Schneider Electric is the Global Leader in Pre Fabricated Modular Solutions

Slides:



Advertisements
Similar presentations
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Advertisements

The Data Centers, LLC Wolf Technology Center 1 Campus
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Total HVAC Control from anywhere Easy control that can save a fortune
Components of HVAC System
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cooling Product Positioning
PROVIDING next generation SCIFs worldwide!
Engineered Water Heating Solutions An Introduction to Hubbell and The Hubbell Product Line Phone: Fax:
InfraStruxure for Small IT Spaces Solution Introduction.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Presentation Technology ORC GREEN MACHINE
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Intelligent Series.
Schneider Electric IT Business North America Advancing Date Centers around Life Cycle Management. May 2011.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
MODULAR DATA CENTER PUE
September 18, 2009 Critical Facilities Round Table 1 Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Confidential & Proprietary. What happens when Wind /Solar do not meet requirements? What next?
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Introduction to EMC.  Data Centre physical infrastructure specialist  Technical environment M&E.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
MISSION CRITICAL COLOCATION 360 Technology Center Solutions.
Infrastructure Improvements 2010 – November 4 th – Hepix – Ithaca (NY)
Schneider Electric: Total Cooling Solutions for Data Centers
Nikhef/(SARA) tier-1 data center infrastructure
2 Automation Power Datacenter Facilities Automation - The Company Belgian Engineering Company founded in 1961 by private investors Market leader in conversion,
Energy-Efficient Infrastructure Management in the IoT era Presented by: George Dritsanos, IT BU VP for Greece, Cyprus & Malta.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Containment Solutions. Cooling Efficiency Solutions Passive Thermal Containment Blanking Panels Foam, Skirts and Covers Raised Floor Grommets Brush Seal.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
© 2014 Eaton. All Rights Reserved.. Eaton 93PM: Value, Benefits, and Features.
Data Center Infrastructure Total System Effectiveness Matt Gleason, CoreSite Jim Hughes, Mitsubishi Electrical Power Products.
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
InfraStruXure Systems Alex Tavakalov
West Cambridge Data Centre Ian Tasker Information Services.
Dell EMC Modular Data Centers
Extreme Scale Infrastructure
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Containment Solutions
110 1.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Compact line ‘EW*D~J-’ water-cooled chiller range
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Unit 2: Chapter 2 Cooling.
The Data Center Challenge
Prefabricated power solutions Fast deploying, pre-tested systems that lower total cost of ownership March 2015 sales trainings.
MODULAR DATA CENTER PUE
CERN Data Centre ‘Building 513 on the Meyrin Site’
WELCOME Indoor Chillers.
HIGH-PERFORMANCE COMPUTING SYSTEM FOR HIGH ENERGY PHYSICS
Closing the Gap to Free Cooling in the Data Center
Lecture Objectives: Answer questions related to HW 4
Sustainable Refrigeration at the Right Price
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
WELCOME Indoor Chillers.
Lecture Objectives: Discuss HW4 parts
Direct Current (DC) Data Center
ALL-ELECTRIC TEMPERATURE CONTROL FOR CHILLED, FROZEN AND
فایل ارائه حاضر توسط مرکز تحقیقات درایران « اینترنتی از اشیاء» فناوری
The smart choice for demanding motor switching
Liebert DSE High efficiency thermal management

Presentation transcript:

Schneider Electric Pre Fabricated Modular Data Center Overview & Discussion

Schneider Electric is the Global Leader in Pre Fabricated Modular Solutions In January 2014 Schneider Electric acquired AST Modular the global leader in pre fabricated modular and containerized and modular Data Centers AST leads the pre-fabricated Modular Data Center Market (>20% market share) Over 600 Data Center projects successfully executed to date Projects deployed in over 50 countries First company to build a Tier 3 multi-Container Data Center Pioneered the manufacturing of high quality purpose built containerized data centers (2001) AST customers include IT leaders including IBM, HP, Dell, and Silicon Graphics

Schneider Has Deep Experience in Delivering Pre Fabricated Solutions

Product Options

Our Products Include a Wide Variety of Standard and Pre-fabricated IT Room Solutions SS Standard ISO MDC – Non-ISO SS Modular Rooms Smart Shelter 20’ & 40’ ISO -All in one containers -Multi container parks 25’ & 45’ NON ISO -All in one modules -Contiguous IT rooms Secure IT rooms -Indoor & Out Door -Secure and any size

