Energy Efficiency Financing in MSMEs

Slides:



Advertisements
Similar presentations
INTELLIGENT ENERGY EUROPE Applying for funding where to focus? W. Gillett and V. Berrutto Heads of Unit Executive Agency for Competitiveness and Innovation.
Advertisements

Energy Conservation Energy Management.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Energy Management Practices: Rolling Mills 1. Contents Introduction Energy Intensive Processes & Reduction in Energy Expenditure through Innovative Practices.
Cleaner Production- A Move Towards Sustainability
Energy Management Potential in the Alberta Industrial and Manufacturing Sectors Proposed Energy Benchmarking and Potentials Study.
Prior activities of FEWE Under the bilateral and multilateral co-operation, several projects to support the rational energy use in different sectors.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
BEE SME Program in Jamnagar Brass Cluster November 19, 2009.
From PoAs to NAMAs a pilot case. 222 Agenda 1. Context of discussions 2. Objective and concept for NAMA Pilot Case 3. Introduction to example PoA – EE.
Page 1 AVC Group Delivering Heating Solutions for Social Housing AVC ALTERNATIVE ENERGY Saving energy Cutting Utility Costs Reducing Carbon Emissions.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Solapur Textile Cluster Solapur, Maharashtra State.
Aleksandar Durkovic Project Director SERBIA ENERGY EFFICIENCY PROJECT SEEP EXPERIENCES OF ENERGY EFFICIENCY PROJECT IN SERBIA November, 2011.
Worldwide, % of all primary energy is used in buildings.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
1 By, U.C. Gaur, GM, Energy Efficiency Vertical, SIDBI, Mumbai.
“Transforming construction in Mongolia using Supplementary Cementitious Materials” Mr. YEROOLT BAYART Director of International Cooperation Division, Ministry.
Scaling Up Energy Efficiency in India
Setting up Enterprise NextEnd. Introduction Setting of an enterprise is a complex process. Various institutions and organizations are providing training.
China’s Sustainable Energy Policy
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Reducing energy waste Good for us, great for the environment.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
SATI TEXTILE GROUP IPPC IMPLEMENTATION 23 March 2012.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 6 th January 2005.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy March 2005.
1 Energy Efficiency Financing in MSMEs GO GREEN WITH SIDBI AND GIZ GO GREEN WITH SIDBI ENERGY MISUSED CAN NOT BE EXCUSED.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Jagadhri Brass and Aluminum Industries Cluster Jagadhri, Haryana State.
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Cluster business development units and development of a SIDBI energy project management unit (SIDBI) Nov 18,
1 Albrecht Kaupp, Manager Indo-German Energy Programme, IGEN Energy Efficiency and Conservation, Demand Side Management and Energy Modesty “Are we still.
Imran Ahmad Additional Director Infrastructure, Housing & SME Finance Department State Bank of Pakistan.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
ENERGY CONSERVATION IN SMALL SECTOR TEA PROCESSING UNITS IN SOUTH INDIA Executing agency: Tea Board of India Implementing agency: TIDE GEF agency: UNDP.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Bank aus Verantwortung Overview of KfW’s Solar Activities Andreas Thermann Deputy Director KfW Office New Delhi Coordinator - Energy Sector New Delhi,
Greenhouse Gas Emission Reduction and Industry The World Bank March 2007.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
MARKET BASED MECHANISM Perform, Achieve and Trade A.K.ASTHANA Sr. Technical Expert, GIZ, India.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Manufacturing Solutions- Weaving TexManage. Modules TexManage Manufacturing Solutions- Weaving Manufacturing Modules Production Management Grey Ware House.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
© OECD/IEA 2015 Energy Efficiency Today: Mobilizing investment through Markets and Multiple Benefits Tyler Bryant International Energy Agency.
Financing Guidelines of IREDA.  Incorporated on March 11, 1987 as a Public Limited Government Company  Administrative Ministry - Ministry of Non- Conventional.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Building Energy Efficiency in India An Overview BEE.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
Solar Energy Ashley Valera & Edrick Moreno Period 6.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Registrations | Subsidies | Loans. Introduction Yashika Enterprises is a well-known name in Thane District (Mumbai). Established in 2011 We offer a very.
Market Development of ESCO in China Dai Cunfeng Chinese Renewable Energy Industries Association (CREIA) Adviser of EMC Association (EMCA)
A Road Map to Energy Savings: Elements of a Comprehensive Energy Plan Presented by: Kenny Esser, Senior Associate June 18, 2014 Passaic County Division.
Uganda Cleaner Production Centre (UCPC)
Utility Bills Reduction by Energy Consumption Management
Energy Efficiency Opportunities for Manufacturing Industries
BDL Green Incentives SwitchMed Connect Barcelona.
Market aggregating models – scaling an EE portfolio
Financing End to End Energy Efficiency Investments in MSMEs
Seminar On Energy Audit Submitted To: Submitted By:
Financing Sustainable Energy in Ukraine: EBRD Experience
SIDBI’s Initiatives for Energy Efficiency in MSMEs
ENERGY CONSERVATION IN THERMAL POWER STATION
ESCO Committee of China Energy Conservation Association (EMCA)
Seventh Regional 3R Forum 2-4 November 2016
Presentation transcript:

