FIRST PLYMOUTH CONGREGATIONAL CHURCH Final Report on the Capital Improvement Feasibility and Assessment Study 6/9/20131.

Slides:



Advertisements
Similar presentations
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Advertisements

Our Lady of Nazareth Will Celebrate Its 100 th Year Anniversary In th Year Committees Renovation Committee Celebration Committee.
Washtenaw County Office of The Sheriff Preliminary Proposal Jail Space Expansion.
Proposed Amendments for Palomar Airport Center dba Premier Jet Abbreviated Presentation Palomar Airport Advisory Committee June 15, 2006.
February 15, Master Plan for Facilities & Infrastructure Master Plan for Facilities and Infrastructure Whittier | Lenexa | Country Club Hills | Birmingham.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Dispositions: How Money Can Be Made in Real Estate Jim DerMinasian, CCIM, CPM® - Taurus Management Services, LLC - Senior Vice President.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
I-Web Documentation Part VI – Work Items FACILITY CONDITION SURVEY TEAM Steve Oravetz PE, R1 (Team Leader) Bruce Crockett, R1 Randy Warbington PE, R8 Jim.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
Proposed Amendments for Palomar Airport Center dba Premier Jet Special Workshop/Meeting Palomar Airport Advisory Committee June 14, 2006.
March 14, 2012 Office of Client Solutions 1800 F Street, NW Washington, DC Working together to meet your needs and make.
Construction Category Management Planning Version 1.1 (May 2015)
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Welcome Elizabeth Schanbacher Assistant Superintendent of Educational Technology.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
Manage the Facility Condition Index (FCI)
Managing the Facilities Asset Portfolio Prepared for the Tuition Policy Advisory Committee by The University of Texas Physical Plant September 10, 2003.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
Planning for a new Police Station: Overall Capital and Debt Issuance Long Range Plans October 23, 2006.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
Bainbridge Island School District 303 September 2015 MASTER PLAN.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
FEBRUARY 24, 2014 University Building and Grounds Committee Report.
FACILITIES ADVISORY COMMITTEE Facilities Advisory Committee Annual Report.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Welcome to Mandan City Hall Mandan Community Center Public Information Meeting August 19, 2009.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Comprehensive Asset Protection Each school district shall develop, implement, and maintain a comprehensive asset protection plan for every school building,
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Property Appraiser and Tax Collector Office Space Search Update Administrative Services Department February 25, 2014.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
2 THE BROKER’S ROLE IN SUSTAINABLE COMMERCIAL PROPERTY.
Facility Alternatives – How Do You Think They Impact Our Values? This exercise may give you some insight into the tradeoffs involved with each alternative.
Long-Term Program and Budget Planning Presentation to Session October 27,
SACRED SPACES UPDATE November 20, /20/111.
Green Real Estate: An Introduction Source: The Green Revolution by Jerry Yudelson.
New Market Skills Center Draft 10 Year Major Projects Capital Plan Administrative Council December 2, /02/20111.
Faculty Senate Presentation Classroom Modernization & Maintenance.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Civic Center/City Hall Public Information Meeting March 20, 2007.
ENERGY STAR Congregations and Portfolio Manager Program Review Jerry Lawson, National Manager ENERGY STAR Congregations Steve Bell (Contractor) Energy.
CONGREGATIONAL MEETING July14th, 2015 ORIGINAL OBJECTIVES OF THE PROJECT JORDAN TEAM 1)Investigate the unused portions of our land – either for ministry.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Campaign Story Periods of input and analysis Periods of action Periods of commitment Project Commitment Listening Phase Preparing Phase Financial Commitment.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Holy Conversations Dreams Committee Spring Background 2008 Long Range Plan Priorities The Sanctuary “Begin to explore a physical rearrangement of.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
AUCTION MARKETING PROPOSAL FOR: P ROPERTY N AME. EXECUTIVE SUMMARY OBJECTIVES To sell at Public Auction the property located at (describe assets) The.
Building Committee Update 5/21/17
Fort Stanwix National Monument Energy Audit Contract
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
UNION GROVE ELEMENTARY REFERENDUM
Energy Huntsville Opportunity Report March 2017
AUCTION MARKETING PROPOSAL FOR: Property Name
New Market Skills Center Draft 10 Year Major Projects Capital Plan
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
AUCTION MARKETING PROPOSAL FOR: Property Name
Presentation transcript:

