RAVE MEETING BALTIMORE May 2008 Status of the 3 rd 6dF field plate and the new RAVE observing support model. Q.A.Parker (AAO/Mac.Uni) Fred Watson (AAO)

Slides:



Advertisements
Similar presentations
Introduction Leasing and hire purchase are financial facilities which allow a business to use an asset over a fixed period, in return for regular payments.
Advertisements

Genetic Technologist – Rotation The Birmingham Experience.
The University of Queensland November 2014 Professor Marian Simms Executive Director, Social, Behavioural and Economic Sciences (SBE) Funding Prospects.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
RAVE status report Matthias Steinmetz (AIP) June RAVE collaboration meeting - Padova Data collection  325k spectra for 280k stars (Jan.
Project Management in the Solomon Environment Project Manager orientation.
Trust Policy The Trust aims to maintain a workforce that is highly skilled, competent and flexible and one that puts the patient at the centre of maintaining.
By Ben Youn Copyright 2015 Quantum Business House WELCOME to QUANTUM BUSINESS HOUSE.
0 FY14 State Budget Discussion EEC Board Meeting May 13, 2013.
INSPIRE vs. PSI re-use Directives comparison Roger Longhorn Director, Info-Dynamics Research Associates Ltd /
EU’s 7th framework program ( ) Cooperation Ideas (=ERC) People Capacities European Research Council (ERC) ERC The result of strong pressure from.
ARC DP08 Budgets Flight DP08 from Monash to ARC Dr Kathy Avent Research Coordinator Monash University Research Office January 2007.
The Analyst as a Project Manager
Developing introductory training in R Ria Sanderson, Duncan Elliott, ONS.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Grantsmanship for Graduate Students PACES Professional Development Program 1/17/15 Salvatore Alaimo, PhD - Assistant Professor.
Redefining Research Capacity in a Changing Higher Education Landscape Sydney Southeast Asia Centre Associate Professor Michele Ford Some Reflections On.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Grant-Writing Boot Camp © 2015 A.G. Williams Grant-Writing Boot Camp TWO DAY TWO.
The Private Finance Initiative n Advantages * Benefits of the PFI The major appeal of the PFI for the government is that the cost of the hospital does.
Canadian Institutes of Health Research New Open Suite of Programs and Peer Review Enhancements University of Manitoba February 14, 2012.
System Planning- Preliminary investigation
This page is intentionally blank. A new view of the Universe VIII Fred Watson (and the RAVErs) April 2005 A new view of the Universe VIII Fred Watson.
Pensions Board Submission to the Commission on Taxation Yvonne White The Pensions Board Monday 26 th May
Presentation by Wendy Launder General Manager CRC and Small Business Programs.
Overview of the SPDG Competition Jennifer Doolittle, Ph.D. 1.
Hands-on experience on medium-sized telescopes or: The need to train young researchers in observing techniques M. Dennefeld IAP-Paris and University Paris.
Developing a result-oriented Operational Plan Training
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Observing modes at the AT ATUC Presentations October 2000 Ray Norris CSIRO Australia Telescope National Facility.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Principles of Engineering Economic Analysis, 5th edition Chapter 15 Capital Budgeting.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Dr Ilse Vickers, Adviser on European Research Strategy London Higher, 10 October 2008 EU Funding Winning FP7 Contracts EU Funding Winning FP7 Contracts.
MNRF Management and milestone achievements Chris Evans AAO.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Overview Goal Setting. Budget The Importance of Budgeting Preparation of an annual budget and continuous budget monitoring allows management to anticipate.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
The 6dF VPH Upgrade and other instrumental issues Will Saunders, Martin Ostreich, Allan Lankshear, Brendan Jones, Mick Kanonczuk, Kristin Fiegert, John.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
6dF workshsopATNF May 30th dF: Observing, data reduction & dataflow Q.A.Parker Macquarie University/AAO.
Cost Sharing. Objectives Review roles and responsibilities Facilitate pro-active, continuous monitoring of cost share commitments Review Cost Share Summary.
1 Phase 2 Grant Renewals - March A- Overview A.1- Performance-based Funding Y1Y2Y3Y4Y5 Proposal Initial Grant Agreement(s)Extension of Grant.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
The 6dF Galaxy Survey - The First Year Will Saunders Anglo-Australian Observatory.
Postdoctorals: Why and How? R. Stephen Berry The University of Chicago.
1 Chapter 13 (Week 13) SYSTEMS MAINTENANCE AND EVALUATION Chapter 13: SYSTEMS MAINTENANCE AND EVALUATION Throughout its life, a system should operate effectively.
TIME AND EFFORT NEW FLEXIBILITY GUIDELINES. ALLOCATING PAYROLL COSTS: TIME DISTRIBUTION Rules set out in OMB Circular A-87  Must demonstrate that employees.
24 October 2006 Industry Dialogue on xoserve services – Work Plan.
A PRACTICAL GUIDE TO MANAGING DEBT INTRODUCTION. WARNING THIS DOCUMENT IS PROVIDED BY THE AUTHOR (DIRECT FINANCIAL GROUP LTD) ON AN "AS IS" BASIS. THE.
AST3-NIR camera for the AST3-3 telescope for the Kunlun Infrared Sky Survey (KISS) Management and planning Julia Tims, Jon Lawrence 20 August 2015.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
CTIS Committee Meeting March 23 rd 2016 Chairwoman Jan Hallums-Quillman Councilwoman Bettye Gavin Councilman Pat Mudron.
The FlexiCare Grant. Content Objectives for Flexicare Background and rationale How Flexicare will work FAQs.
What Field Personnel Need to Know about Retirement Planning
THE ROTARY FOUNDATION VOCATIONAL TRAINING
The Second Stage Consultation on Fair Funding for Schools
Contract Award Procedures
CFI Requirements – Institutional Commitment and Sustainability
High needs funding reform – what will it mean for LAs and providers?
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
Update on Spanish Recruitment: Students, Staff, Fellows, Associates
Grant Writing Information Session
A Managers Guide to Parental Leave
The Preparation Phase: Part III: financial issues
How Do I Write a Good Technology Plan?
Session 2-B Applying for and Implementing a Grant
Presentation transcript:

