Federal Organizational-Level EMS Workgroup Overview and Status James Wozniak (DLA) Steve Woodbury (DOE) Federal Environmental Symposium East & West June.

Slides:



Advertisements
Similar presentations
Checking & Corrective Action
Advertisements

Documentation and Document Control
Environmental Management Systems Refresher
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Training, Awareness and Competence EPA Regions 9 & 10 and The Federal Network for Sustainability.
4/30/20151 Quality Assurance Overview. 4/30/20152 Quality Assurance System Overview FY 04/05- new Quality Assurance tools implemented, taking into consideration.
Accreditation 1. Purpose of the Module - To create knowledge and understanding on accreditation system - To build capacity of National Governments/ focal.
October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Code of Practice Art Wall
Audit Considerations of Data Center Consolidation Jon Ingram Audit Manager Information Technology Audits Florida Auditor General 1.
EMS Auditing Definitions
Getting Your EMS Started: Policy Statements EPA Regions 9 & 10 and The Federal Network for Sustainability.
Environmental Management Systems Refresher
Office of Inspector General (OIG) Internal Audit
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Applying a Systems Approach EPA Regions 9 & 10 and The Federal Network for Sustainability.
ISO Environmental Management System (EMS)
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
Quality Representative Training Version
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
1111 AS9104/1 and Potential Impacts to Your AS Registration November 16, 2012 Presented by Pete Kucan Director of PRI Registrar Operations.
Key changes and transition process
Key changes from OHSAS 18001:1999
International Auditing and Assurance Standards Board The Clarified ISAs, Audit Documentation, and SME Audit Considerations ISA Implementation Support Module.
Implementation of DOE Order 450.1: Self-Declaration and Report Letters Steven R. Woodbury US Department of Energy March 9, 2005.
Michelle Barton – Lead Technical Reviewer/Auditor UL DQS Inc.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
How To Apply Quality Management
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Overview report of a series of FVO fact- finding missions and audits carried out in 2012 and 2013 in order to evaluate the systems put in place to give.
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Oilpalm.wildasia.org RSPO SCC Standard Group Certification (Part 3) RSPO LEAD AUDITOR SERIES SCCS M2c May 2013.
1 1 UNDP’s Financial Management and Assurance March 2007.
Best Practices: Where Industry Should Lead on Ensuring Proper Testing & Auditing Stephen F. Sundlof, DVM, PhD Senior Advisor for Animal and Food Safety.
Federal Aviation Administration Presented to: By: Date: Oversight Throughout the Supply Chain: Is It Adequate? DOT OIG Audit: Assessment of FAA's Risk-Based.
Company Confidential 1 AS9104/1 Transition and Oversight Assessment of Certification Bodies Mike Roberts 12 March 2012.
Supreme Audit Office (the NIK): Basic Facts Riga, 4 April 2012.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Carl Wirdak Occidental Petroleum Corporation GEMI Gemstones Environmental Management Systems GEMI Conference March 2003.
Hosted by AAQG RMC Certification Structures Impacts to Auditors Impacts to Stakeholders Transition.
Company Confidential 1 Other Party Management (OPMT) 9104/1 Special Sub Team Recommendation Summary Tim Lee & Ian Folland June 23, 2010.
ISO Registration Common Areas of Nonconformances.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures July 22, 2015 Tim Lee Chair - IAQG OPMT The Boeing Company RMC.
Measuring EMS Implementation Larry Stirling Office of Air, Water and Radiation Policy and Guidance EH-41 March 25, 2004.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Rev4 srw Report of the Metrics Subgroup Mike Green, NASA May 21, 2008 Interagency Environmental Leadership Workgroup.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Company Confidential 1 Other Party Management (OPMT) 9104/1 Special Sub Team Recommendation Summary Tim Lee September 14, 2010.
Company Confidential IAQG Workshop October 21, IAQG Workshop 9100 Certification Scheme Certification status – Changes implemented Tim Lee The Boeing.
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
IAEA International Atomic Energy Agency Radiation protection of the public IAEA Regional Training Course on Radiation Protection of patients for Radiographers,
Federal Organizational-Level EMS Workgroup Overview and Status Steven Woodbury (Department of Energy) James Wozniak (Defense Logistics Agency) for the.
 A consciously coordinated social unit composed of people having resources at their command functioning on a continuous basis to achieve common goal.
EMS Organizational Implementation Model Presented by James Chitty Defense Reutilization and Marketing Service June 2008.
Protocol 4.1 Main changes (compared to Protocol 4.0)
International Institute of Christian Discipleship CS 05d Technical Aspects of Community Services Ministry: Grant Proposal Writing General Conference of.
Department of Defense Federal EMS Metrics – Development and Scoring Major Aaron Altwies, USAF 5 June Federal Environmental Symposium.
ISO 14001:2004 Clause 4.3 Planning. Clause 4.3 Planning Key Requirements of Environmental Management System Certification.
Issues that Matter Notification and Escalation
Lecture 15 Environmental auditing
IAF Cross Frontier Policy
‘Top Ten’ Things Auditors Should Know About 9104/1
ACCREDITATION PROCESS
Tim Lee The Boeing Company Chair IAQG OPMT October 22, 2010
The Road to ISO Certification Quality Auditing Services Ltd Tel: +44 (0)
IMPLEMENTING THE CHANGES WHAT’S IN IT FOR ACCREDITATION BODIES
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

