Utilities in MaineDOT’ s Right of Ways. MaineDOT’ s Jurisdiction All State and State Aid roads. All Facilities and.

Slides:



Advertisements
Similar presentations
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Advertisements

Drawings of Sufficient Detail
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Railroad Commission of Texas Railroad Commission of Texas Pipeline Safety Division Damage Prevention Program.
The Americans with Disabilities Act Will McClure California Division Office.
PIPE CULVERT By CH. VENKATARAMAIAH.
Created by: Victor Lund, PEKen Johnson, PE, PTOE St. Louis CountyMnDOT.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Georgia underground marking standards
3-1 Utility Conflict Identification and Management Lesson 3.
Excavation & Trenching Presented by Name Title Date.
WAR The Battle WAR for the Right of Way. City of Lansing v. Wolverine Pipeline Company: Losing the Battle but Winning the War.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
SPEED LIMITS Joe Gorfida, Jr. Main Office: (214) Direct Dial: (214) TEXAS MUNICIPAL COURTS EDUCATION CENTER 2012 Municipal.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
The State Water Project, Unauthorized Encroachments and the California Water Code State of California Department of Water Resources Division of Operation.
Highway Utility Engineer, INDOT
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
Rev: Section 6 Alternative Fall Protection.
Who, Why, and How was this Allowed to Happen? - By Linda Beaumont 1.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
Water and Wastewater Certification 1 Water & Wastewater Reference Manual.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Senior Utility Engineer, INDOT
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Telecommunications Law 1. 2 Summary of Proposed Amendments To Scarsdale Zoning Code PRESENTED BY: Joseph Van Eaton.
La Center, Washington: Balancing Pipelines and Populations 1.
Preparing Foundations for Cylinders & ASME Tanks
2010 Florida Building Code: I nterpretation P rocess O verview.
Storm Hardening Workshop Docket No Verizon Florida, Inc. July 13, 2006.
Copyright © Excavations, Subpart P.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
VI. Developing a VSMP Program General Stormwater Training Workshop.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
AV Training Presentation 3 33 CFR, Part 66 Private Aids to Navigation.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
The View From Olympia: Right of Way usage fees as revenue replacement mechanism for future of declining cable franchise fees April 29, 2105 Kenneth S.
Complete Streets Training Module 10 – Street Elements: Design & Safety Considerations for Context-Based Solutions.
Excavation & Trench Safety
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D
105 IAC 13, UAP, and 10 State Lynette K. Werner, P.E. Highway Utilities & Railroad Engineer, INDOT June 21, 2016.
GEOTHERMAL WELLS What is Geothermal Heating and Cooling? Conventional heating and cooling systems use air to transfer heat into and out of buildings. Geothermal.
Presented by Leighton Porter, EIT Monte R. Lee & Company
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Georgia underground marking standards
Cross Connection Survey Training
General Road Construction Information
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Objectives Upon completion of this module you should be able to:
Manual on Accommodating Utilities in Pierce County Rights-of-Way
Utility Permitting Overview
Town of Westport pLANNING bOARD SUBDIVISION RULES AND REGULATIONS
TxDOT Utility Related Issues
105 IAC 13, UAP.
Municipal Land Use Law C.40:55D-53 - NEW DEVELOPER
Regulation Amendment AM April 3, 2018.
Design Criteria CTC 440.
Walker Street Reconstruction Project 25% Design Public Hearing
Comments on the National Environmental Management: Integrated Coastal Management Amendment Bill Adv Gary Birch 23 July 2013.
Drawing of Sufficient Detail (DOSD)
Presentation transcript:

Utilities in MaineDOT’ s Right of Ways

MaineDOT’ s Jurisdiction All State and State Aid roads. All Facilities and Appurtenances within the Highway limits must also comply with any applicable National Standards. Where those standards differ from what is stated herein, the higher degree of protection shall prevail.

Maine DOT’ s Jurisdiction The Utility Accommodation Rules govern installations within the limits of state and state- aid Highways, and are the default rules within the limits of state and state-aid Highways in Compact Areas where municipalities do not have their own more stringent rules [35-A MRSA §2503 (21)].

