Chapter 10 Design Examples

Slides:



Advertisements
Similar presentations
SMP Sizing in Redevelopment Projects Scenarios are countless Tools –Simple method –CN back calculation –Peak Discharge Rate Chapter 10 Criteria List of.
Advertisements

SUNY ESF Workshop Shohreh Karimipour, P.E. Enhanced Phosphorus Removal Standards NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
Design of Vegetative Filtering Systems-Open Channels and Filter Strips Prepared by the Center for Watershed Protection.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
CHARACTERISTICS OF RUNOFF
Runoff Processes Daene C. McKinney
Soil Conservation Service Runoff Equation
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Low Impact Development Best Management Practices
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Stormwater Management
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Better Site Design Sustainability & Stormwater
Reading: Applied Hydrology, Sec 15-1 to 15-5
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
Estimating Qmax Using the Rational Method
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
Design of Stormwater Filtering Systems Center for Watershed Protection
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Design of Infiltration Practices
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Vegetated Filters Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
The Green Corridor Project
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
STORMWATER MANAGEMENT
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
Storm Water Runoff Storm Water Runoff
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Sanitary Engineering Lecture 4
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Modeling Low Impact Development Techniques and Detention Basins in SWMM CEE 6/5460 David Rosenberg.
CE 3372 Water Systems Design
Components of Stormwater Management Systems
Storm Water Storage and Treatment
Storm Water Runoff Storm Water Runoff
Preciptation.
Kickoff example Create a new file
MIDS Calculator Use - Intermediate
Presentation transcript:

Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development (Water Quality and Channel Protection calculations only)

Pond Design in a residential development Example 1: Pond Design in a residential development

Example 1

Example 1 Stone Hills Estate is a 45-acre residential development with 20 acres of off-site drainage, which is currently in a meadow condition.

Example 1A Hydrology Sizing Method Example: Step 1. Establish Hydrologic Input Parameters and Develop Site Hydrology Using the Type III Rainfall Map and the inputs in Table 10.5.1, the results of the hydrologic analysis were computed and are shown in Table 10.5.2.

Example 1A (cont.) Step 2. Compute Water Quality Volume, (WQv) WQv = Estimated runoff volume (acre-feet) resulting from the 1-year, 24 hour design storm over the post development watershed (includes contributing on-site and off-site drainage from impervious and pervious areas alike) The results of the hydrologic calculations show that the 1-year, 24-hour event results in 0.99 inches of runoff over the total contributing site area. Therefore, the WQv can be calculated as follows: = (Total Drainage Area) (V1-yr) = (65.1 ac) (0.99 in) (1 ft/12 in) = 5.37 ac-ft

Example 1A (cont.) Step 2. Compute Water Quality Volume, (WQv) (cont.) In final stabilization of the site, soil-decomposition practices are applied to all disturbed areas. Because of soil restoration practice, hydrologic soil group curve numbers applied to the grass areas are kept as those of pre-construction condition.

Example 1A (cont.) Step 3. Evaluate Source Control and Compute Flow Reduction The conventional design WQv of 5.37 ac-ft results from a site design that includes 45 acres of disturbed area. A detention pond would need to be designed to treat the WQv on-site. The area required for this practice has a footprint of around 0.7 acres from treatment of runoff from 108 houses and roads. To reduce the flow by source control, two Better Site Design (BSD) features are selected to be incorporated in the site plan: 1) vegetated buffers and 2) raingardens.

