The High Impact Weather Project: a proposal for a WWRP research activity Sarah Jones, Brian Golding Carlos Angelis, Philippe Arbogast, Ana Barros, Aida.

Slides:



Advertisements
Similar presentations
Workshop on Use of NWP in Support of Nowcasting Initiated by Tom Keenan Proposal by Jenny Sun, Jeanette Onclee, and Tom Keenan Organizing committee: Jeanette.
Advertisements

WWRP 1 THORPEX Summary Paper David Parsons U of Oklahoma School of Meteorology
List of Nominations Connecting User Needs with Weather Research and Forecasts Rebecca E. Morss National Center for Atmospheric Research Boulder, Colorado,
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
US post-THORPEX Legacy Program* DRAFT Version 2 (pre-USTEC meeting) S. J. Majumdar, E. K. M. Chang, M. Pena July 14, 2014 * Program name TBD.
Adaptations to Climate Change in Africa’s Water Sector: Contributions of the World Meteorological Organization Datius Rutashobya Climate and Water Department.
Societal Impacts of Weather and Climate at NCAR July 27, 2005 Susi Moser, ISSE Jeff Lazo, RAL, ISSE Presentation to the NCAR Executive Committee and Strategic.
Proposal for a WWRP High Impact Weather Project Sarah Jones, Brian Golding Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat.
Proposal for a WWRP High Impact Weather Project Sarah Jones, Brian Golding Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat.
Flooding from Intense Rainfall. Seven Science Themes.
0 Future NWS Activities in Support of Renewable Energy* Dr. David Green NOAA, NWS Office of Climate, Water & Weather Services AMS Summer Community Meeting.
Natural Hazards. Integrated Risk Assessment & Scientific Advice Uncertainty in forecasting and risk assessment Hydro-meteorologicalVolcanoesEarthquakes.
World Meteorological Organization Working together in weather, climate and water Addressing climate variability, extremes and natural disasters for LDC.
FLOOD RISK AND UNCERTAINTY Assessing the National Weather Service’s Flood Forecast and Warning Tools Rachel Hogan Carr WWOSC August 18, 2014.
Weather, Water, Climate Services Supporting Sustainable Development Jerry Lengoasa Deputy Director General Oslo, May 2014 World Meteorological.
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
Challenges in Urban Meteorology: A Forum for Users and Providers OFCM Panel Summaries Bob Dumont Senior Staff Meteorologist OFCM.
Office of Coast Survey NOAA’s Storm Surge Roadmap: a Pathway to Improved Products and Services Jesse C. Feyen Storm Surge Roadmap Portfolio Manager.
Challenges in Urban Meteorology: A Forum for Users and Providers OFCM Workshop Summaries Lt Col Rob Rizza Assistant Federal Coordinator for USAF/USA Affairs.
Using Partnerships to Meet NOAA’s Needs for its Next Generation Storm Surge System NOS/OCS/CSDL J. Feyen F. Aikman M. Erickson NWS/NCEP/EMC H. Tolman NWS/OST/MDL.
2007 Climate Workshop NWS Eastern Region and Southern Region Chet Ropelewski Climate Assessment and Services Division NOAA Climate Program Office (CPO)
CDC Cover. NOAA Lab roles in CCSP Strategic Plan for the U.S. Climate Change Science Program: Research Elements Element 3. Atmospheric Composition Aeronomy.
NWS Social Science Activities David Caldwell, Director NWS Office of Climate, Weather and Water & Jennifer M. Sprague NWS Social Science Focal Point OFCM.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
1 Precipitation verification Precipitation verification is still in a testing stage due to the lack of station observation data in some regions
NOAA’s NWS and the USGS: Partnering to Meet America’s Water Information Needs Dr. Thomas Graziano Chief, Hydrologic Services Division NOAA National Weather.
European Cooperation on Nowcasting Yong Wang, ZAMG.