Compliance with Laws current OSHA regulations compliance with the MUTCD applicable requirements of ADA Maine’s requirements for the Protection of Underground Facilities [23MRSA §3360-A] as administered through MPUC and reported to Dig Safe® System, Inc., and each Utility using OKTODIG.

Preferred Corridors Water & Sewer Lines Under the Traveled Way Gas Lines Under the Shoulder Telephone/Electric Conduit Under the Shoulder or Sidewalk

Minimum depth requirements PUC verses MDOT Services-36”MDOT/30”PUC Low Pressure Mains -36” Both High Pressure over 100psi-48”MDOT

Vertical Separation between Utilities 12” PUC & MDOT PROCESS to follow when issues occur Notify affected Utility Come to agreement with affected Utility

PUC-Where there is interference with other subsurface structures, including other utilities, the pipe shall be laid at a clearance distance of not less than twelve (12) inches away from such structures unless adequate shielding is provided to protect the gas pipeline and the other utility. MDOT-Vertical Clearance Between Facilities Where underground Facilities must cross other Facilities or Appurtenances; the angle of such crossing shall be as close to 90 degrees as possible, with a minimum vertical clearance of 1 foot.

Cooperation with Other Authorized Entities Throughout the design and installation of any Facilities and Appurtenances within the Highway limits, Authorized Entities must address the needs of all other Authorized Entities with regard to their existing or Proposed Installations located in the vicinity of another Proposed Installation. This shall include maintaining sufficient offsets from other Facilities and Appurtenances and assuring that all other Authorized Entities have reasonable access to their own Facilities and Appurtenances during construction. Where Authorized Entities are unable to resolve conflicts in accordance with these rules, MaineDOT shall make the final determination.

Horizontal Clearance Between Facilities Unless specifically permitted otherwise, a 3-foot minimum horizontal clearance shall be maintained between all underground Facilities and Appurtenances. Measurement between underground Facilities and Appurtenances shall be taken horizontally from the closest edge of the Facility or Appurtenance. Aboveground pole lines (excepting crossings and services) shall also be included in this standard where those poles occupy a consistent offset. Measurement to a pole line shall be to the nearest face of pole or to the vertical plane established longitudinally through the center of the pole line between poles.

Verification of Separation Requirements All trenchless installation methods are required to have the ability to accurately determine the horizontal and vertical position of the tip instrument when utilities, including drainage structures, are being crossed during installation.

Verification of Separation Requirements Open cut methods would fall under the Dig safe rule. Hand shovel to expose Utility.

Pavement Cuts Wherever pavement is to be cut, all edges shall be cut neat and straight.

Pavement Moratorium A. Light Capital Paving (LCP): No moratorium. B. All other paving overlays of 5/8 inch or more or any “mill and fill” project: 3 years

Pavement Moratorium Cont. C. Any construction work of higher order than an overlay, including new or full construction, reclaiming, “foamed asphalt”, and other forms of rehabilitation, such as partial reconstruction or using recycled asphalt pavement (PMRAP): 5 years

Pavement Moratorium Cont. If the applicant can show that the need for an opening permit could not have been anticipated before the highway was paved and that it has made an effort to investigate alternative installation procedures, MaineDOT may elect to consider an Exception in accordance with Section 14, Exceptions and Appeals.

Pavement Moratorium Cont. In the case where an exception is granted, MaineDOT will normally require a higher standard of repair as shown on the Pavement and Trench Restoration Details in the Appendix. MaineDOT may additionally increase the 10% permit fee.

STANDARD Trench Detail

MORATORIUM Detail

Inspection All work performed within the Highway limits will be subject to periodic inspection by MaineDOT. In addition, and at MaineDOT’ s discretion, a dedicated MaineDOT or third party inspector may be assigned to oversee any specific projects or work activities to ensure that the state’s interests are sufficiently protected. All costs associated with this inspection shall be borne by the permittee, over and above the permit fee.

Thanks Any Questions ??