FIRST PLYMOUTH CONGREGATIONAL CHURCH Final Report on the Capital Improvement Feasibility and Assessment Study 6/9/20131

This Report is Presented by the FPCC Building Committee The FPCC Building Committee Members 1.Clayton ColeBuilding Committee Chair 2.George AnastosSenior Minister 3.Rhonda WilliamsonDirector of Administration 4.Randy NicholasChurch Moderator 5.Denise BrownChurch Vice Moderator 6.Ken SawyerChair, Business Administration Team 7.Don ZellerMember, Business Administration Team 8.Noelle CochranMember, Church Council 9.John FalconettiMember Church Council, Choir Member 6/9/20132

Content 1.History 2.Review of the 2011 analysis of what it would take to move out of our present location 3.The Initial Recommendation of the Capital Plan Ad Hoc Committee (CPAHC) 4.Summary of the Fransen-Pittman Team Assessment 5.Vote on Remaining at our Present Location (Moderator) 6/9/20133

History The Capital Improvement Feasibility and Assessment study was initiated due to the need to comply with the following Executive Limitations (Asset Protection) Policy: The Senior Minister/Chief Mission Officer (SM/CMO) shall not allow church assets to be unprotected, inadequately maintained, or unnecessarily placed at risk. Accordingly, the SM/CMO shall not allow others to fail to follow a long-term maintenance and capital replacement plan for the church building, grounds, furniture, and equipment. (ELP 6.14) A committee called, the Capital Plan Ad Hoc Committee (CPAHC) was created and performed an assessment of First Plymouth Congregational Church’s indoor and outdoor facilities and put forth a recommendation to engage in a capital plan to address the issues identified in the assessment. The initial costs to address items in the assessment were estimated at $3.5 Million. The SM/CMO asked the CPAHC to consider as an alternative to fixing the existing facility, costs associated with the sale and relocation of our Church to a new location. Those costs are presented here as a review. 6/9/20134

Should We Move? (Examples of typical costs) The CPAHC requested and received a professional opinion of the current value of the Church property, the most likely selling price, as well as cost estimates to renovate an existing building or build from the ground up. This information was provided by Development Advisors to FPCC through a Broker’s Price Opinion (BPO) and information on Development Advisor’s web site. The property value opinion WAS NOT A REAL ESTATE APPRIASAL but a realistic opinion of the fair market value of the property based on recent church property sales,and the price our property will most likely yield should a decision to sell be agreed on. Development Advisors believes the FPCC property has the potential to sell for $85/SF to $92/SF which equates to $5.07 M to $5.49 M based on our building size of 59,696 SF. About Development Advisors Development Advisors, LLC is a Denver-based specialized real estate firm providing customized services for the specific client groups including churches, schools, and other specialized areas. Development Advisors operates in Colorado and the Western US. 6/9/20135

Should We Move? (continued) Assumptions About Price Estimation for Relocation It is assumed that the current mission of the Church will be maintained. For our current facility (59,696 SF) it is estimated that 90% of the building is used at any given time (includes Church activities, the learning center, as well as space leased to other organizations). This equates to a building foot print of 53,726 SF would be needed to continue the current mission and activities of our Church. Given that the same seating capacity will be maintained, the new location would also need to accommodate at a minimum one (1) parking space for each 2 seats (based on a 600-seat capacity sanctuary) on a site of 4.5 to 4.8 acres. 6/9/20136

Should We Move - Cost Summary 6/9/20137 Facility Size:53,726 SF (if moving) Land Area Required to Build:4.5 – 4.8 Acres Our Current Facility Selling Price:$5.07 M - $5.49 M Estimated Time to Sell:1.6 Years CostsRenovate / Repair Current Facility Renovate Existing Church Renovate Existing Commercial Building Ground-Up Development Minimum$500,000$4.298 M$7.52 M$14.24 M Maximum$3.5 M$11.82 M$12.89 M$15.85 M Update Current Pipe Organ N/A Move Pipe Organ N/A$260 K - $630 K Contract New Pipe Organ N/A$500 K - $800 K To get a total estimate, add costs for the pipe organ to the costs to relocate