Example 1A (cont.) Step 3. Evaluate Source Control and Compute Flow Reduction (cont.) Vegetated Buffers: Preserve 4 acres of undisturbed natural area as forested area rather than converting the areas to lawn area Applied to C and D soil types to reduce the CN from 78 to 77 Raingardens (RGs): RGs designed to collect runoff from a section of the rooftop on half of the lots (56 rooftops) as well as runoff from driveways and lawns. Routing flow through the RGs results in reduction of WQv based upon the storage size of the RG A RGs maximum allowable contributing impervious area is 1000 ft2, designed to store and filter stormwater within the planting media and to exfiltrate a fraction of the 1-yr storm to the ground This practice was applied to lots with C soils An average of 270 ft2 surface area was used for the RG which were located within 30 ft of downspouts. A bypass also routes excess flow to the pond when RG capacity is exceeded

Example 1A (cont.) Step 3. Evaluate Source Control and Compute Flow Reduction (cont.) Storage capacity of the RGs is calculated based on the following parameters in Table 10.5.5.

Question 1 How much larger would RGs need to be to achieve 10% reduction? 25%? 450 90 90 405 22,680 Answer 10%, 0.52 ac/ft - 21’x21’ – 25%, 1.3 ac/ft, 33’x33’

Question 2 What other approaches could have reduced runoff volumes at the planning level? Name three.

Example 1A (cont.) Step 3. Evaluate Source Control and Compute Flow Reduction (cont.) Therefore, adding 56 RGs controls runoff from approximately 1.3 acres of rooftop and 1.3 acres of lawns, which results in control and reduction of: = 13,608 ft3 = 0.31 ac-ft of WQv OR 6% reduction in WQv Note: 0.31 ac-ft infiltrates into the native soil and does not reach the height of the rectangular weir outlet structure (1.5 ft) designed to safely drain the overflow from the RG into the conveyance system.

Example 1A (cont.) Step 4. Compute Stream Channel Protection Volume, (Cpv) The channel protection volume (Cpv) requirement is achieved by detaining the 1-year, 24-hour storm to achieve a center of mass detention time (CMDT) of at least 24 hours. This can be achieved by adjusting the outlet structure of the pond. In some cases, this will require reducing the extended detention orifice size and adjusting the overflow weir design. By modifying the pond volume and the elevation and size of the outlet structure(s), in a trial and error fashion, the Cpv requirement can be met.

Example 1A (cont.) Step 4. Compute Stream Channel Protection Volume, (Cpv) (cont.) Wet ponds are not designed for detaining flow; therefore, the difference between the inflow and outflow hydrographs is insignificant when sized purely for water quality control. The Cpv requirement may be provided above the WQv in a wet pond or a stormwater wetland. Therefore, once a pond has been sized to meet the WQv requirement, a TR-55 and TR-20 (or approved equivalent) model may be used to determine CMDT.

Wet Extended Detention Pond Wet Pond Outlet riser Overbank Protection volume (Qp-10) Overbank Protection outlet Channel Protection volume (Cpv) Extended Detention Channel Protection outlet Extended Detention outlet Water quality volume (WQv) Permanent Pool Outlet barrel Wet Extended Detention Pond WQv divided btw. Permanent Pool and Extended Detention volume Wet Pond WQv = 100% Permanent Pool No Extended Detention outlet 19

Example 1A (cont.) Step 4. Compute Stream Channel Protection Volume, (Cpv) (cont.) Alternatively, the methodologies in Appendix B of the Design Manual can be followed to ensure the Cpv requirement is met. An example of this methodology is shown in Section 8.1 of Chapter 8. Additionally, it may be necessary to install detention ponds or underground vaults onsite to meet the Cpv requirement of 24-hour extended detention if pond sizes become too large. Note that although these practices meet water quantity goals, they are unacceptable for water quality control because of poor pollutant removal and need to be installed subsequent to a water quality practice (Section 10.2 of the Design Manual) to ensure enhanced phosphorus removal.

Example 1A (cont.) Step 5. Additional Sizing Requirements Standard procedures for computing the Overbank Flood Protection Volume (Qp10), the Extreme Flood Protection Volume (Qf), and the Safe Passage of 100-Year Design Storm (Qf) remain the same. Procedures are outlined in Chapter 8 of the Design Manual.

