Mordecai Lincoln Dam & Hunters Pond, Scituate, MA

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Tour of Five Small Flood Control Dams in Iowa and Nebraska Rehabilitation Needs of Aging Small Flood Control Dams.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Sovereign Waters Lake Management Plan Outcomes and Recommendations 9 May 2013.
Drainage Rights Dr. Matt Helmers Assistant Professor and Extension Agricultural Engineer Department of Agricultural and Biosystems Engineering Iowa State.
1 Floodplain Management SESSION 7 Stream Systems on Dynamic Earth Floodplain Management Principles & Practice Prepared By Donald R. Reichmuth, PhD.
Pond and Wetland BMPs, Retrofitting Detention Basins.
May 14, 2014 RAMSHORN POND DAM REHABILITATION PUBLIC INFORMATION SESSION PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer.
The North Carolina Dam Safety Program. Our Responsibilities Administration and enforcement of the Dam Safety Law of 1967 and the supplementary Administrative.
2 Lakeside Drive, Pawling NY 12564
Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Hydrologic Studies Unit Land and Water Management.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
2010 Agricultural Water Resource Development Workshop Series HOW TO APPLY FOR ASSISTANCE “PRELIMINARY SITE ASSESSMENT – THE PROCESS”
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Watershed Structure Operation & Maintenance (O&M) Responsibilities Diane A. Guthrie, P.E. August, 2015.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
River and Canal Maintenance Activities Allowed Under RIDEM Wetlands and Water Quality Regulations Russ Chateauneuf Chief Groundwater & Wetlands Protection.
Heath Delzell – Engineering Bureau IDNR Engineering Progress to Date and Timeline for Project Completion Design and Construction Obstacles.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
SAGHA Annual Homeowners Meeting August 28, Agenda  Collect ballots  Treasurer’s Report  Common Area Maintenance Presentation  Election Results.
00/2015 Public Information Centre Addendum to the Environmental Study Report: Millbrook Dam Tuesday, October 20, 2015.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Estimating the Volume of Fine-Grained Sediments Behind Four Low-Head Dams, Kalamazoo River, Michigan. In cooperation with the Michigan Department of Environmental.
Brazoria County RESTORE Act Projects
Tempe Town Lake Downstream Dam Replacement NEW DAM ALTERNATIVES SELECTION January 5, 2012.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
Upper White Pine Floodplain Reconnection Presentation to PRCC Nov. 13, 2014.
Arlington Park Arlington Park is an improperly maintained and operated sewage treatment lagoon. There are approximately 30+ families using this lagoon.
Ruttinger & Sons Engineering Designed by: Taylor Kasperick Jacob Wilson Loren Ruttinger Presented by: Loren Ruttinger.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Yampa River Structures Project WSRA grant application 2nd reading June 15, 2011 Prepared by Friends of the Yampa.
Tailings Dam Stability
Stormwater Management
Town of Brighton, Department of Public Works
Bridges Reach analysis Fundamental tool for design
WEE WAH LAKE DAM AND POND No. 3 DAM REHABILITATION PROJECT
Swamp Creek: Culvert Replacements
Fluvial Criteria in the FAHP
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017.
Tennessee Safe Dams Program
Babcock Basin-Design Phase
Measure A Financial Oversight Committee August 7, 2013
GIVEN GEOMORPHIC REGIME AND IMPACTS, WHAT IS REQUIRED?
Estler Lake Dam Rehabilitation
Stream Crossing Replacement Policy
Presentation transcript:

Mordecai Lincoln Dam & Hunters Pond, Scituate, MA Bound Brook Dam is owned by the Ladd family, according to ODS. The Town owns the road. Goals of the project are to eliminate the liability of owning a dam, allow for fish passage and other natural riverine functions, and to dovetail with historical preservation and recreation interests. The Town’s partners include: CZM, NOAA, Mass Bays Program, and DER

Hunter’s Pond Infilling 1690: First dam built on site 1969: Dam breached 1984-85: Current dam constructed 2013: Impoundment nearly full of sediment One thing that many folks in town have likely noticed is that the Hunters Pond impoundmetn has changed a lot over time. Mainyl, that’s due to the accumulation of sediment that the Brook wouodl normally flush out to the bay. This is a natual process that dams disrupt. When a dam slows the flow of a river, the larger particles drop out first, and the finer particles get carried closer to the dam. Over time, the sediment vegetates. Coarse Grained Sediment Deposit Fine Grained Vegetation Dam FLOW PROFILE Vegetation Submerged Vegetation Dam Coarse Grained Sediment Deposit Fine Grained Sediment Deposit FLOW PROFILE

Hunter’s Pond Impoundment 7-20-2010 12-05-2012 02-15-2010 06-19-2013

2013 GZA Dam Inspection & Repair Summary Dam Hazard Classification: SIGNIFICANT (class II) Dam Condition: POOR GZA’s opinion of probable cost, for all recommended work: $450,000 - $750,000. Spillway Dam & Bridge Bridge Culvert Aux. Weir - Culvert