3 Types of IT Modules for Different Applications AST IT Modules Compact ISO All-in-One (20ft Enclosure,7Racks, UPS, PDU, Overhead DX Cooling, Standard ISO All-in-One (40ft Enclosure, up to 19 racks, PDU, overhead DX cooling Ruggedized Solutions for Industrial (40ft Enclosure, up to 19 racks, PDU, overhead DX cooling, Ruggedized versions available Multi-Bay IT Modules (25ft – 40ft enclosure, Non-ISO design for more space. Cooling options - In-Row CW Perimeter CW, Air Economizer Cooling, DCIM) Modular Room (20 x 45ft Enclosure,24 Racks, PDU, 3 Perimeter CRACs CW cooling, DCIM)

Walk Through Our Demo Module Outside IT Module – Non ISO ”Wide Tall & Comfortable” Overview Non-ISO design is wider, taller, deeper than container and engineered to provide a spacious, functional workspace for IT personnel Efficient, scalable design allows for custom, multi-module configurations from 20 – 240 racks Multiple cooling solutions for chilled water, DX and air economization (In-row, Perimeter, End-of-Row) Robust frame design simplifies installation and ganging together Best option for a complete configurable space. Walk Through Our Demo Module Outside

Multi Module Designs IT Rooms are joined together to form an “open white space” IT room

Base Designs – IT Modules IT Room Modules 90kW All-in-One (40ft Enclosure,10 Racks, UPS, PDU, In-Row DX Cooling, DCIM) 110kW Single Module (40ft Enclosure, 10 racks, PDU, In-Row CW cooling, DCIM) 205kW Single Module (53ft Enclosure,14 racks, PDU, In-Row CW cooling, DCIM) 240kW Dual Module (20 x 45ft Enclosure 22 Racks, PDU, In-Row CW cooling, DCIM) (20 x 45ft Enclosure,24 Racks, PDU, 3 Perimeter CRACs CW cooling, DCIM)

90 kW All in One Pre Fabricated Data Center (Non ISO)

10 Rack 90 kW N+1 “All in One” Wide Body” Pre Fabricated Data Center

Staging Lobby and Electrical Room 415 Modular Power Distribution IT Module Detail 2 bay, 24 Rack In-Row, 240kW shown 24 NetShelter Racks Aisle Containment 240kW cooling capacity 415V distribution @11kW per rack (2N) Power monitoring, management and controls Fire detection and suppression Staging lobby for outside isolation Staging Lobby and Electrical Room 415 Modular Power Distribution In-Row Cooling Units

25’ 5 rack 30 kW N+1 “All in One”

20’ 3 rack 30 kW N+1 Data Comm Room

Smart Shelter™ Prefab Modular Room Example Phased Deployment View of (4)100 Rack IT Bays Phase 1 100 Racks Phase 3 Phase 2 100 Racks Phase 4 Gensets Chillers

Smart Shelter™ Secure Prefab Modular Rooms Expandable rooms are secure, water, dust & fire proof thermally insulated modular IT rooms. Rooms are built sized to any requirement. Installed Indoors or outdoor. Shelters can be disassembled & relocated. Rooms can expanded in a clean method. No construction construction dust or debris affecting expansion while operating. Visiting customers experience a “clean room” secure IT white space.

Echain cable management IT Module – ISO Shipping Container Schneider specific features Seismic Rack Mount Echain cable management Sliding Rail System 17

Base Designs - Power Modules 250kW 20ft Enclosure with UPS, Switchgear, cooling, DCIM 500kW 40ft Enclosure with UPS, Switchgear, cooling, DCIM 1.2 MW Skid mounted, UPS, Switchgear, DCIM Power Modules

Critical Output Switchboard Fire Suppression System Enclosed Power Modules Air Conditioners 500kW Module Symmetra N+1 UPS(250/500kW) 5 min Runtime Switchboard w/ integrated ATS Power monitoring, management and controls Environmental cooling Fire Suppression UL Listed Critical Output Switchboard 500kW Symmetra PX UPS The goal was a complete Schneider Electric solution. These key components would likely be the same or similar components, equipment and systems that you might fine in an electrical room supporting today’s data centre. Most of the equipment can be serviced from the front. UPS: The Symmetra PX system can provide 500kW of UPS conditioned power or configured as N+1 for greater redundancy. The UPS System provides 5 minutes of runtime. Cooling: The InRow coolers provide the necessary temperature and humidity control for installation outdoors or indoors. These precision cooling machines provide a 2N configuration for the module. SquareD Switchgear: QED switchboards have been properly sized to delver the primary power to your mechanical equipment along with the necessary input power for the Symmetra PX UPS system. A set of PLC controlled breakers is configured as part of the primary switchboard to allow normally open and normally closed transition between utility and generator. All breakers with the switchgear are metered. In addition, Powerlogic Scada with a 21 inch touch screen display allows for access to this critical information at the touch of a screen. The 500kVA transformer is downstream of the output switchboard and provides the option of 480V to 415V to the IT loads. Management: Lastly, the module ships with a complete fire detection and suppression system along with physical threat and environmental management ( Netbotz). All system and equipment data is aggregated to a modbus gateway and available through an Ethernet switch with a fiber port Fire Suppression System Primary Switchboard