Energy Efficiency Financing in MSMEs K.S.Rawat Asst. General Manager GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 1 1

An overview of India’s Enery Scenario vis a vis MSMEs India is the fourth-largest energy consumer in the world, after the United States, China, and Russia. MSME sector consumes almost half of the total energy consumption by industrial sector. Many MSMEs are highly energy inefficient. Energy cost, as also profits constitute 5% of total sales. Scope to reduce energy uses almost 25% Thus, EE can increase profit by 25%. GO GREEN WITH SIDBI 2 2 2

Issues and Constraints High energy consumption due to obsolete technology/processes Lack of awareness / information on Energy Efficiency (EE)/ EE best practices/EE technologies Inadequate focus on EE/ clean tech/ renewable energy financing by the banks Lack of sufficient expertise in banks to assess EE loans Eg. ESCOs not taking off in India, but most successful in Europe GO GREEN WITH SIDBI 3 3 3

Energy Efficiency as a double strategy Efficiency gains directly influence profits savings Resource cost Resource cost Profit Profit GO GREEN WITH SIDBI

SIDBI – towards sustainable financing ACTIVITIES COVERED Energy Efficiency – equipments, green building Cleaner Production - Waste Management –agro waste, industrial waste Fuel Switching- diesel/petrol to CNG/LPG, coal to oil/gas based furnace CDM- Jodhpur steel rerolling cluster has been registered under UNFCC ESCOs – Energy Service Companies Renewable Energy –solar, hydro, bio mass, wind power GO GREEN WITH SIDBI GO GREEN WITH SIDBI 5

SIDBI’s Financial Initiatives Pooled Lines of Credit from International/Bilateral Agencies (JICA, KfW, AfD, WB) Simple Eligibility Norms Concessional Lending Handhold support to Credit officers GO GREEN WITH SIDBI 6 6 6

EE-CP Line of Credits to SIDBI KFW Environmental Line - Euro 15.24 million from KfW, Germany in 2003. Duration of the Project – Feb. 2004 – Dec.2008 Status : Fully utilized, 41 projects covered. JICA Energy Saving Line Phase I - JPY 30 billion [Rs.15.8 billion] under ODA from Japan International Cooperation Agency (JICA). Duration of the Project – 3 years from August 2008 Status : Fully utilized, provided assistance to more than 2900 MSMEs. JICA Energy Saving Line Phase II - JPY 30 billion [Rs.15.8 billion] under ODA from Japan International Cooperation Agency (JICA). Duration of the Project – June 2011 to June 2016 Status : Fully committed. Provided assistance to around 1880 MSMEs with aggregate assistance of around Rs. 2154 crore GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 7 7

Line of Credits to SIDBI KFW Environmental Line - Euro 38.50 million from KfW, Germany in 2009. Duration of the Project – Nov.2009 – Dec. 2014 Status : Provided assistance to around 282 MSMEs with aggregate assistance of around Rs.306 crore. KFW Energy Efficiency Line - Euro 50 million from KfW, Germany in 2009 Status : Provided assistance to around 275 MSMEs with aggregate assistance of around Rs. 270 crore AFD Energy Efficiency Line - Euro 50 million from AFD, France in 2010. Duration of the Project – May 2010 – May 2014 Status : Fully utilized provided assistance to around 641 MSMEs. WorldBank Line of Credit - Environment and Social Risk Management Framework (ESMF) under WB-LoC (USD 120 Million) and WB-LoC-Additional (USD 400 Million). GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 8 8

SIDBI’s Loan Sanctioning Procedure under EE & CP LoCs (i) List based approach under JICA and AfD and KfW LoCs An Energy Saving Equipment List (ESEL), an exhaustive list of energy saving equipments for various MSME sectors has been prepared by the consultant appointed by JICA. It takes into consideration the technology which results in saving of electricity by atleast 10%. The branch officers are required to check only that whether the proposed equipment is included in the ESEL or not. KfW has also a list which cover certain equipments.   (ii) Tool based approach under KfW LoCs A Loan Eligibility Assessment tool has been developed by the consultant appointed by KfW. Besides, Energy Saving Equipment List also prepared. The branch officers are required to collect the input energy & production data (Prior and Post-Investment) from the borrowers and the same will be used for the loan eligibility assessment. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 9 9

