Onward Referrals - Purpose Transmission of essential information about the patient, reason for referral and their journey so far. To enable receiving Board.

Slides:



Advertisements
Similar presentations
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Advertisements

Sexual Health Messaging Service (National Online HIV/STI Partner Notification) Presented by Dónal Heath – Project Manager, GMFA.
Next Throughout this demo, if nothing happens for a couple of seconds click ‘Next’ to continue … SCI Gateway Product Demonstration Updated next.
Enhanced SPARRA Predictive Model & SPARRA Patient Alerts Risk prediction and service development Kathleen McGuire – Long Term Conditions Manager Ehealth.
The Referral Is the Key 18 weeks Referral to Treatment standard Tracey Gillies National Clinical Lead for 18 weeks Service Redesign and Transformation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Early Childhood Transition Presenters: Kimberly Mitchell Ginger Sheppard Jessica Spataro NOVEMBER 2011.
A new approach: Extending the role of Pharmacy in Primary Care Workstream lead: Ramiz Bahnam.
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
18 Weeks Referral To Treatment Waiting Times Standard
Payment by Results for Specialist Alcohol Services Don Lavoie Alcohol Policy Team.
 Copyright 2001 Perot Systems Europe. All rights reserved Architecture Model Introduction Tim Taylor.
A new approach: Extending the role of Pharmacy in Primary Care Workstream lead: Ramiz Bahnam.
Proposal for a new UNECE regulation on recyclability of motor vehicles Informal Document GRPE Reply to the Comments of the Russian Federation Informal.
Welcome Juanma Ormazabal (entrepreneur) from Aceros Ormazabal company (steel)
Unit 11 Meetings. Overview  Meetings In Business  Types of Meeting  Attending Meetings  Notice and Agenda  Chairman’s Agenda  Minutes of Meeting.
Measuring progress towards delivery of the target Ken Nicholson, ISD.
Developed for GRHCC Charles Schmitt MD 3/11/2007 Taking Care of Business Managing Consults in RPMS-EHR For Sending Consults.
Bowel Screening Project Overview Rhys Blake Head of Business and Service Development.
Session 3 Using KSF outlines at gateway points. Outcomes of session 3 Explain how the NHS KSF is used at foundation and second gateway points Describe.
1 An evaluation of an eReferral Management & Triage System for MOS referrals HSD&R – 11/1022/15 Iain Pretty, Paul Coulthard, Joanna Goldthorpe, Lesley.
©Dr I M Bradley Doing the project and other things.
EReferral Programme Archie MacDonald Jenny Baird Martina Zelikova.
‘Town Planning’: can it help? Sue Roberts For the Diabetes Team.
Tweak of the Week. Supporting literacy & clarifying lesson objectives via the use of a Tagxedo.
1 Transition: Part C to Part B Infant & Toddler Connection of Virginia Spring/Summer 2007.
Cancer Outcomes and Services Dataset Linda Wintersgill Information & Audit Manager, NECN.
Page 1 | Proprietary and Copyrighted Information Safeguards Gary Hannaford, Task Force Chair IESBA Meeting New York, USA September 15, 2015.
Developing a NI Acute Oncology Service Round Table Discussions Liz Henderson Advisor to Macmillan Cancer Support.
Standing Committee on Improvement Implementation Anne Aikman-Scalese, SCI Chair | ICANN-52 | February 2015.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Setting the Scene: Progress Towards Delivery Mike Lyon Deputy Director of Delivery/Head of Access Support Team.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
‘Advice only’ clinic in Gynaecology Dr Gerry Beattie 20 th June 2013.
360Exchange (360X) Project Provider Directory Workgroup 08/10/2012.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
44222: Information Systems Development
24 October 2006 Industry Dialogue on xoserve services – Work Plan.
Status Reports ~ Good meeting communication. It is a good practice when coordinating work with others to keep frequent brief communication Everyone maintains.
18 Week Pathway Discussion about potential IM&T issues.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
Information Sharing for Integrated Care A 5 Step Blueprint.
Lies, Damned Lies & KPIs Part Deux Improving quality: Developing KPIs for Stage 0 & beyond 20 th September 2011 National Improvement Leads NHS Improvement.
Working group “Maritime Transport Statistics” Luxembourg, April 2008 Data related issues Item 8 of the agenda.
Lincolnshire Health and Care Update September 10 th Mr Gary Thompson.
NHS Health Check. NHS Information Centre for Health and social care  Mark McDaid – Project Manager  Martin Hepplestone – Business Analyst ( starts August.
LAW SOCIETY OF ZIMBABWE LABOUR LAW SEMINAR
InvITs- A New Investment Gateway for Infrastructure Growth in India Customer Care No
Introducing a new Working with the Pharmaceutical Industry Policy Phillipa Hobson-Ellyatt Health & Wellbeing Governance and Assurance Manager, Public Health,
ONS API Progress / Plans July 2010 Census Web Services Working Group.
Skills of the guiding staff
New project request process training
Choice – 6 Steps, 6 Actions, 6 Weeks
Information Sharing for Integrated care A 5 Step Blueprint
18weeks RTT measurement and data quality
Standards Development: An Overview
Writing a Series of Paragraphs Expressing an Opinion
Hybrid Beamforming Protocol Design Details
Extreme Mentoring 16th July 2018
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
Extending the role of Pharmacy in Primary Care
London Transforming Care – FTA Funding Proposal
Baseline – IEEE definition
Hybrid Beamforming Protocol Design Details
18 Weeks Measurement Workshop 23 November 2010
Scientific Panel Study Approval Process
HERUG Development requests Proposal
Feasibility Report.
NatSIP-CRIDE Feasibility Study
Presentation transcript:

Onward Referrals - Purpose Transmission of essential information about the patient, reason for referral and their journey so far. To enable receiving Board to put patient on right pathway and manage their journey (e.g. triage, vetting, booking, listing, next steps of journey and required timescales). To feed back essential information about the progress of the patient’s journey and its conclusion to enable the sending Board to report on 18 Week performance.

Work strands 1.Agreement of Minimum Dataset - especially essential ‘Pathway Status’ data items 2.Encourage use of existing SCI Gateway form to transmit Onward Referrals - potential tweaking of form following conclusion of 1 3.Feed-back Loop to Sending Board - definition of Data and process 4.Auto-population of onward referrals from PAS systems to SCI Gateway

SCI Gateway Requirements spec produced. Feasibility Project in progress. Need volunteers to draft ‘business level’ requirements for third party systems (Trak, ISOFT, Helix etc.) Needs approval of development project.

1. Agreement of Minimum Dataset See handout –Essential Pathway Status data items Options : 1.Agree on single 18 week measurement set to be used by all 2.Not agree – therefore potentially 14 x14 different combinations of who sends what to who!