Example 1B Pond Design Example: Calculations for both a Wet Pond and an Extended Detention Wet Pond are provided. Step 1. Compute Preliminary Runoff Control Volumes The WQv requirements were developed in Part A of this example

Example 1B Step 2. Determine whether the development site and conditions are appropriate for the use of a stormwater pond There are no additional requirements for this site. Procedures are identical to those presented in Chapter 8 of the Design Manual. Size wet forebay to treat 10% of the WQv = (10%) (5.1 ac-ft) = 0.51 ac-ft Note: Forebay volume is included in the WQv as part of the permanent pool volume Step 3. Confirm local design criteria and applicability Step 4. Determine pre-treatment volume

Example 1B Step 5. Determine permanent pool volume and extended detention (ED) volume Size the permanent pool volume to contain 50% of the WQv: = (0.5) (5.10 ac-ft) = 2.55 ac-ft (includes 0.51 ac-ft forebay volume) Size the ED volume to contain 50% of the WQv: = (0.5) (5.10 ac-ft) = 2.55 ac-ft

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable) This step involves initially grading the pond (establishing contours) and determining the elevation-storage relationship for the pond. Storage must be provided for the permanent pool (including sediment forebay), extended detention (WQv-ED) and the Cpv-ED. Calculations for the 10-year, and 100-year storms, plus sufficient additional storage to pass the ultimate condition 100-year storm with required freeboard can be found in Chapter 8 of the Design Manual. An elevation-storage table and curve was prepared using the average area method for computing volumes.

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable)

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable) (cont.) Set basic elevations for pond structures: Set the pond bottom at elevation 621.0 Provide gravity flow to allow for pond drain set riser invert at 620.5 Set barrel outlet elevation at 620.0 Set water surface and other elevations Required permanent pool volume = 50% of WQv = 2.55 ac-ft. From the elevation-storage table, read elevation 625.2 (2.83 ac-ft > 2.55 ac-ft) site can accommodate it and it allows a small safety factor for fine sediment accumulation - OK

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable) (cont.) Set permanent pool WSEL = 625.2 Forebay volume provided in single pool with volume = 0.51 ac-ft – OK Add 1 ft to the depth of the forebay to account for sacrificial storage for sediment deposition. The pond pretreatment bottom is set at elevation 620.0 Required extended detention volume (WQv-ED) = 2.55 ac-ft. From the elevation-storage table (volume above permanent pool), read elevation 627.5 (2.78 ac-ft > 2.55 ac-ft) OK. Set ED wsel = 627.5 Check the pond surface area to drainage area ratio: NOTE: Total storage at elevation 627.5 = 5.61 ac-ft (greater than required WQv of 5.1 ac-ft)

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable) (cont.) Compute the required WQv-ED orifice diameter to release 2.55 ac-ft during 24 hours (for Wet ED Pond Only) Avg. ED release rate = (2.55 ac-ft)(43,560 ft2/ac)/(24 hr)(3600 sec/hr) = 1.29 cfs Invert of orifice set at wsel = 625.2 Average head = (627.5 - 625.2)/ 2 = 1.15' Use orifice equation to compute cross-sectional area and diameter Q = CA(2gh)0.5, for Q=1.29 cfs h = 1.15 ft; C = 0.6 = discharge coefficient Solve for A A = 1.29 cfs / [(0.6)((2)32.2 ft/s2)(1.15 ft))0.5] A = 0.25 ft2, A =πd2 / 4; dia. = 0.57 ft = 6.76 inches Use 8" pipe with a gate valve to achieve equivalent diameter.

Example 1B Step 6. Determine pond location and preliminary geometry. Conduct pond grading and determine storage available for WQv permanent pool and WQv-ED (if applicable) (cont.) Compute the stage-discharge equation for the 6.9” dia. WQv-ED orifice. QWQv-ED = CA(2gh)0.5 = (0.6) (0.2 ft2) [((2)(32.2 ft/s2))0.5] (h0.5) QWQv-ED = (1.25) h0.5, where: h = wsel - 625.65 Note: Account for one half of orifice diameter when calculating head.) NOTE: In Wet Pond design, there is no WQv-ED orifice. All of the 1-year, 24-hour volume is retained.