Federal Organizational-Level EMS Workgroup Overview and Status James Wozniak (DLA) Steve Woodbury (DOE) Federal Environmental Symposium East & West June 3 & 17, 2008

Overview New language in E.O Typology of EMSs (What distinct types of EMS exist?) Questions and Answers Auditing

New Language in EO EO previously required ' “at all appropriate facilities” – The Interagency Workgroup clarified this definition to include “organizations” EO requires ' “at all appropriate organizational levels”

Confusion of Terminology Workgroup members used many different terms We used different terms for the same thing We used the same term for different things Facility EMS Site EMS Enterprise EMS Corporate EMS Agency-Wide EMS Office EMS Multi-Site EMS Program EMS Umbrella EMS Headquarters EMS

The EMS Typology FacilityMulti-Site Organization Higher-Tier

Facility EMS Other terms used: appropriate facility site EMS single-site organization EMS office EMS EMS

Multi-Site Organization EMS Other terms used: enterprise EMS corporate EMS agency-wide EMS multi-site EMS program EMS EMS

Higher-Tier EMS HIGHER-TIER EMS EMS Other terms used: umbrella EMS corporate EMS agency-wide EMS headquarters EMS program EMS

Questions and Answers Document The Workgroup is developing a Q&A document Draft questions have been circulated for review Will include examples of how different Federal agencies have structured their EMSs will be included

Auditing a Multi-Site Organization EMS The International Accreditation Forum provides requirements and guidelines for auditor-certification organizations. IAF has issued requirements for the certification of multiple sites based on sampling [IAF MD 1:2007]. The document defines (among other things) ‘multi-site organization’ when a multi-site organization is eligible for sampling sampling methodology and sample sizes

Summary of Workgroup Activities Developed a typology of EMSs – will include examples from Federal agencies Developing a Q & A document Reviewing implications of multi-site EMSs for EMS audits

For Further Information Contact: James Wozniak Defense Logistics Agency Steven Woodbury Department of Energy Federal Organizational-Level EMS Workgroup

BACKUP SLIDES

Certification of Multiple Sites Based on Sampling Mandatory Document issued by the International Accreditation Foundation Establishes requirements for certifying audit organizations Provides a useful benchmark

Multi-Site Organization Multi-site organization – an organization having an identified central function (hereafter referred to as a central office – but not necessarily the headquarters of the organization) at which certain activities are planned, controlled or managed and a network of local offices of branches (sites) at which such activities are fully or partially carried out. – IAF MD1:2007 Multiple Site Sampling, § 1.5

Eligibility for Sampling “Normally … audits … should take place at every site of the organization that is to be covered by the certification” However, sampling may be used “where an organization’s activity subject to certification is carried out in a similar manner at different sites, all under the organization’s authority and control” – IAF MD1:2007, § 0.2

Eligibility for Sampling (cont.) Processes at all the sites must be substantially of the same kind, and have to be operated to similar methods and procedures [§3.0.1] Where processes in each location are not similar (but are clearly linked) the sampling plan shall include at least one example of each process [§3.0.1] Management system shall be under a centrally controlled and administered plan and be subject to central management review [§3.0.3] Not all organizations meeting definition of “multi-site organization” are eligible for sampling [§3.0.6]

Factors Which may Restrict Use of Sampling Risk or complexity of activities Size of sites Variations in local implementation of the management system – [§3.0.8]

Partly selective, to include a representative range of sites [§5.1.1] At least 25% selected at random [§5.1.2] Selection may include considerations such as [§5.1.4] Results of previous internal audits and management reviews Records of complaints and other relevant aspects of corrective and preventive action Variations in the size of sites Variations in work procedures Complexity of the management system and processes conducted at the sites Environmental issues and extent of aspects and associated impacts Differences in regulatory requirements Geographical dispersion Selection of Sample

Minimum Size of Sample For low-to medium risk activity, with <50 employees at each of n sites [§5.2.3] Initial audit: square root of the number of remote sites s = √ n (rounded up) Surveillance audit: s = 0.6 √ n (rounded up) Re-certification audit: same as initial audit (where management system has proved effective, may be reduced to s = 0.8 √ n (rounded up) Central office shall be audited during each audit, and annually as part of surveillance [§5.2.5]

Size or frequency of sample shall be increased if risk analysis indicates special circumstances in respect of factors such as: Size of site and number of employees (e.g. > 50 employees at a site) Complexity or risk level of the activity and the management system Variations in working practices Significance and extent of aspects and associated impacts Records of complaints and other relevant aspects of corrective and preventive action Results of internal audits and management review – [§ 5.2.6] When to Use a Larger Sample

1 head office 4 national offices 27 regional office 1700 local branches visited at each audit cycle s = 2; minimum 1 at random s = 6; minimum 2 at random s = 42; minimum 11 at random – [§ 5.2.7] When the organization has a hierarchical system of branches (e.g. head (central) office, national offices, regional offices, local branches) the sampling model defined above applies to each level Example: Sampling A Hierarchical Organization