Dam Removal Feasibility – Scope of Work 2013 Princeton Hydro Dam Removal Feasibility – Scope of Work Preliminary Evaluation of Ex. Information & Site Conditions Delineation of Regulated Resources Survey and Mapping Preliminary Hydrology & Hydraulics (with gage) Sediment Mapping, Characteristics, Analysis Historic Review Public Meetings Preliminary Design Plans for Dam Removal

Figure: Sediment Sample Locations Results Relatively small mobile sediment quantity and general lack of contamination. Mordecai Lincoln Road begins overtopping in flows in excess of the 100-year event Dam removal has little effect on upstream water levels during the 100- and 500-year storm events, with the maximum effects (decrease in water level) during the lowest flows Flow must be maintained through both outlets so as not to increase water levels during the 100-ye regulatory event. It is recommended that flow not be increased through the auxiliary outlet during storm events Dam removal will not change normal tidal influence on the former impoundment, which currently extends to base of both outlets Figure: Sediment Sample Locations

Dam Removal & Restore Channel/Floodplain Proposed Restoration Actions: for Removal: Full demolition and removal of dam’s spillway, concrete apron, & fishway Slip-lining culvert under Mill building & reconfiguration of the upstream inlet Re-creation of approximately 700 linear feet of bifurcated channel to follow the legacy flow paths ; Stabilization & conversion of impoundment to ~2 ac of naturalized vegetated floodplain. PH’s opinion of probable cost = $263,000

Cost Comparison Summary Dam Repair Construction Estimate $450,000 - $750,000 (with permitting & engineering, without construction oversight) Preliminary Dam Repair Construction Estimate $263,000 Possible Additional Costs: Additional pipe under building ???? Replacement of the bridge ???? Sediment management $50,000 - $100,000 Construction Oversight by Engineer $25,000 - $35,000

Additional Benefits of Dam Removal Eliminates a large part of O&M (dam, road, culvert, etc.) Exceptional benefit to river herring and other fish & wildlife Avenue for historical preservation Jives with bike path and other recreational goals NUMEROUS opportunities for funding assistance compared to other options. Source: Bukaty Source: Bukaty Source: Southerland

Next Steps Town approval to support project (2013) Apply for NFWF grant opportunity (January 2014) Determine project role of Moredecai Lincoln barn (2014) Engage consultant for engineering design & permitting (2014-2015) Engage next level review of historical resources (2014) Dam Removal bid solicitation (2015) Dam Removal (2015) Ecological Monitoring (2015…)

EXTRAS THIS is where we talk about the current NFWF/ USFWS funding opportunity.

Example of Dam Removal - Rakes Pond Dam Removal, PA 2012 – Post Dam Removal 2011 – Rakes Pond

Example of Dam Removal - Millport Dam Removal, PA 1998 – Impoundment drawdown 1998 – Millport Dam Impoundment 1999 – Impoundment 1 growing season later 2008 – Impoundment 10 yrs later

2013 GZA Dam Inspection & Repair Summary Dam Hazard Classification: SIGNIFICANT (class II) Dam Condition: POOR Proposed Remedial Actions for Repair: Clear trees and woody vegetation from embankment and backfill with compacted sand and gravel. Repair and re-grade upstream slope and install riprap slope protection. Install a graded filter blanket to control seepage at downstream toe of dam. Repair and re-grade downstream slope using dumped riprap or rockfill. Rehabilitate outlet works (repair or replace conduit and slide gate). Repair concrete defects at spillway.   GZA’s opinion of probable cost, for all recommended and potential work, was estimated to be $450,000 - $750,000.

Mordecai Lincoln Dam & Hunters Pond Bound Brook

Example of a Mill Pond Infilling - Heminway Pond Transition From 1970 to 2011 Watertown, CT 1972 1990 2005 2004 2006 2008 2011

Infilling of a Man-made Impoundment Dam Construction Wetland formation years before present 100 80 60 40 20 Source: TNC Even after the dam had been build, usually an open-water condition existed. Only after many years did the pond begin to fill with sediments and wetland begin to form First as floating leaved vegetation, then as emergent wetlands as area of open water decreases, then as floodplain habitat as sediments accumulate above the normal water level. Usually, wetlands associated with dams are relatively young, are still in a transitional phase of development. open water emergent vegetation floating-leaf vegetation floodplain vegetation

Hunter’s Pond Impoundment IMPOUNDED SEDIMENT DELTA 4/17/2008 Pre growing season aerial of pond with impounded sediment delta submerged 6/18/2010 summer aerial of impoundment with vegetated impounded sediment delta

Community Concerns Expressed at 1ST Neighborhood Discussion Existing Wildlife Dam Alternatives & Funding Aesthetics (i.e. mudflats) Dam Safety Road & Bridge Safety Flooding Sediment Infilling and Dredging