Example 1B

Example 1B Step 7. Set the Cpv pool elevation. Compute Cpv-ED orifice size, compute release rate for Cpv control and establish elevation. CPv Sizing for Wet Ponds: To determine the required Cpv, a TR-55 model was developed to demonstrate increasing the elevation of the pond and the sizing of a Cpv outlet to achieve a center of mass detention time (CMDT) of at least 24 hours (24-hour extended detention of the 1-year, 24-hour storm event). Based on the TR-55 output data: Required Cpv storage to meet 24-hour CMDT = 3.09 ac-ft Diameter of Cpv-ED orifice = 4.4 inches at an elevation of 627.5 (determined from TR-55 model) Overflow Weir = 100’ wide earth spillway at 628.75 (not shown on the schematics) Required CMDT = 25.2 hrs

Example 1B Step 7. Set the Cpv pool elevation. Compute Cpv-ED orifice size, compute release rate for Cpv control and establish elevation (cont.) CPv Sizing for Wet Extended Detention Pond: The WQv for enhanced phosphorus removal is sized for the 1-year event and the WQv-ED orifice is sized to release the EDv within 24 hours. According to Step 6 the orifice diameter calculated to release the 2.55 ac-ft WQv within 24 hours (resulting in a release rate = 1.29 cfs). Therefore, the Cpv requirements are essentially included in the design. No additional volume is recommended. Based on the TR-55 output data, a CMDT of 23 hours was achieved in this design. Additional detention may be achieved by either increasing pond volume or an additional practice or control at the outlet of the pond to meet the Cpv requirement (not included in example).

Example 1B See Chapter 8 of the Design Manual for example calculations for the remaining steps, which cover calculations for: Step 8: Calculate Qp10 (10-year storm) release rate and water surface elevations; Step 9: Calculate Qp100 (100-year storm) release rate and water surface elevation, size emergency spillway, calculate 100-year water surface elevation, and Step 10: Check for safe passage of Qp100 under ultimate build-out conditions and set top of embankment elevation.

Filter Design in a Commercial Development Example 2: Filter Design in a Commercial Development

Example 2

Example 2 Lake Center is a 4.5-acre hypothetical commercial site located in the New York City watershed (east of Hudson). A five-story office building and associated parking are proposed within the catchment. The catchment has 3.05 acres of impervious cover (i.e., the site is 68% impervious). The pre-developed site is a mixture of forest and meadow. On-site soils are predominantly HSG “B” soils.

Example 2 (cont.) This example will focus on meeting the water quantity requirements. Channel Protection Volume, (Cpv), Overbank Flood Protection Volume (Qp10), and the Extreme Flood Protection Volume (Qf) are not addressed in this example. Step 1. Develop Site Hydrologic Input Parameters and Calculate Water Quality Volume Water Quality Volume, WQv The design storm is the 1-year, 24-hour, Type III rainfall event. Based on rainfall map chose 2.8-inches as the 1-year rainfall event based on the site location. In final stabilization of the site, soil decompaction practices are applied to all disturbed area. Because of soil restoration practice, hydrologic soil group curve numbers applied to the grass areas are kept at their pre-construction value. Using TR-55 and the post-development watershed, the resulting peak runoff rate is = 5.4 cfs.