RAVE MEETING BALTIMORE May 2008 Status of the 3 rd 6dF field plate and the new RAVE observing support model. Q.A.Parker (AAO/Mac.Uni) Fred Watson (AAO)

RAVE MEETING BALTIMORE May dF FP3 Rationale One of the largest impacts on current RAVE survey productivity has been the necessity to remove one of the two existing 6dF field plates from service on a regular basis for preventative maintenance, fibre and button repairs and cleaning. This is an extremely time-consuming and pains-taking process due to the small and fragile nature of the optical fibres and their -button-prism assemblies. A 6dF field plate can be out of operation for up to 2 weeks during this time and for 2-3 times per year (but 2008 has been especially bad). As this has to be done for each current field plate this amounts to a significant ( 30%) loss in observational efficiency when either field plate in unavailable at the telescope (which is also about 15% of the time). This has been a recognised problem with the facility and the initial intention was always to have a 3rd field plate available for 6dF. An ARC LIEF grant was awarded to address this very issue.

RAVE MEETING BALTIMORE May 2008 Total current FP3 budget ARC contribution: $223, ARC contribution: $223, Partner cash contributions: $150,000 Partner cash contributions: $150,000 AIP in-kind: $40,000 AIP in-kind: $40,000 Total budget envelope: $373,000+$40,000 = $413,000 Total budget envelope: $373,000+$40,000 = $413,000 Additional items not included in the original budget estimate but largely already completed out of contingency: Additional items not included in the original budget estimate but largely already completed out of contingency: Software/electronics modifications to 6dF Robot so it recognises a 3 rd field plate – this has already been done Software/electronics modifications to 6dF Robot so it recognises a 3 rd field plate – this has already been done Software changes to 6dF configure so it can configure a 3 rd field plate - again this has already been done Software changes to 6dF configure so it can configure a 3 rd field plate - again this has already been done Possible changes to the ANU supplied CICADA 6DF CCD operating system – this has yet to be done Possible changes to the ANU supplied CICADA 6DF CCD operating system – this has yet to be done Note there was no provision for modifications to the existing field plates within the LIEF bid but that there remains some scope to implement modest upgrades here too. Note there was no provision for modifications to the existing field plates within the LIEF bid but that there remains some scope to implement modest upgrades here too.

RAVE MEETING BALTIMORE May 2008 Agreed partner contributions * Note the AIP has also agreed to contribute $40,000 in additional in kind support.

