Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011.

Slides:



Advertisements
Similar presentations
GOALS FOR TODAY Understand how to write a HACCP Plan
Advertisements

Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
Radiopharmaceutical Production
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
BoRit Superfund Site Timeline
EQUIPMENT VALIDATION.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Diesel Generator Reliability: Lessons Learned from Storms
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Supplementary Training Modules on Good Manufacturing Practice
Developing a Chemical Risk Management Program
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Quality Assurance/Quality Control Policy
The purpose of SOP is to describe the Performance of a controlled process and if it is written to fulfill only that purpose efficiently and effectively,
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Module 11: Use and Care of Equipment At the HIV Rapid Testing Site.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
WORKPLACE HAZARD MANAGEMENT PLATFORM UPGRADE KEY ELEMENTS IDENTIFY PLAN AND DOCUMENT COMMUNICATEMANAGEMONITOR.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
ISO OPERATIONAL CONTROL
Procedure Writing Basics Mr. Richard Crisler Spring-2006.
Equipment Management Audience – Local lab responsibilities.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Small Drinking Water Systems Program Overview Ministry of Health and Long-Term Care Public Health Protection and Prevention Branch Environmental Health.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
NC AWWA-WEA 95th Annual Conference
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
World Health Organization
NSTM 074 VOL 3 (SERIES) FAMILIARIZATION
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
Van Wert, OH Water and Wastewater Element Training
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Regulatory Oversight of HOF in Finland
Research and Test Reactor Decommissioning Inspections
PREVENTIVE MAINTENANCE
Installation Binder / IRR – an example
Radiopharmaceutical Production
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011

 EPA 540-F Operation and Maintenance in the Superfund Program; Highlight 5 – Typical O&M Manual Sections, 2001  BP Engineering Integrity Manual; Section 22 – Operation and Maintenance Manual Requirements, 2009  Building Design Guide; Comprehensive Facility Operation and Maintenance Manual  Written sections of the O&M manual provide system background and operational justification for operating parameters, and allow for an operating range while maintaining safe operating limits of the system.

 Volume I - System Overview  Volume II - Metro Storm Drain Pumping Station  Volume III - West Camp Pumping Station  Volume IV - BTL-LAO Treatment System  Volume V - Maintenance Plan

 Volume I System Overview  The Draft Operation, Maintenance and Monitoring (O&M) Plan for Butte Priority Soils Operable Unit consists of multiple volumes (I through V). Each volume is used to describe specific aspects of the Operations and Monitoring (O&M) Plan. Volume I, presents project background information, an overview of the operating systems and associated components, and waste characterization.

 Items provided in Volume I required by EPA Highlight 5 include the following: Remedy description Staffing and Personnel Requirements *Permits Records *(as written in the Final Consent Decree)

 BP’s Site Remediation Technologies Engineering Integrity Manual, Section 22 provides requirements for Operation and Maintenance Manual preparation  The following provides clarification regarding where these items are found

BP Engineering Integrity ManualBTL-LAO O&M I.Cover SheetVolumes I – V II.Table of ContentsVolumes I – V III.PurposeVolume I IV. Equipment DescriptionVolumes I – IV V.Instrumentation and Protective System DevicesVolumes I – V VI.Safe Operating LimitsVolumes I – IV VII.System Operating DetailsVolumes II – IV VIII.SamplingVolumes I – IV IX.Equipment Lubrication and MaintenanceVolume V X.Waste Handling and DisposalVolumes II – V XI.DrawingsVolumes I – IV

BP Engineering Integrity ManualBTL-LAO O&M XII.Equipment ManualsVolume V XIII.Copy of PermitsVolumes I – IV XIV.FormsVolumes II– V XV.Field Data SheetVolumes II – IV; Daily Ops Report XVI.Maintenance Schedule & ChecklistVolume V XVII.Maintenance LogVolume V XVIII.PSD ChecklistVolumes II– IV