Example 2 (cont.) Step 1. Develop Site Hydrologic Input Parameters and Calculate Water Quality Volume (cont.) The following provides a summary of TR-55 hydrologic calculation for WQv and discharge rate:

Example 2 (cont.) Step 1. Develop Site Hydrologic Input Parameters and Calculate Water Quality Volume (cont.) Therefore: WQv = 0.54 ac-ft or 23,224ft3

Example 2 (cont.) Step 2. Evaluate the Development Site for Appropriate Source Control Practices and Application of Surface Sand Filter Grass swales and rain gardens are found to be suitable for this site. Infiltration capacity of the site (HSG B) allows infiltration and reduction of the runoff volume. The conventional plan identified 8 traffic islands which can be used for siting of a rain garden or bioretention area. A section of the conveyance system is also modified to collect the sheet flow and shallow concentrated flow into a grass swale. Grass swales allow some storage and infiltration. By incorporating these practices, the plan meets the source control requirement for routing 20% of impervious area through BSD practices.

Example 2 (cont.) Step 2. Evaluate the Development Site for Appropriate Source Control Practices and Application of Surface Sand Filter (cont.) (3.05 acres) (43,560) (0.2) = 26,572 ft2 About 0.6 acre of the site will be connected to a bioretention area with infiltration capacity (without underdrain pipe) and a grass swale. Bioretention area calculations are similar to Example 1. Swale capacity is calculated using standard open-channel hydraulic design calculations to maintain shallow depths and low velocities. For the design of filters, head limitations are evaluated. Existing ground elevation at the practice location is 222.0 feet, mean sea level. Soil boring observations reveal that the seasonally high water table is at 211.0 feet. Adjacent drainage channel invert is at 213.0 feet.

Example 2 (cont.) Step 3. Compute Source Control Flow Reduction The site is designed to route the runoff from 0.6 acre of the impervious area through a bioretention area, overflow to an open channel and eventually flow to the proposed filter system. An overflow is designed to convey the overflow from the bioretention cell from larger storms into the swale. Contributing areas consist of 0.6 acre of rooftop, and 1 acre of grass area. About 300 ft2 of bioretention area is considered for each 1000 ft2 of rooftop, which results in a total bioretention area of 6,500 ft2. The rest of the impervious and landscaped areas discharge to a grass swale, which also conveys the overflow from the bioretention area.

Example 2 (cont.) Summary of Bioretention Area Sizing Step 3. Compute Source Control Flow Reduction (cont.) Summary of Bioretention Area Sizing

Example 2 (cont.) Step 3. Compute Source Control Flow Reduction (cont.) A grass swale is designed to convey the runoff from this sub-catchment. The grading of the site is planned to be less than 4% slope so no check dams are required and the swale provides conveyance with some infiltration and filtering of runoff. Routing the flow through the grass swale increases the time of concentration. The final water quality volume for the filter can be found by subtracting the volume in the BSD components from the water quality volume in the traditional site design or: WQv = (23,224 ft3) – (7,150 ft3) = 16,074 ft3

Example 2 (cont.) Step 4. Compute Available Head and Peak Discharge (QWQ). Determine available head: The low point at the parking lot is 223.5. Subtract 2' to pass the Q10 discharge (221.5) and a half foot for the inflow channel to the facility (221.0). The low point at the channel invert, is 213.0. Set the outfall underdrain pipe 1.0’ above the drainage channel invert and add 0.5’ to this value for the drain slope (214.5). Add to this value 8" for the gravel blanket on top of the underdrains and 18" for the sand bed (216.67). The total available head is 221.0 - 216.67 or 4.33 feet. Therefore, the available average depth (hf) = 4.33' / 2 = 2.17 feet.

Example 2 (cont.) Step 4. Compute Available Head and Peak Discharge (QWQ) (cont). Compute Peak Water Quality Discharge: The peak rate of discharge for the water quality design storm is needed for the sizing of diversion structures. The discharge rate is derived from the hydrology calculation in table developed in Step 1. A similar calculation is performed to incorporate the flow reduction and increase time of concentration and peak reduction as a result of the BSD approach. The source control practices discussed above result in reduction of peak discharge by 12%. The flow splitter outlet structure is designed to convey the 1-year storm to the sedimentation chamber and filter and safely bypass the 10-year storm to the conveyance system.

