, summaries, etc Integrated Surface Data Processing System—now in development for near real-time QC of all data Merge additional data sources into ISH Improve and enhance the metadata Phase 3 quality control: more sophisticated temporal checks, spatial checks, homogeneity adjustments, etc Partnerships with other agencies and groups

Data Access Via Climate Data Online System - Access for U.S. and global digital data - Surface hourly, daily, monthly, with others planned

Impacts/Issues Rapidly changing technology Hardware implementation and problems Adequate numbers and training of personnel Better communication across Divisions Adequate funding for the tasks at hand