 1.0 INTRODUCTION  1.1Purpose and Scope  1.2Remedy Description  1.3System Background  1.4Waste Characterization  1.5Treatment System  1.6Treatment Method  1.7Design Theory  1.8Owner and Contact Information  1.9Site Access  1.10Operation and Maintenance Manual Contents  Volume I System Overview  Volume II Metro Storm Drain  Volume III West Camp/Missoula Gulch  Volume IV Butte Treatment Lagoons and Lower Area One  Volume V Maintenance  2.0SYSTEM OVERVIEW  2.1Influent Characterization  2.2Remedial Action Treatment Objectives  2.3Safe Operating Limits  2.4Protective Safety Devices (PSDs)  2.5Description of Facilities/Systems  2.6Description of Remote Facilities/Influent Systems  3.0PERFORMANCE STANDARDS  3.1Groundwater  3.2Surface Water  3.3Operational Sampling and Monitoring  3.4Sampling by Others  4.0OPERATION, MONITORING, AND MAINTENANCE PLAN PURPOSE AND USE  5.0HEALTH AND SAFETY PLAN  6.0MANAGEMENT PLAN  6.1Staffing and Personnel  6.2Training  6.2.1Start-up, Shutdown, Upset, and Normal Operation  6.3Records and Reporting  6.4Transfer of Ownership, Operation and Management  7.0FUTURE REVISIONS AND UPDATES TO O&M PLAN

 Volumes II – IV are structured with a consistent Table of Contents format  Volumes II – IV provide operating and daily maintenance tasks associated with a specific system  Specific checklists, SOPs, drawings, etc. are contained within each specific volume

 1.0INTRODUCTION  1.1Purpose and Scope  1.2Project Background  1.3Design Theory  1.0INTRODUCTION  1.1Purpose and Scope  1.2Project Background  1.3Design Theory  1.4BTL-LAO Owner and Contact Information  1.5Organization and Use of this Volume of the O&M Manual  2.0SYSTEM OVERVIEW  2.1General Facility  2.2Electrical, Instrumentation and Controls  2.3Wet Vault Installation  2.4System Monitoring  2.5Electrical Systems  2.6Backup Systems and Spare Parts  3.0SYSTEM CONTROLS  3.1Hydraulic Control  3.2Electrical, Automation Control, and Monitoring  3.3Instrumentation and Controls – Operational Control Theory  4.0SAFE OPERATING LIMITS  4.1Pressure  4.2Temperature  4.3Electrical  4.4Protective Safety Devices (PSDs)  5.0ROUTINE OPERATION AND MAINTENANCE TASKS  5.1Routine Operation  5.2Site Vegetation and Access Maintenance  6.0OPERATION DURING DISTURBANCES  6.1System Disturbances  6.2Instrumentation and Control Disturbance  6.3Environmental Disturbances  7.0MONITORING AND LABORATORY TESTING  7.1Operator Observations  7.2System Generated Data  7.3Automatic Electronic Monitoring Data  7.4Field Measurement and Sample Collection  7.5Routine Inspection and Calibration of On- Site Monitoring Systems  7.6Review of Monitoring Data for Operations  7.7Routine Sampling Tasks

 4.0SAFE OPERATING LIMITS  4.1Pressure  4.2Temperature  4.3Electrical  4.4Protective Safety Devices (PSDs)  5.0ROUTINE OPERATION AND MAINTENANCE TASKS  5.1Routine Operation  5.2Site Vegetation and Access Maintenance  6.0OPERATION DURING DISTURBANCES  6.1System Disturbances  6.2Instrumentation and Control Disturbance  6.3Environmental Disturbances  7.0MONITORING AND LABORATORY TESTING  7.1Operator Observations  7.2System Generated Data  7.3Automatic Electronic Monitoring Data  7.4Field Measurement and Sample Collection  7.5Routine Inspection and Calibration of On- Site Monitoring Systems  7.6Review of Monitoring Data for Operations  7.7Routine Sampling Tasks  8.0DATA MANAGEMENT  8.1Data Management Plan  8.2Automated Data Management  8.3Monitoring, Alarm, and Data Logging System  9.0OPERATIONS REPORTING AND RECORD KEEPING  9.1Daily Operations Report  9.2Weekly Operations Report  9.3Monthly Operations Report  9.4Quarterly Operations Report  9.5Annual Operations Report  9.6Supplementary Data  10.0ROUTINE INSPECTION AND MAINTENANCE GUIDELINES  10.1Inspection and Maintenance Guidelines for Process Equipment  11.0EMERGENCY PROCEDURES  11.1Alarm Response Notification  11.2Alarm Conditions  11.3Emergency Shutdown of Pump Station  12.0REFERENCES