Office of Science Office of Biological and Environmental Research DOE Workshop on Community Modeling and Long-term Predictions of the Integrated Water.
WWRP The THORPEX Mid-Term Review David Burridge Of no particular abode.
Innovative Program of Climate Change Projection for the 21st century (KAKUSHIN Program) Innovative Program of Climate Change Projection for the 21st century.
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
CPPA Past/Ongoing Activities - Ocean-Atmosphere Interactions - Address systematic ocean-atmosphere model biases - Eastern Pacific Investigation of Climate.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative WMO Headquarters Geneva, 08 – 10 December 2009 INTRODUCTION TO THE WORKSHOP.
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
Insert Date 1 Hurricanes-Inundation Overview Objectives: Improve forecasts of tropical cyclones and related inundation hazards to enhance mitigation decisions.
US High-Impact Weather Initiative DRAFT S. J. Majumdar, E. K. M. Chang, M. Pena and Z. Toth July 2, 2014.
A THORPEX Pacific Predictability Experiment: User and Social Science Research Perspectives Rebecca E. Morss National Center for Atmospheric Research (Thanks.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
Climate Services: The Pacific Climate Information System (PaCIS) Approach Eileen L. Shea NOAA IDEA Center 31 st Climate Diagnostics.
Global public policy network on water management Water and Climate Change Adaptation – Key Messages for COP-15 gppn.
HIWeather “Research for Resilience” Brian Golding, Jenny Sun (presented by Sharan Majumdar) 8 th DAOS WG Meeting, Beijing, China October 27 th,
World Weather Research Programme What / How does the Programme help the Society? (Item 3.3) 24 May 2011.
Multi Hazard, Impact Based forecasting and warning services
Proposed THORPEX/HEPEX Hydrologic Ensemble Project (THEPS) Presentation for 3 rd THORPEX Science Symposium September 14-18, 2009 Prepared by John Schaake,
Forecasting systems WMO Atmospheric Research and Environment Programme David Burridge.
Focus areas of the NWS Missouri/Souris River Floods of May-August 2011 Service Assessment – Per the NOAA and NWS Strategic Plans, gather stakeholder input.
NOAA Climate Program Office Richard D. Rosen Senior Advisor for Climate Research CICS Science Meeting College Park, MD September 9, 2010.
Seamless forecasting in time, space and complexity
Climate Mission Outcome A predictive understanding of the global climate system on time scales of weeks to decades with quantified uncertainties sufficient.
TOWARDS DEVELOPMENT OF THORPEX AFRICA PLAN Andre KAMGA FOAMOUHOUE ACMAD For THORPEX AFRICA REGIONAL COMMITTEE 88 th AMS Annual meeting, Jan 20-24, New.
1 NOAA’s Integrated Water Forecasting Program Gary Carter Director, NWS Office of Hydrologic Development Manager, NOAA Integrated Water Forecasting Program.
For GAW SSC meeting, 18 February Alexander Baklanov, ARE WMO.
Commission for Atmospheric Science World Weather Research Programme
The World Weather Research Programme
WG on Nowcasting Research World Meteorological Organization
Improved weather forecasts and warnings through enhancing partnerships across the science, policy, and practice communities David Johnston Joint Centre.
Jeanine Jones, Western States Water Council
Peter May and Beth Ebert CAWCR Bureau of Meteorology Australia
Hydro-Meteorological and Early Warning Services in the Caribbean
WMO NWP Wokshop: Blending Breakout
Causes of improvements to NWP (1979 – 2009)
Public Weather Services and Nowcasting
Science of Rainstorms with applications to Flood Forecasting
High Impact Weather Emerging challenge identified at CASXVI
MOGREPS developments and TIGGE
Peter May and Beth Ebert CAWCR Bureau of Meteorology Australia
Enhancing WMO and CEOS COLLABORATION
Presentation transcript:

The High Impact Weather Project: a proposal for a WWRP research activity Sarah Jones, Brian Golding Carlos Angelis, Philippe Arbogast, Ana Barros, Aida Diongue, Beth Ebert, Grant Elliott, Pat Harr, Tim Hewson, Julia Keller, Stefan Klink, Sharan Majumdar, Rebecca Morss, Florian Pappenberger, David Richardson, Paola Salio, Peter Steinle, Jenny Sun, Richard Swinbank, Zoltan Toth, Jianjie Wang, Heini Wernli, Hui Yu 2 nd HIWeather Workshop 2 June 2014, Silver Spring, Maryland, USA Christof Stache/AFP/ Getty Images Alexandros Vlachos/EPA Marina Shemesh / publicdomainpictures.net NOAA NWS

Substantial advances made in forecasting capability and emergency preparedness …………. ……… but weather-related disasters still have high socio-economic impacts. THORPEX delivered major advances in the science of weather forecasting for one day to two weeks ahead. Why do we need a new project?

New capabilities in short range forecasting (new observations, convective-scale probabilistic NWP) Advances in coupling prediction models Better understanding of the challenges to achieve effective responses to warnings Time is ripe to capitalise on these advances! Why do we need a new project? Substantial advances made in forecasting capability and emergency preparedness …………. ……… but weather-related disasters still have high socio-economic impacts. THORPEX delivered major advances in the science of weather forecasting for one day to two weeks ahead.

Benefit of new High Impact Weather Project Shaped by needs for applications, assessed through communication and interaction with stakeholders Focus on future needs of WMO members for decreasing vulnerability to High Impact Weather by considering urbanisation, increasing population, demographic changes, …….. Incorporate and foster advances in new predictive capability (e.g. cloud resolving ensembles) Focus on predictive time scales of minutes to two-weeks, build upon THORPEX to improve warnings on High Impact Weather events

The overall objective of the High Impact Weather Project is to: “Promote cooperative international research to achieve a dramatic increase in resilience to high impact weather, worldwide, through improving forecasts for timescales of minutes to two weeks and enhancing their communication and utility in social, economic and environmental applications” Mission of Project

Scope and limits of project defined by a set of weather – related hazards and corresponding applications

Vulner- ability & Risk Multi- scale Forecasts Eval- uation Commu- nication Predict- ability & Processes Scope and limits of project defined by a set of weather – related hazards and corresponding applications

Vulner- ability & Risk Multi- scale Forecasts Eval- uation Commu- nication Predict- ability & Processes Impact Forecasting Verification Knowledge Transfer Field campaigns & demonstrations Uncertainty Design of observing strategies Applications in the forecasting process Data Management & Archiving Cross-cutting activities:  application of key common areas of expertise;  pooling of skills and resources

Example: Hazard of Urban Flooding Increase resilience to such events Social Economic Environmental Response time line COMET® UCAR Stefan Penninger What do users/stakeholders need?

Example: Hazard of Urban Flooding COMET® UCAR Stefan Penninger Predictability & Processes Develop understanding of processes relevant for initiation and evolution of weather systems related to hazard and the processes that are important for their understanding Danish Met Office Courtesy F. Pappenberger Moore et al., 2012 MWR Some Key Challenges: Predict location and timing especially from convective cell rainfall or extreme and unusual events. Improve model representation on larger scale as prerequisite Representation of interactions

Example: Hazard of Urban Flooding COMET® UCAR Stefan Penninger Multi-Scale Forecasting Enhance multi-scale prediction of variables needed to forecast weather impacts in coupled modelling systems Some Key Challenges: Larger scale synoptic and topographic effects and resolve increased surface roughness, microphysical processes Improve observational, remote sensing and nowcasting systems as well as seamless-scale cross predicting systems Assimilation of various observations continuously in time Developing and using coupled systems

Example: Hazard of Urban Flooding COMET® UCAR Stefan Penninger Vulnerability & Risk Produce more relevant forecasts and warnings through assessment of the impact of the predicted hazard on individuals, communities and businesses, their vulnerability and hence their risk Some Key Challenges: Defining exposure and vulnerability in a dynamic environment Information on draining systems and juxtaposition of river and urban flooding NWS UNISDR

Example: Hazard of Urban Flooding COMET® UCAR Stefan Penninger User-oriented Evaluation Some Key Challenges: Spectrum of metrics to evaluate model performance, for traditional meteorological quantities to hazards such a type and duration of precipitation Lack of observational data at all scales Lack of guidance on reporting damage and loss during floods making comparisons across different testbeds difficult NCEP NWS

Example: Hazard of Urban Flooding COMET® UCAR Stefan Penninger Communication Achieve more effective responses to forecasts through better communication of forecasts and warnings of hazards and their impacts Some Key Challenges: Understand audiences capabilities, needs, perspectives and decision Consider differences in most effective way for communication in different regions Consider new ways of communication Implementation of flood management and response plans under uncertainties using probabilities effectively Deconstruct institutional barriers DWD UNISDR

Proposal was recommended by WMO/WWRP/Commission of Atmospheric Sciences in Nov 2013 International workshop was held here on 2-4 June to focus the Implementation Plan Aim: to finalize the Implementation Plan before November 2014 HIWeather expected to begin in 2015, with an International Trust Fund and International Coordination Office Status of HIWeather