Example 2 (cont.) Step 5. Sizing of Diversion Structure and Filtering System At this point, all the steps are similar to steps 4 through 9 of Chapter 8 of the Design Manual. The methodology for sizing of flow splitter outlet structure for diversion of the design storm (1-year), filter bed chamber volume within practice, filter bed overflow weir size and sedimentation chamber, all remain the same as defined in Chapter 8. The key equations include: Orifice equation for sizing of diversion structure low flow orifice: Q = CA(2gh)1/2 ; Weir equation for sizing of the 10-year storm by pass weir: Q = CLH3/2 Darcy's Law for sizing of the filter bed Af = WQv (df) / [k (hf + df) (tf)] The requirement for enhanced phosphorus removal for sand filters is similar to conventional sizing of the filtering systems. The entire treatment system (including pretreatment) shall be sized to temporarily hold at least 75% of the WQv prior to filtration.

Example 2 (cont.) Step 5. Sizing of Diversion Structure and Filtering System (cont). Summary of Filter Bed Design

Question 3 What effects do BSD volume reductions have on sizing of filters? What effects do BSD peak flow reductions have on sizing of filters?

Better Site Design (BSD) Example

Traditional vs. BSD

Traditional Design Residential Development – 5 House lots Total Area = 8.70 acres 15% Impervious Area (1.31 acres) Q1-year = 1.54 cfs (Rainfall = 2.8 in) Water Quality Volume (WQv) = 0.30ac-ft All 8.70 acres is disturbed, requiring treatment for entire area. This approach utilizes the following major features: Curb and Gutter; and Pond as ultimate outlet.

Lakeview Ave Traditional Design

Traditional Outflow Hydrograph

Better Site Design Residential Development – 5 House lots Total Area = 8.70 acres 8% Impervious Area (0.75 acres) Q1-year = 0.24 cfs (Rainfall = 2.8 in) Water Quality Volume (WQv) = 0.06 ac-ft Only 6.28 acres is disturbed, requiring treatment for 72% of development area. This BSD approach utilizes the following major features: Bioretention cell, located in the center of the cul-de-sac (shown); Water quality swales, bordering LaMarnia Way and the cul-de-sac (shown); Raingardens (shown); Open section roadway design; Reduced pavement width; and Disconnected rooftop drainage.

HydroCAD Model examples

Lakeview Ave BSD

BSD Outflow Hydrograph

Hydrograph Comparison

Raingarden Total Inflow = 0.72 cfs Inflow Volume = 2,178 ft3 Infiltrated Volume = 2,134 ft3 No outflow from the system 0.001 AF unaccounted for

Water Quality Swale Total Inflow = 0.53 cfs Inflow Volume = 2,135 ft3 Outflow Volume = 1,481 ft3 Volume Infiltrated = 566 ft3 0.002 AF unaccounted for

Bioretention Cell Total Inflow = 0.89 cfs Inflow Volume = 3,790 ft3 Outflow Volume = 261 ft3 Volume Infiltrated = 3,485 ft3 0.001 AF unaccounted for

Proposed BSD Measures BSD Practices Benefits 1. Open section roadway design Center-crowned roadways convey stormwater runoff to a grass-lined channel without curbs reducing generation of stormwater 2. Reduced roadway pavement width from 28 to 20 feet Reducing impervious roadways drastically reduces the amount of stormwater that is generated and requires treatment. 3. Water quality swales (dry) Conveys stormwater runoff to discharge points while also reducing sediment and nutrient loads through biological uptake and sediment deposition. Bioretention cell in Cul-de-Sac Stormwater volume reduction and pollutant load reduction. Eliminates need for detention basin, no standing water and eliminates possible vectors for mosquitoes. 5. Raingardens Depressional stormwater storage on private lots increases infiltration and increases time of concentration (stormwater release timing) Disconnected rooftop drainage Increases infiltration of stormwater 7. Construction guidelines Written construction guidelines to protect and save existing vegetation and minimize site compaction during construction maintains excellent site infiltration.