Tool Based Approach --------- Loan Sanctioning Procedure III. Monitoring II. Eligibility assessment I. Application Loan Application form Assess Energy/ Emission saving potential Sanctioning of loan Requirem ents fulfilled? No Sanctioning of loan No Yes Implementation of measure by borrower Post loan data provision by borrower or audits and extrapolation Verification of loan and LoC After implementation Establishing Baseline GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 10 10

Loan Sanctioning Procedure Detailed steps of Loan Appraisal Procedure 1. BO - Data request to borrower 2. BO – Enter data into Assessment tool 3. BO – Enter result from the Tool into Reporting Table 4. BO – Monthly report to EEC 5. EEC –evaluate and approve monthly report from BOs GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 11 11

Loan Sanctioning Procedure 6. BO - Data Request to borrower for baseline post monitoring data 7. Customer– Enter data into Monitoring tool 8. BO – Enter result from Monitoring Tool into Reporting Table 9. BO – Provide monthly report to EEC 10. EEC –Evaluate credit line; Detailed steps of Post Monitoring GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 12 12

Loan Sanctioning Procedure - Output GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 13 13

Loan Sanctioning Procedure – Data Collection Template Current Production and Energy Use Data Please provide the following data : Month wise for past 12 months OR Totals for past 12 months Month Year Electricity Consumption Production data Fuel 1 (please specify fuel name) Fuel 2 (please specify fuel name) Fuel 3 (please specify fuel name) Fuel 4 (please specify fuel name) kWh/Month Product type Units (please specify) GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 14 14

Loan Sanctioning Procedure – Data Collection Template Information on Proposed Investments Current Technology Proposed Technology Investment required in Lakh INR Estimated Energy Consumption after implementation Estimated Production data Electricity Fuel 1 Fuel 2 Fuel 3 Fuel 4 Units (please specify) GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 15 15

Loan Sanctioning Procedure – Data Collection Template Information on Proposed Investments Current Technology Proposed Technology Improvements in Air pollution Water pollution Soil contamination Waste treatment / handling Raw material productivity Waste intensity GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 16 16

Case Studies – 01 CNC Turning Center, Lucknow A newly established unit located in Lucknow. The unit was started in January, 2012 and involved in manufacturing of various types of railway components like Cylinders and Pistons Baseline scenario The machine installed is used for performing different kinds of machining job works. The machine installed is Sprint 25 TC and manufactured by Batliboi, Surat . Energy efficient operation with quality production Less dependency on machine operator because of CNC features Linear motion guide ways for X & Y axis 60 degree slant angle bed Compact less floor space with all items hydraulics power pack, electrical cabinet etc. machine mounted Coolant tank integral part of machine base GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 17 17

Case Studies – 01 CNC Turning Center, Rajendra Industrial Corporation, Lucknow Actual Energy Savings by installing CNC Turning Center The analysis of monitoring data reveals that the energy saving potential of energy efficient CNC Turning Center 33 % when compared with the conventional lathe GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 18 18

Case Studies – 02 Rapier loom, M/s Textiles, Karimnagar M/s Textiles is a green field project and established in June 2011. The plant is located in Plot No. 31, Sircilla Textile Park, Baddenapalli Village, Sircilla Mandal, Karimnagar District of Andhra Pradesh and is engaged in the manufacture and marketing of grey cloth. Baseline scenario The raw material, polyester grey yarn, is procured from large companies like Reliance and the finished product is marketed through local traders/ buyers. The plant operates for two shifts in a day and 300 days in a year. Since it is a green field project, at the inception of the project, the management had the option to go for either less capital intensive conventional looms or energy efficient rapier looms. However, the management was aware of the advantages associated with the rapier looms over conventional looms such as high production, low maintenance costs, low energy consumption, and high throughput and quality. The plant receives its electricity supply from the Sircilla Electric Cooperative GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 19 19

GO GREEN WITH SIDBI Case Studies – 02 Energy saving high speed Rapier Looms M/s Textiles had installed energy saving high speed rapier looms in their plant The equipment was supplied by Sulzer, a leading manufacturer of power looms in India. There are a total of 36 rapier looms (the major components are warp beam, heddles, harnesses, shuttle, reed & take up roll) with an aggregate installed production capacity of 27 lakh meters per annum. The manufacturing process involves major operations like shedding, picking, battening, and taking up. The total load of rapier looms is 126 HP (@3.5 HP). The rapier looms are designed for processing all kinds of manmade yarn and the advantages are: High production capacity Low energy consumption Suitable to weave wide variety of fabrics Low maintenance cost Man-machine interface for easy operation and control. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 20 20

