12 th ANTAH GROUP CONFERENCE 11 th - 14 th AUGUST 2005 Guoman Hotel, PortDickson Negeri Sembilan 12 th ANTAH GROUP CONFERENCE 11 th - 14 th AUGUST 2005.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.
ATMES Spring Meeting April 26-27, 2012 Myrtle Beach, South Carolina International Projects.
LIST OF STAFF S.N o. Name of Employee Designati on Work Load Name of Work Sanction Cost (in Lacs) Work Executed up to date Remainin g work 1.Sh. A.B.
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
Luise Lorenz Christina Mohr Niklas Wilkens Miguel Cabezudo Nicolas Laflesselle.
Module five: Session Two M5S21. Training objective To review the various financing options available to road contractors M5S22.
MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
CEDR SG Road Safety Meeting April 6th 2005 Safey Audits. E xplanation of Audits and the Requirements at each Stage of the Audit Process. Presented by Harry.
1 Freight Operations Information System COM/CCM’s Conference
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
Presented by: Ms. Le Thi Lan Bizdev.asia MODELLING VIETNAM’S EXPRESSWAY NETWORK.
Civil engineering branches & scopes
Performance Management Reporting: Quarter 4 Guide to Q4’s reporting Overall performance for Q4 Key Service Priorities Other performance indicators Next.
CEN TC 256/SC 1 Brief from plenary meeting Brussels, EFRTC General Meeting Prague, 22 nd June 2012 Imrich KORPANEC, EFRTC Secretary General.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Compliance and Ethics Training Overview
Constructionsite Roles in Construction Ron Gatepain.
Construction Contracts and Project Delivery Methods
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
ItSMF-Australia Deakin University “Where’s My Dinner?” Darren Burgess Program Director, Service Improvement Program Business Services Manager Information.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Linggi Port Oil & Gas And Industrial Park
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
1 Briefing on the operation and management of Public Private Partnerships (PPP)
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
DEPARTMENT OF LABOUR Expenditure – 30 JUNE MAIN DIVISIONS OF THE VOTE.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
PRJ566 Project Planning and Management Project Management Concepts 1.
Portfolio Committee on Appropriations Quarter 1 Expenditure and Performance 24 August 2012 The Presidency Department of Performance Monitoring and Evaluation.
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PLUS Expressways STID3074 IT PROJECT MANAGEMENT GROUP MEMBER
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
IPC Working Group 34 - Updates on IT support to the IPC Geneva November 6, 2015 Patrick Fiévet Head of IT Systems Section.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
Office of Procurement Services.  Vendor Application Website: 
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Road Information System / Road Data Bank 10 April 2013 Lars Bergman M. Sc. In Civil Engineering Long Term Planning Swedish Transport Administration.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
THE CONSTRUCTION TECHNOLOGY CONSULTANTS Lowther-Rolton Established 1987 Safety Quality Leadership Innovation Commitment The Methodology and Benefits of.
What does a Civil Engineer do?
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Rob Connatser NSS Instrument Work Packages and XLPM.
PLAZA SALTILLO REDEVELOPMENT OVERVIEW OF TRANSACTION MARCH 17, 2016.
Value Engineering Study and Risk Assessment
FIRST MOVER ROADS PPP PROGRAMME
The East Link Project A first step towards a new generation of Swedish railway mainlines Johan Sundin Commercial Director.
Financing Land Development Projects
DTF implementation Roles and responsibilities
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Joint CIB W099 &TG59 International Safety, Health & People In Construction Conference AN EVALUATION OF COLLABORATIVE PRACTICES IN CONSTRUCTION CONSTRACTING.
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
Ethiopia Operational Hub (ETOH)
Ethiopia Operational Hub (ETOH)
Presentation transcript:

12 th ANTAH GROUP CONFERENCE 11 th - 14 th AUGUST 2005 Guoman Hotel, PortDickson Negeri Sembilan 12 th ANTAH GROUP CONFERENCE 11 th - 14 th AUGUST 2005 Guoman Hotel, PortDickson Negeri Sembilan PRIVATISATION OF LEBUHRAYA KAJANG - SEREMBAN