 Volume V provides maintenance requirements beyond daily operational maintenance tasks  Work order system  Inspection schedules, maintenance logs, seasonal maintenance, etc.

1.0INTRODUCTION 1.1Purpose 1.2Scope 1.3Updates 2.0EQUIPMENT TRACKING 2.1Equipment List 2.1.1Equipment Numbering 2.1.2Equipment Data Sheets 2.2Maintenance Procedures 2.3Work Permits – HSSE Requirements 2.4Risk Assessments 2.5Training 2.5.1Re-certifications 2.6Work Order System 2.6.1Work Order 2.7Prioritizing Work Requests 2.8Labor Usage 2.9Spare Parts Inventory and Inventory Control 2.10Manufacturer’s Manuals Usage 2.11Schedule of Tasks Performed 3.0INSPECTION, DOCUMENTING AND REPORTING 4.0SYSTEM OVERVIEW INSPECTION 4.1Inspection Log 4.2Equipment Maintenance Logs 4.3Protective Safety Devices Maintenance 4.3.1PSD Testing and Maintenance Log 4.4Work Orders 4.5Incident Investigations 5.0PREVENTATIVE MAINTENANCE TASKS 5.1Inspections 5.2Cleaning 5.3Lubrication 6.0PREDICTIVE MAINTENANCE 7.0SEASONAL MAINTENANCE 8.0HSSE AND SPECIALIZED TOOLING REQUIREMENTS 9.0PROCESS DESCRIPTION 10.0MAINTENANCE REQUIREMENTS ( B Y SYSTEM) 10.1 CAS 10.2BTL 10.3LAO SITE 14.0REGULATORY REQUIREMENTS 15.0WASTE AND WASTE DISPOSAL 16.0MATERIAL SPECIFICATIONS 17.0INSTRUMENTATION 18.0LESSONS LEARNED 19.0UPGRADES and UPDATES

 Checklists  Tables  Forms  Schedules  Drawings

BTL-LAO Ops Report West Camp MSD LAO CAS Building *Protective System Devices * Denotes Integrity Management required items

 *PSD Safe Chart  Cause and Effect *Instrument Device Valves  Decision Trees Operating Maintenance  Registers *Device Register Equipment Register Interface Register  Line List * Denotes Integrity Management required items

 Equipment Data Sheet  Work Orders  *Inspection Logs  *Maintenance Logs  * Denotes Integrity Management required items

 *Quarterly Overview Inspections  *PSD Inspections  Valve Cycling  Lubrication  Cell Dredging/Waste Removal  * Denotes items required by BP Integrity Management

 *Site Plot Plan  Process Flow Diagram  Construction As-Built Drawings  Equipment Layout Well Details – West Camp Equipment Interface Details  *Piping and Instrumentation Diagrams (P&IDs)  Electrical One Line – upon completion of upgrades

Provide specific purchase information Document specific equipment details Should be completed for all equipment when purchased/installed Retired when equipment is removed/replaced

 Provide method for tracking maintenance  Ensure CoW practices are followed  Require dual verification of work completed

 Standard Operating Procedures (SOPs) Currently 43 SOPs written Standard format  Scope, HSSE, PPE, MSDS, Reference Drawings, Work Instructions  Manufacturer’s Specific O&M Manuals Included in specific Volume Appendices Referenced for minimum maintenance requirements

 System Upgrades  Transition from Manual to Program  Maintenance Schedules Procedures Detailed equipment files  Operations Additional SOPs Updated SOPs  IM Compliance Monthly compliance focus  Line Lists  Coordinate Contingency Operation Plans Construction Completion Reports