Better Site Design Stormwater Controls Treatment Train Approach Rain Garden Treatment Train Approach Raingarden Cell Flow Path Grass Swale This slide shows the “Treatment Train” approach used by LID. First the road is an open section with a reduced width. This reduces the amount of impervious area and resultant pollutant load, runoff volume, and peak runoff rate. The runoff flows across a grass filter strip to a series of bioretention cells that are connected by an open swale. This creates several opportunities to filter pollutants, encourage infiltration, and reduce runoff. In case of large storm events, there is a conventional pipe system that can safely convey large flows of runoff. Grass Filter Strip Raingarden Cell Storm Drain System 65

BSD Features Reduced Pavement Width Pavement width for LaMarnia Way and the cul-de-sac is reduced from 28 feet to 24 feet. Pavement is crowned to promote drainage to the adjacent swales

BSD Features Water Quality Swales 11.5 feet wide on the north and 7 feet wide on the south (excluding the swales bordering the cul-de-sac) at street grade. 1.5 feet deep with 1:1 side slopes. Swales surrounding the cul-de-sac are 6 feet wide at street grade, with the same depth and slopes. Discharge at the downstream end of each swale (adjacent to Lakeview Avenue) is regulated by a 3-inch outlet. Detention greater than 1 foot in depth spills over directly to the catch basin. Conveyance underneath driveways is via 12-inch reinforced concrete culverts.

BSD Features Bioretention Cell Diameter of 50 feet at street grade; the primary treatment area is 48 feet in diameter and 4 feet in depth of crushed gravel. Most of the surrounding sub-catchments drains to the treatment swales circling the cul-de-sac and then to the facility via a pair of 12-inch Class 5 (3000 lb/ft/ft) reinforced concrete pipes. Runoff from the surrounding pavement drains to the cell down grass-covered banks with 2:1 slope

BSD Design Features Raingardens Raingardens vary in surface area Length-to-width ratios of approximately 2:1 Each is roughly 1.5-2.0 feet below grade with gradual side slopes (e.g. 2:1).

Better Site Design (BSD) Example

Traditional vs. BSD

Traditional Design Residential Development – 5 House lots Total Area = 8.70 acres 15% Impervious Area (1.31 acres) Q1-year = 1.54 cfs (Rainfall = 2.8 in) Water Quality Volume (WQv) = 0.30ac-ft All 8.70 acres is disturbed, requiring treatment for entire area. This approach utilizes the following major features: Curb and Gutter; and Pond as ultimate outlet.

Lakeview Ave Traditional Design

HydroCAD Model Traditional Design One Subcatchment High CN Fast Time of Concentration

Traditional 1-yr Outflow Hydrograph

Better Site Design Residential Development – 5 House lots Total Area = 8.70 acres 8% Impervious Area (0.75 acres) Q1-year = 0.24 cfs (Rainfall = 2.8 in) Water Quality Volume (WQv) = 0.06 ac-ft Only 6.28 acres is disturbed, requiring treatment for 72% of development area. This BSD approach utilizes the following major features: Bioretention cell, located in the center of the cul-de-sac (shown); Water quality swales, bordering LaMarnia Way and the cul-de-sac (shown); Raingardens (shown); Open section roadway design; Reduced pavement width; and Disconnected rooftop drainage.

Lakeview Ave BSD

HydroCAD Model BSD Lots of small subcatchments Subcatchments routed to raingardens and swales and the biocell Ultimate outfall is at the end of the treatment train.