Case Studies – 02 Rapier loom, M/s Textiles, Karimnagar Energy saving potential Energy consumption of rapier looms and conventional looms were monitored during the field study and the data was analyzed to assess the actual energy saving potential of the rapier looms. The specific energy consumption was found to be 0.3 kWh/meter for conventional looms and 0.206 kWh/meter for high speed rapier loom. The analysis of baseline and the post-project energy consumption data reveals that the energy saving potential of rapier looms is 31.4% when compared to conventional looms. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 21 21

Case Studies – 02 Rapier loom, M/s Textiles, Karimnagar GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 22 22

Case Studies – 03 Shree Industries Pvt. Ltd Business Line: Manufacturing of Tyres and Tubes for automobiles. (Small Scale) Old Machine: Conventional pressing machine which consumes high energy and process time of rubber heating is slow with a production of 400 tyres/day. New machine: Energy Efficient Roto-cure machine which requires less time to heat the rubber thereby increase the production rate (500 tyres/ day) of the unit. Loan amount assisted: Rs. 150 lakh Project Benefits: Annual Electricity saving: 14,370 kWh Annual fuel saving: 22,500 litres of Diesel Annual Green House Gas Reduced: 72.25 tons of CO2 equivalent. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 23 23

Case Studies – 03 Shree Saraswati Industries Pvt. Ltd New Roto-Cure Machine Old machine (Pressing Machine) GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 24 24

Case Studies – 04 Ceramic Tile Manufacturing unit Revenza Ceramics 16.07.14 LNG consumption 2,50,000 SCM of LNG / month Electrical energy consumption 62,000 kWh/month Annual production (Year 1) 30,000 MT Surface area per kg of tiles 0.067 m2/kg Gas consumption per year 30,00,000 SCM Gas energy consumed per year 3,27,90,698 kWh Loan amount 700 Lakh Production in m2 of product Assumed production output 20,06,706 m2/yr.   Electrical Gas Estimated energy consumption 7,44,000 kWh/yr. SCM/yr. Specific energy consumption 0.37 kWh/m2 1.49 SCM/m2 Benchmark (BEE report) * 1.25 ~1.43 1.28-2.11 Average value 1.34 1.695 Energy Savings 19,44,986 kwh/yr. 4,01,366 CO2 emission savings 1,614.34 tons/yr 887.02 CO2 emissions saved per lakh of loan 3.57 tons of CO2 /YR GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 25 25

Ceramics, Morbi. Ceramic wall tile manufacture Technology applied is LNG fired roller Kiln. Other machinery such as presses and glazing lines are also energy efficient. Specific CO2 savings estimated at 3.57 tons of CO2/a. Based on benchmark for the Indian ceramic tile manufacturing industry, the plant is expected to have lower specific energy consumption. The benchmark for the ceramic tile industries applied is taken from a BEE study on EE options in ceramic cluster. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 26 26

GO GREEN WITH SIDBI Some Cases Project of setting up of a foundry unit by acquisition of Automatic Moulding Machine, Fully Automatic Sand Plant, CNC Surface Grinding/Polishing Machine (Deburring Machine ), Online Shot Blasting Machine, Induction Furnace with Cooling System, Automatic Pouring System . A printing unit going for 4 colour offset printing machine instead of normal printing machine. CNG Taxi Financing, Mumbai – Collateral free loans provided to 838 taxi drivers in Mumbai to phase out their old taxis under a structured arrangement with Taxi drivers Association and Maruti Suzuki. Chandigarh Auto Loan Financing- SIDBI has re financed number of auto for substituting petrol with LPG based system. Solar Lanterns in Manipur – Micro loans to the ultimate beneficiaries in Manipur for purchasing 50,000 solar lamps. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 27 27

GO GREEN WITH SIDBI Some Cases Channel Financing - Partnered with NBFCs, to provide loans to MSMEs to acquire energy efficient equipments/CNG&LPG vehicles under a simplified credit delivery mechanism without any collateral security. Structured Arrangement- Tied up with a husk fired gassifier manufacturer for installing husk based gasifiers for boilers in industries. Tied up with a CNC machine manufacturer for supplying equipment to MSMEs. ESCO based financing for installing variable frequency drives in various industries for energy efficiency has been provided with a revolving limit. Green buildings with ECBC, LEED or Griha rated projects are financed at Faridabad, Indore, Mumbai, New Delhi, etc. GO GREEN WITH SIDBI GO GREEN WITH SIDBI AND GIZ 28 28

Save today. Survive tomorrow Thank You Please Visit: www.sidbi.in CUT EMISSIONS TO SAVE MOTHER EARTH LESS YOU BURN – MORE YOU EARN 29 29