Project Title Privatisation of Lebuhraya Kajang Seremban (KASEH) Concessionaire/ Client KASEH Lebuhraya Sdn. Bhd. Turnkey Contractor IJM Construction Sdn. Bhd. Design Consultant HSS Integrated Sdn. Bhd. Project Architect Arkitek M & L Sdn. Bhd. Toll Equipment Consultant (TCS & TCSS) Perunding Eagles Sub-Contractor (Package 1B & 2A) WCT Construction Sdn. Bhd. Packages Package 1B Package 2A Package 2B Package 3 Project Information

Other Consultants Scope Of Work SADEC Projects Sdn Bhd Technical Support Services SADEC Sdn Bhd Project Advisor Zul Rafique and Partners Legal Hasrah Sdn Bhd Land Consultant Symonds Travers Morgan/MAG Traffic Consultants Khairi Consult Sdn Bhd Independent Consulting Engineer TRARS Consult Sdn Bhd Road Safety Audit Raine & Horne (M) Sdn Bhd Land Valuer Project Information

KASEH IJM (Turnkey Contractor) Governmen t Lenders Independent Consulting Engineer (ICE) Khairi Consult Design & Consultant (SC) HSS Integrated Arkitek M&L Perunding Eagles MHA reporting information reporting monitoring Contractual Relationship Functional Responsibility PRIVATISATION OF LEBUHRAYA KAJANG SEREMBAN (KASEH) Relationship Between Various Parties With Respect of the Works

SECTION Section 1 Section 2 Section 3 TOTAL SUB-SECTION 1A 1B 2A 2B- SECTIONAL LIMITS LOCATION LENGTH (Km) INTERCHANGES TOLL PLAZAS REST & SERVICES AREAS nos2 nos 1 nos + Partial Grade Separated Junction 3 nos2 nos1 nos - 2 nos - CH 0.00 to Kajang Selatan Interchange Kajang Selatan Interchange to CH To CH26000 To CH32700 CH 0.00 to Kajang Selatan I/C Kajang Selatan I/C to South of Pajam I/C To south of Mantin I/C South of Mantin I/C to south of Setul I/C South of Setul I/C To Paroi (partial Grade Separated Junction) Highway Information Note: Section 1A has been completed CH32700 To CH44275

Proposed Senawang – Paroi Link Road Proposed Nilai - Pajam Link Road S E R E M B A N PAJAM INTERCHANGE NILAI INTERCHANGE MANTIN INTERCHANGE SETUL INTERCHANGE N E G E R I S E M B I L A N S E L A N G O R NILAI SEMENYIH MANTIN PAJAM BERANANG BANGI INTERCHANGE SEMENYIH INTERCHANGE PORT DICKSON INTERCHANGE PRIVATISATION OF LEBUHRAYA KAJANG SEREMBAN NORTH-SOUTH HIGHWAY PANTAI PAROI INTERCHANGE KAJANG KAJANG SELATAN INTERCHANGE SENAWANG INTERCHANGE KLIA INTERCHANGE KASEH Highway Proposed Realignment of Mantin-Setul Road Revised Alignment between Jelebu to Panchor as approved by UPEN N BEROGA JELEBU INTERCHANGE KAJANG Sg. Rinching Sg. Semenyih Sg. Beranang KTM RAILWAY TRACK Legend: Revised Alignment between Jelebu to Panchor as approved by UPEN Proposed Realignment of Mantin-Setul Road N24 N28 N36 B18 B34 1 N N N KAJANG – SEREMBAN HIGHWAY Lebuhraya ELITE BYPASS Sg. Langat SEREMBAN (N) INTERCHANGE BANGI NEW NILAI INTERCHANGE Alignment as per Concession Agreement

Kajang Selatan I/C FR 1 B18 N36 Kajang Selatan Toll Plaza Semenyih Interchange Pajam Interchange, Jelebu Toll Plaza FR1 Toll Plaza Mantin Interchange Section 1 Section 2 FR1 Setul Interchange Jelebu Interchange Paroi Interchange Section 3 FR51 FR86 Toll Plaza Setul Toll Plaza Tolling Concept