RAVE MEETING BALTIMORE May 2008 OUTCOMES Provision of a 3rd field plate that will ensure a minimum of 800 stars per average night and considerably alleviate observer stress. When all 3 field plates are available for use (i.e. non in preventative maintenance), which should be for 70% of the time, this should increase to stars per night. This is a substantial 50% increase in productivity for a relatively modest input of funds There would be excellent prospects of obtaining 150,000 additional stellar spectra for RAVE over the expected survey lifetime.

RAVE MEETING BALTIMORE May 2008 RAVE Operational arrangements: Management, access, time allocation The AAO will maintain overall responsibility for the on-site operation and support of the UKST and 6DF facility up to and including when the 3rd field plate is commissioned. The AAO will build, commission and house the 3rd field plate and continue to take overall operational responsibility for the whole 6DF facility. The AAO has sub-contracted the AIP to provide the fibre button and slit assembllies Access to the facility is covered by a modification to the current memorandum of understanding between the AAO and the RAVE consortium. In principle other groups either within Australia or overseas, can approach the AAO and the RAVE consortium to purchase nights on the facility for other scientific projects. Such access will depend on the availability of spare time within the RAVE survey operational model.

RAVE MEETING BALTIMORE May 2008 Current Timeframe The new field plate was scoped as a 1 year to build. However, the project only really began in March 2007 Assuming completion by mid 2008 this will give a minimum of 3 years operational life until the planned RAVE survey completion in An extended lifetime for the 6DF facility post RAVE is also anticipated so the 3 rd field plate would be of considerable benefit for any such future 6DF science missions. Once commissioned it will be of immediate benefit and afford substantial gains in operational flexibility, survey efficiency, productivity and cost-effectiveness.

RAVE MEETING BALTIMORE May 2008

New RAVE observer support model SUMMARY: SUMMARY: RAVE has been short of observers and desperately needs some certainty in the scheduling RAVE has been short of observers and desperately needs some certainty in the scheduling Note: RAVE observing is very intensive so there is no prospect of even temporarily increasing the observing load of the remaining RAVE observers from 5 to 6 nights to reduce the level of unallocated nights in the current schedule. Note: RAVE observing is very intensive so there is no prospect of even temporarily increasing the observing load of the remaining RAVE observers from 5 to 6 nights to reduce the level of unallocated nights in the current schedule. A ‘Macquarie model’ has thus been established to plug this gap A ‘Macquarie model’ has thus been established to plug this gap It involves my RAVE postdoc Warren Reid and RAVE PhD student Andreas Ritter who is already now trained. It involves my RAVE postdoc Warren Reid and RAVE PhD student Andreas Ritter who is already now trained. This is a very low cost model. This is a very low cost model. The RAVE ARC DP already pays Warren’s salary while Andreas is also funded from Macquarie funds (this cost is modest). The RAVE ARC DP already pays Warren’s salary while Andreas is also funded from Macquarie funds (this cost is modest). The AAO has agreed to fund lodge and travel costs for both Reid and Ritter for the life of the RAVE project The AAO has agreed to fund lodge and travel costs for both Reid and Ritter for the life of the RAVE project The AAO will continue to provide 4 in-house observers and has just appointed a new RAVE observer to take over from Ken Russell: Dr. Milorad Stupar The AAO will continue to provide 4 in-house observers and has just appointed a new RAVE observer to take over from Ken Russell: Dr. Milorad Stupar

RAVE MEETING BALTIMORE May 2008 Rationale From Sem06A, 6dF became solely used for RAVE. From Sem06A, 6dF became solely used for RAVE. The support model operating until Sem07B involved 4 AAO observers using 4x5 night allocations and one `Guest RAVE observer’ under the PhD/Postdoc supplementary observer model The support model operating until Sem07B involved 4 AAO observers using 4x5 night allocations and one `Guest RAVE observer’ under the PhD/Postdoc supplementary observer model Personnel came from within the RAVE consortium. Personnel came from within the RAVE consortium. There have been 4 such additional observers found: Lionel Velz (Strasbourg), Corrado Boeche (Postdam), Borja Anquiano (Postdam) and lately Mary Williams (Potsdam) who, after training, undertook 11 solo RAVE runs between them in Sem06A and Sem08A covering a reasonable but ad-hoc fraction of non-AAO supported remaining RAVE slots. There have been 4 such additional observers found: Lionel Velz (Strasbourg), Corrado Boeche (Postdam), Borja Anquiano (Postdam) and lately Mary Williams (Potsdam) who, after training, undertook 11 solo RAVE runs between them in Sem06A and Sem08A covering a reasonable but ad-hoc fraction of non-AAO supported remaining RAVE slots.

