ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

LHCb HCAL PMT problems HAMAMATSU studies 1 Yu. Guz.
1 TOF Aging Issues Pre-history Operating history Observations related to gain loss Impact on timing resolution Possible courses of action April 6, 2006.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Mechanical check of PMT Check base: Remove black tape and two small screws that secure the base. Tighten the nuts on the BNC connector for the HT input.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University Angular Response of 10inch PMT.
Angular Response of 10inch PMT for IceCube Hiroko Miyamoto Dept. of Physics Chiba University.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 HERSCHEL: PMT status report The order to replicate PCB for divider of R has been launched on a) digital file for production(promised.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015.
MINERvA Main INjector ExpeRiment for -A is the symbol for the neutrino. The beam that is sent to MINERvA is made out of neutrinos. In chemistry, an A stands.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Yu. Guz 13/06/ ECAL LED system : degradation of clear fibers The radiation degradation of clear fibers of the LED system is (still) well pronounced.
Calorimeter Status Pascal Perret LPC Clermont 22 March 2011.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Cold PM test at Indiana final measurements, September 9 – 24, 2007 PM under test: Hamamatsu R7725 serial # ZK3692 (tube with Pt underlayer) Hans-Otto Meyer.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Upgrade of the LHCb ECAL monitoring system Yu. Guz (IHEP Protvino / CERN), on behalf of the LHCb collaboration 07/04/2014.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
Calorimeter Status: Preparing RUN II Pascal Perret LPC Clermont 25 February 2014.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
Calorimeter Outline: Detector status Calibration Upgrade Yu. Guz, IHEP, Protvino.
The LHCb Calorimeter system
PMT/CW Irradiation tests-2010
ACTIVE DIVIDER for anode currents up to 10 microamps
2009: restart the system: few observations. Hw maintenance week:
Status of the TOF Detector
LHCb HCAL: performance and calibration
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

ECAL and HCAL status 1Yu. Guz 2014/11/26

TED shots, 24-Nov 2Yu. Guz 2014/11/26

HCAL 137 Cs calibration 18-19/11/2014 3Yu. Guz 2014/11/26 The 137 Cs sources installed into HCAL on 03/11/2014; The calibration performed 18-19/03/2014 (two runs) Two goals produce new HV, after 2 years and 193 PMT replacements (121 new PMTs) ==> quite significant HV changes expected one source passage, i.e. assumed α unchanged (G=G 0 ·HV α ) a new PHYSICS recipe created (preliminary) test linux version of the calibration s/w (Vasily Kudryavtsev, BINP) one source passage at side C; minor problems found Need 1-2 runs more finalize the linux version perform 3 source passages at different HV, in order to determine both G 0 and α

ECAL 4Yu. Guz 2014/11/26 Few dead cells appeared after closing the detector (one of them makes the whole power line, 20 PMTs, not working). There will be a chance to access, in a shadow of MUON work.

HCAL PMT problem – follow-up 5Yu. Guz 2014/11/26 Found by HAMAMATSU experts: the vacuum inside the PMT bulb is not degraded, no micro cracks in glass the problems (dark current etc) are caused by migration of alcali inside the bulb one PMT had been baked for 1.5 hour at 125 o C – the behavior improved significantly however the HAMAMATSU experts do not expect the improvement to be stable for long term The differences in PMT operation conditions between HCAL and ECAL: higher voltage: 900 – 1300 V in HCAL vs 600 – 900 V in ECAL (max 1800 V according to the datasheet) electrostatic: the magnetic shielding in HCAL is grounded black paint applied to HCAL PMTs for light tightness (may contribute to electrostatic conditions) some mechanical stress in HCAL PMTS (can lead to micro cracks and degradation of vacuum – discarded by HAMAMATSU studies, see below) From HAMAMATSU: light emission shows the place where dark current occurs

6Yu. Guz 2014/11/26 While the way of degradation was found (migration of alcalis within PMT bulb), the reason why it happens in ECAL and not in ECAL is unclear. We can only make hypotheses. The differences in the HCAL/ECAL operating conditions which can be relevant are only somewhat higher voltage (900 – 1300 vs 600 – 900) in combination with electrostatic conditions (grounded bulb) The limit operating voltage for this type of PMTs is 1800 V according to the specs, it is not exceeded. However an additional factor leading to the decrease of allowed voltages can be the special treatment of the dynode system, which HAMAMATSU made for us in order to decrease the rate effect When purchasing additional PMTs from HAMAMATSU, we can think of asking them to produce (a significant part of) PMTs without such treatment. The rate effect will of course become larger; however it will be mitigated by the 11 kHz LED pulsing. It can be a good compromise for (most of) HCAL, where the requirements are not very tight (5% will be good enough) – of course if the guess is right and PMTs without treatment will not experience such degradation We can also try to modify the electrostatic conditions in HCAL, by, e.g., wrapping the µ-metal shield with kapton tape In the meanwhile, we can bake the bad PMTs (we have ~150 for the moment) and see whether it will help; however HAMAMATSU experts do not expect steady improvement HCAL PMT problem – follow-up

7 CALO operation at high lumi (slides from 2012)

Yu. Guz high lumi test HCAL PMT anode currents at Factor of 2.5 wrt normal 4· The current is up to 50 µA (max 100 µA according to the datasheet) The system of measurement of current is close to limit at the 4 central counters 04/12/2012 L=10 33

Yu. Guz ECAL PMT anode currents at Factor of 2.5 wrt normal 4· Sensitivity is ~ 100 DCU counts per 1 µA (current up to 10 – 12 µA ) high lumi test 04/12/2012

Yu. Guz MV currents in HCAL and ECAL – only slight increase compared to normal. high lumi test 04/12/2012

Yu. Guz high lumi test hctell04 & hctell05pstell03 & pstell06 30/11/2012, run , L=6·10 32 Stephane T. few TELL1s close to the bandwidth limit

Yu. Guz 2014/02/1912 The PMTs in HCAL and ECAL centre will not exceed the max allowed DC anode current The TELL1s system, after the recent modifications, will not saturate The radiation damage Probably after Run II at high lumi (10 fb -1 ) we will have to replace inner ECAL modules already in LS2 Also some CW boards in ECAL central cells will have to be replaced, maybe during Christmas shutdowns HCAL central cells degradation – consequences for trigger? (most probably not severe) CALO operation at higher lumi in Run II