HydroCAD Model Inputs Bioretention Cell Custom Stage Storage Stage Storage Options: Surface Area Incremental Storage Cumulative Storage Void Options: Choose your own void space to account for stone or engineered soils

HydroCAD Model Inputs Bioretention Cell Multiple Outlets Device 1 is the first in line to contribute flow to Primary (culvert) Secondary is directed elsewhere (red circle in model diagram) Infiltration is subtracted from the equation Orifice/Grate: Underdrain Overflow

BSD 1-yr Outflow Hydrograph

Hydrograph Comparison

Raingarden Total Inflow = 0.72 cfs Inflow Volume = 2,178 ft3 Infiltrated Volume = 2,134 ft3 No outflow from the system 0.001 AF unaccounted for

Water Quality Swale Total Inflow = 0.53 cfs Inflow Volume = 2,135 ft3 Outflow Volume = 1,481 ft3 Volume Infiltrated = 566 ft3 0.002 AF unaccounted for

Bioretention Cell Total Inflow = 0.89 cfs Inflow Volume = 3,790 ft3 Outflow Volume = 261 ft3 Volume Infiltrated = 3,485 ft3 0.001 AF unaccounted for

Proposed BSD Measures BSD Practices Benefits 1. Open section roadway design Center-crowned roadways convey stormwater runoff to a grass-lined channel without curbs reducing generation of stormwater 2. Reduced roadway pavement width from 28 to 20 feet Reducing impervious roadways drastically reduces the amount of stormwater that is generated and requires treatment. 3. Water quality swales (dry) Conveys stormwater runoff to discharge points while also reducing sediment and nutrient loads through biological uptake and sediment deposition. Bioretention cell in Cul-de-Sac Stormwater volume reduction and pollutant load reduction. Eliminates need for detention basin, no standing water and eliminates possible vectors for mosquitoes. 5. Raingardens Depressional stormwater storage on private lots increases infiltration and increases time of concentration (stormwater release timing) Disconnected rooftop drainage Increases infiltration of stormwater 7. Construction guidelines Written construction guidelines to protect and save existing vegetation and minimize site compaction during construction maintains excellent site infiltration.

Better Site Design Stormwater Controls Treatment Train Approach Rain Garden Treatment Train Approach Raingarden Cell Flow Path Grass Swale This slide shows the “Treatment Train” approach used by LID. First the road is an open section with a reduced width. This reduces the amount of impervious area and resultant pollutant load, runoff volume, and peak runoff rate. The runoff flows across a grass filter strip to a series of bioretention cells that are connected by an open swale. This creates several opportunities to filter pollutants, encourage infiltration, and reduce runoff. In case of large storm events, there is a conventional pipe system that can safely convey large flows of runoff. Grass Filter Strip Raingarden Cell Storm Drain System

BSD Features Reduced Pavement Width Pavement width for LaMarnia Way and the cul-de-sac is reduced from 28 feet to 24 feet. Pavement is crowned to promote drainage to the adjacent swales

BSD Features Water Quality Swales 11.5 feet wide on the north and 7 feet wide on the south (excluding the swales bordering the cul-de-sac) at street grade. 1.5 feet deep with 1:1 side slopes. Swales surrounding the cul-de-sac are 6 feet wide at street grade, with the same depth and slopes. Discharge at the downstream end of each swale (adjacent to Lakeview Avenue) is regulated by a 3-inch outlet. Detention greater than 1 foot in depth spills over directly to the catch basin. Conveyance underneath driveways is via 12-inch reinforced concrete culverts.

BSD Features Bioretention Cell Diameter of 50 feet at street grade; the primary treatment area is 48 feet in diameter and 4 feet in depth of crushed gravel. Most of the surrounding sub-catchments drains to the treatment swales circling the cul-de-sac and then to the facility via a pair of 12-inch Class 5 (3000 lb/ft/ft) reinforced concrete pipes. Runoff from the surrounding pavement drains to the cell down grass-covered banks with 2:1 slope

BSD Design Features Raingardens Raingardens vary in surface area Length-to-width ratios of approximately 2:1 Each is roughly 1.5-2.0 feet below grade with gradual side slopes (e.g. 2:1).

Question 4 What is left to do? Channel Protection Check! Flood control!

Thank You!