Implementation Programme

Supplemental Concession Agreement (SCA) CHANGES TO THE CONCESSION AGREEMENT In principle the Steering Committee for Privatisation have agreed to forward the following changes to be part of the Supplemental Concession Agreement. 1To adopt PLUS’s Toll Rates approved in To extend to Concession Period by seven years ending To extend the construction period to first quarter of To reschedule the payment for the reimbursable land cost after all commercial borrowings had been fully paid. 5To accept and adopt the realignment proposal for Package 2B (Mantin to Setul). 6To allow for Sectional Tolling on completed sections.

Status of Land Acquisition PACKAGE 1A -FULL POSSESSION OF SITE OBTAINED  PACKAGE 1A -FULL POSSESSION OF SITE OBTAINED  PACKAGE 1B-FULL POSSESSION OF SITE OBTAINED  PACKAGE 2A-FULL POSSESSION OF SITE OBTAINED  PACKAGE 2B - MANTIN – SETUL (PENDING FINALISATION OF REALIGNMENT) (PENDING FINALISATION OF REALIGNMENT)  PACKAGE 3 - LAND ACQUISTION 100% COMPLETED

Progress Status Packages Package 1B Package 2A Package 2B Package 3 Commencement Date 15-Jul-04 To be advised by KASEH Physical Progress Schedule Ahead / Delays Ahead / Delays (days) Design Progress 98.80%99.10%33.85%47.67%

Progress Photographs

Location : CH FR 1 (Kajang Selatan Interchange) Description : Pavement works in progress Progress Photograph

Location : Bridge No. 1 (Kajang Selatan Interchange) Description : Maintain Load Test for 500mm dia spun pile Progress Photograph

Location : Bridge No. 1 Description : Rebar fixing for I-18 beam Progress Photograph

Location : CH (Mainline – Kajang Selatan Toll Plaza Area) Description : Earthworks in progress Progress Photograph

Location : CH (Mainline - Kajang Selatan Toll Plaza Area) Description : Earthworks in progress

Progress Photograph Location : CH (Semenyih Interchange) Description : Bridge over Mainline

Location : CH 1500 – Slip Road 2B (Semenyih Interchange) Description : Earthworks in progress. Progress Photograph

Location : Semenyih Toll Plaza Area Description : Installation of Rebar for DBC No. S-4 Progress Photograph

Location : CH Description : Preparation of formation

Progress Photograph Location : CH (Mainline) Description : Preparation of formation

Progress Photograph Location : Bridge No.3 (B18) Description : Location of Mainline Bridge at Semenyih-Bangi road (B18)

Location : Bridge No. 4 - Sg. Semenyih Description : I-18 Beam casting in progress Progress Photograph

Location : Bridge No. 4 - Sg. Semenyih Description : Preparation of formation (view looking northbound)

Progress Photograph Location : CH (Mainline) Description : Preparation of formation (view looking northbound)

Location : CH (Mainline) Description : Earthworks in progress Progress Photograph

Location : CH (Mainline) Description : Preparation of formation (view looking southbound)

Location : Bridge No.6 - Sg. Batang Benar Description : Bored pile works in progress Progress Photograph

Location : Ch (Mainline) Description : Preparation of formation level in progress Progress Photograph

Location : CH (Mainline) Description : Laying of sub-base (view looking northbound)

Location : Bridge No.7 Description : Bore hole works for soil investigation in progress. Progress Photograph

Location :CH Slip Road (Pajam Interchange) Description : Earthworks in Progress

Progress Photograph Location :CH Slip Road 2A/2B (Pajam Interchange) Description : Earthworks in Progress

Progress Photograph Location : DBC TR11-1 CH17660 Description : Construction of RC sump in progress

Progress Photograph Location : Pajam Toll Plaza Description : View of site office

THANK YOU PRIVATISATION OF LEBUHRAYA KAJANG - SEREMBAN