RAVE MEETING BALTIMORE May 2008 Details of the Macquarie model Warren and Andreas carry out RAVE observing for a total of ~65 nights per year (6 or 7 x 5-night runs each). Warren and Andreas carry out RAVE observing for a total of ~65 nights per year (6 or 7 x 5-night runs each). They very likely will be available to continue from now until the end of 2010 (when the current RAVE observing phase may end) subject to funding for Andreas. They very likely will be available to continue from now until the end of 2010 (when the current RAVE observing phase may end) subject to funding for Andreas. This model immediately plugs the gap created by lack of regular guest RAVE observers. This model immediately plugs the gap created by lack of regular guest RAVE observers. There are many advantages in using Macquarie astronomers as RAVE observers: There are many advantages in using Macquarie astronomers as RAVE observers: Both Warren and Andreas have visited UKST and have hands-on RAVE/6dF experience, so they know exactly what to expect. Both Warren and Andreas have visited UKST and have hands-on RAVE/6dF experience, so they know exactly what to expect. Both are experienced observers and Andreas is already trained to solo RAVE observing status with Warren to follow shortly Both are experienced observers and Andreas is already trained to solo RAVE observing status with Warren to follow shortly Being Sydney based, both have access to AAO Epping/infrastrucure. Being Sydney based, both have access to AAO Epping/infrastrucure. Warren (and Andreas for at least 2008) do not need direct wage/salary funding from the AAO. Warren (and Andreas for at least 2008) do not need direct wage/salary funding from the AAO. The AAO has agreed to fund travel and Lodge costs for these Australian based observers under the scheme that operates for observers to the AAT. The AAO has agreed to fund travel and Lodge costs for these Australian based observers under the scheme that operates for observers to the AAT.

RAVE MEETING BALTIMORE May 2008 Other advantages of this model It is a great advantage to involve active RAVE research scientists and real astronomers in the data-gathering process. It is a great advantage to involve active RAVE research scientists and real astronomers in the data-gathering process. They have a vested interest in the success of RAVE and their careers/publications should also benefit. They have a vested interest in the success of RAVE and their careers/publications should also benefit. With Warren and Andreas becoming regular RAVE observers over a 2-3 year period, they offer excellent continuity and will acquire considerable experience and expertise in obtaining RAVE data. With Warren and Andreas becoming regular RAVE observers over a 2-3 year period, they offer excellent continuity and will acquire considerable experience and expertise in obtaining RAVE data. Over the next 3 years Sydney-based observers offer: Over the next 3 years Sydney-based observers offer: local, in-house scheduling control, local, in-house scheduling control, flexibility and certainty flexibility and certainty this is exactly what RAVE needs to ensure continued observing productivity. this is exactly what RAVE needs to ensure continued observing productivity. Extra observers from the consortium are still encouraged and could use more of the currently unscheduled BOM time to completely maximize RAVE observing opportunities. Extra observers from the consortium are still encouraged and could use more of the currently unscheduled BOM time to completely maximize RAVE observing opportunities.

RAVE MEETING BALTIMORE May 2008 Summary An attractive, feasible and immediately implementable model has been outlined. An attractive, feasible and immediately implementable model has been outlined. It will ensure complete coverage of RAVE observing throughout 2008 and in all likelihood through to the end of the RAVE survey in It will ensure complete coverage of RAVE observing throughout 2008 and in all likelihood through to the end of the RAVE survey in There are considerable advantages to this model. There are considerable advantages to this model. It offers cost-effectiveness, immediacy, stability and some level of support certainty. It offers cost-effectiveness, immediacy, stability and some level of support certainty. It does not prevent additional guest observers from within the RAVE consortium coming out under OPTICON funding at any stage, which is very much encouraged. It does not prevent additional guest observers from within the RAVE consortium coming out under OPTICON funding at any stage, which is very much encouraged. There are still BOM nights that can be effectively used and opportunities to cover absences, sickness and other unforeseen eventualities. There are still BOM nights that can be effectively used and opportunities to cover absences, sickness and other unforeseen eventualities.