Skid Mounted Power Module 1.2 MW Skid Shown Allows for quick deployment within an existing building that is scalable for larger data centers. N+1 UPS MW UPS 5 min Runtime Switchboard w/ integrated ATS Power monitoring, management and controls

Cooling Modules Cooling Modules 500kW Hydronics Modules (Support 3-250kW Chillers) 1000kW Hydronics Modules (Support 3-500kW Chillers) Chiller Skids & Enclosures Packaged Chiller, pump, and Tank with connecting piping 250kW – 1.2 MW Packaged Air Cooled Chillers - Options with and without free cooling Ecobreeze ISO frame 50kW increments up to 400kW of total cooling capacity (DCIM)

AST Cooling Offer – CW & DX (Pending UL Certification) AST added Capability Chilled Water Block Unit – CWB 100 kW Chilled water room cooling for prefabricated IT modules without raised floors Fits both ISO and Non-ISO prefab modules Designed to operate at higher water temperatures (15C) Top return with front supply air discharge Humidifier and electric reheat control options Hot Corridor Heat Exchanger– HCX 20 kW - 40 kW Overhead cooling for prefabricated ISO IT modules Chilled Water or Direct Expansion No floor space - located over the racks and hot aisle/corridor Maintenance all done from hot aisle/corridor Requires chilled water plant or remote condensing unit

AST Cooling Offer – Air Economizer Natural Free Cooling Unit – NFC 50 kW Indirect Free Cooling for small or constrained data center spaces Independent operating unit Heat Pipe heat exchanger isolating indoor and outdoor air Chilled Water, Direct Expansion, Humidity Control and Evaporative Cooling Options Flexibility to have external heat rejection for mechanical cooling as required - Chilled Water Plant or External Condensing Units Direct Free Cooling Unit – DFC 75 kW Direct Free Cooling for small or constrained data center spaces Uses air directly from outside for free cooling Chilled Water, Direct Expansion, Humidity Control and Evaporative Cooling Options Flexibility to have external heat rejection for mechanical cooling as required - Chilled Water Plant or External Condensing Units

Global References Education - Canada Utility - Australia Healthcare - Italy Military - Europe

Global References IT Software Company Government Customer – US Global Bank – Denmark Cloud Service Provider – Iceland

Mission-Critical Services Consulting and Planning – Assessment, analysis, strategic planning and O&M program development services. Design and Construction– Engineering, design-build and construction project management of facility expansions and new facility projects. Commissioning – Data center and LEED commissioning from project inception to integrating testing. Operations and Maintenance – Managed Services and on-site Critical Facility Management. Energy Management– Energy assessments, system optimization, and efficiency improvement projects. Alarm and Incident Management – 24x7 remote monitoring services through the Schneider International Operations Center (NOC). Schneider Electric offers a suite of service solutions for the entire lifecycle of the data center. Lifecycle Service Solutions

Design-Build Benefits 2/2012 12/2013 Schneider Design Build Outcomes Singular Accountability/Project Ownership Fully Integrated Project Delivery Speed to Market – Reduced Project Timelines Fewer Change Orders – Less Cost Overruns Continuous Project Budgeting and Scheduling Datacenter/Mission Critical Specific Team Skill Set Competitively Bid All Major Cost Items

Discussion, Questions and Answers Thank you Scott Fleming Pre Fabricated Data Center Specialist scott.fleming1@schneider-electric.com (925) 963 5468

IT Module – ISO Shipping Container Overview ISO shipping container is defined to 8ft wide and lengths of 10ft, 20ft, 40ft, and 53ft in U.S. Containers are designed to be strong, rugged, environmentally sound and easily transportable anywhere in the world 8ft width limits usable space for hot and cold aisles. Height is also limited Schneider has unique solutions for slide racks and flexible cable trays to allow full access to front and rear of racks to overcome space limitations Overhead cooling units (DX and CW) are available to maximize rack space

DX – Chilled Water – Direct Air – Indirect Air One-Size Does Not Fit All Power 200kW – 1.2MW IT Space 5 Racks – 200 Racks Cooling DX – Chilled Water – Direct Air – Indirect Air