Capital Plan Ad Hoc Committee (CPAHC) Capital Needs List Presented to the Congregation September /9/20138 In 2011, general estimates indicated a need for $3.5 million Critical Projects$ 305,000 Code Required upgrades$ 25,000 Preventative Maintenance$ 358,000 Fulfill Church Mission$1,249,000 Operational and Environmental savings$1,080,000 Aesthetic improvements$ 94,000 Non-critical improvements$ 115,000 Contingency$ 274,000 Total$3,500,000

Capital Improvement, Feasibility & Assessment Report 6/9/20139 Building Committee Formed – Extensive experience: Noelle Cochran, civil Engineer Don Zeller, FPCC Historian John Falconetti, Choir Member Ken Sawyer, Engineer, Project Manager Denise Brown and Randy Nicholas George Anastos and Rhonda Williamson Chip Cole, Chair Professional Consultants Selected Proposals received from 3 teams and interviews completed Fransen Pittman Construction Selected. Team includes: John Pittman and Alan Anderson, Fransen Pittman Construction David Cooper, The Genesis Group Architects, a Church specialization Dennis Rudko, Cator Ruma & Associates, Mechanical & Electrical Engineering Dana Hougland, Shem Milsom & Wilke, Acoustical Consultants Linda Morrison, Ambient Energy, Energy Conservation Consultant

Process 6/9/ The Fransen Pittman Team discussed and evaluated the Capital Needs List A thorough evaluation of the church was completed by all team members Meetings were organized over a 6-week period Focused reviews by the Building Committee and Staff were held on four major subjects: 1.HVAC Systems and Lighting Systems 2.Sanctuary Acoustics 3.Interior issues including deteriorating finishes and safety hazards 4.Exterior issues included sidewalks, lighting, and landscaping Information gathering included the Congregation through the Weave Our New Tomorrow Program

Fransen Pittman Feasibility and Assessment Report Organization 6/9/ Tier One – Urgently Required Maintenance Tier Two – General Maintenance and Alterations Bring all Building Systems up to a new 20-year life Strive to receive an Energy Star Rating of 90 Saves approximately 15% of present operating costs Tier Three – Options for bringing all Building Systems up to current state-of-the-art Energy Savings Technology Approximately a LEED Platinum Certification Best Practices toward a Net-Zero Green House Gas Emission Building Incorporates Weave our New Tomorrow input Saves approximately 40% of present operating costs

Summary of Feasibility Report – All three tiers 6/9/ Total of 99 line-items of work Gross Total of $5.7 million Some line-items are options to each other Net Total of $5.2 million Costs by General Category Costs related to the interior of the building$1.0 million Costs related to the exterior of the Building & Grounds$.9 million Costs related Mechanical and Electrical Systems$3.5 million Costs related to furniture, technology and sound systems$.3 million

Line Items Related to the Sanctuary or Chapel 6/9/ Chapel redesign to address flexible seating, darkness, & sound Correct, Repair and Improve Sanctuary Acoustics and Sound System Deficiencies Generally low reverberation times, especially in the low frequencies High degree of variation in sound quality in the low frequencies Poor acoustical performance on the carpeted chancel Poor sound reflection off of the back wall of the balcony Poor feedback of sound to choir and preachers Poor speech intelligibility, especially for the choir Provide accessibility to the chancel Insufficient space on the chancel and at the chancel steps Difficult lighting controls, high energy use, and poor lamp-changing capabilities Seating and configuration options

6/9/201314

6/9/201315

6/9/201316

6/9/201317

6/9/201318

6/9/201319

6/9/201320

6/9/201321

6/9/201322

6/9/201323

6/9/201324

Summer 2013 Work to be done 6/9/ Bid and construction Project One$308,000 Define Project Two in detail$2.5 million to $3.5 million Define Project Two Options$ 0.8 million to $1.5 million Options that reduce operating costs will receive higher priority Prepare for a September vote of the Congregation to proceed

Report from the First Plymouth Foundation and the Endowment Committee 6/9/ Working Together – meshing our processes and focus Addressing Church Needs Doing our Fiduciary Homework Creative Solutions

Voting to remain in our present location 6/9/ Given the expenses related to relocating to an existing facility and especially with building a new facility from the ground up, the CPAHC strongly recommends that we stay in our current location. Randy Nicholas, Church Moderator entertains the following motion: Based on research conducted by the CPAHC and independent professionals, the membership of the First Plymouth Congregational Church, UCC directs that Church leaders not consider relocating from the present location and facility in any further discussion of its long range plans and commit to operating and maintaining the current facility at 3501 S. Colorado Blvd.