1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.

Slides:



Advertisements
Similar presentations
Process and Product Quality Assurance (PPQA)
Advertisements

Quality Improvement Level Up Program December 17, 2008.
Transition from Q1- 8th to Q1- 9th edition
ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
Damian Gordon.  Static Testing is the testing of a component or system at a specification or implementation level without execution of the software.
ISO 9001: Countdown to 2015 Presented by Ellen Diggs Ellen Diggs Consulting February 11, 2015 It’s Not Just for Manufacturing Anymore!
Improving the R&D/Support Relationship Karen Herzog Vice President, Support Services McKesson SCP Showcase November 10-11, 2004.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Overview Lesson 10,11 - Software Quality Assurance
Purchasing Overview Purchasing Purchasing Activity
ASPEC Internal Auditor Training Version
Quality Representative Training Version
SUPPLIER PARTNERSHIP An organization (or customer) purchases its requirements, raw materials, components, and services, from supplier.   Better supplier’s.
How the Change Control Process Affects Project Quality
Welcome ISO9001:2000 Foundation Workshop.
Managing Project Quality
The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.
Degree and Graduation Seminar Project Management Processes
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Kimball Bullington, Ph.D. - MGMT Materials Management Systems Purchasing Chapter 7.
Setting up an Internal Audit Program By
INTRODUCTION TO AUDITING
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Project Life Cycle.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting July 20, 2004.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Introducing Project Management Update December 2011.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Click on Next to continue Next Introductio n Inputs Tools and Techniques Outputs The process of managing procurement relationships, monitoring contract.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
ТBМ-Logicon Logistic and Information Integration with Suppliers.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
ISO : 9000.
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
MS Invoice E-Invoice Solution Overview March 2016.
Process Auditing Why do people think that this is something new? Presented by Kevin Gilson, Orion Registrar, Inc. For the ASQ ISO Users Group October 8,
Mid-Year Performance Review Process University System of New Hampshire System Office | 5 Chenell Drive, Suite 301, Concord, NH
INTERNAL AUDITS A Management Tool
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Internal Audit Quality Assessment Guide
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
12.3 Control Procurements The process of managing procurement relationships, monitoring contract performance and making changes or corrections as needed.
SUPPLIER PARTNERSHIP An organization (or customer) purchases its requirements, raw materials, components, and services, from supplier.   Better supplier’s.
So where in ISO is Process?
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Overview – Guide to Developing Safety Improvement Plan
Supplier Improvement Program
Reliance Supplier Corrective Action Process
Overview – Guide to Developing Safety Improvement Plan
Supplier Improvement Program Update
Guidance notes for Project Manager
SUPPLIER PARTNERSHIP 2.
Supplier Improvement Program Update
Coordinate Operations Standard
Specialty Heat Treating, Inc. Internal Auditor Training
Chapter # 8 Quality Management Standards
Key Value Indicators (KVIs)
An Audit of the SYSTEM, Not the PEOPLE
Process Auditing Why do people think that this is something new?
Software Reviews.
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Purchasing Overview Purchasing Purchasing Activity
Presentation transcript:

1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010

2 Outline Team Origin Rules of Conduct Shared objectives Approach Data analysis Paperwork brainstorming Escalation plan –Phased approach –Description of phases Implementation timeline

3 Team Origin Originated out of PIA meeting inputs and discussions Evidence of systemic non compliance to PIA/MIL specifications –Increased scrutiny by Government during First Articles and First Production Lots –Increased testing at receiving inspection –Common issues across supply base Criticality of materials warrants focus and attention Ability to improve communication between primes and suppliers Desire of Primes to become more proactive and less reactive Suppliers execution critical to industry performance

4 Rules of Conduct Treat each other fairly and with dignity Keep our promises Encourage cooperative efforts across the team, with each member having an equal voice Work towards solutions that benefit both the group and your company Do not engage in any activity that might create a conflict of interest for our company or for ourselves individually Evaluations and discussion of supplier performance will be based upon factual data and audit findings

5 Shared Team Objectives Enhance the performance of the Parachute Industry supply base –Improve both paperwork and material compliance to the specifications Leverage our shared resources to address systemic or critical shared supplier issues Strengthen communication of supplier related issues across the Parachute Industry –Between Primes and between suppliers Identify issues proactively and work on preventive actions

6 Approach Meet regularly via teleconference Agree upon most significant supply chain issues facing the industry –Use data to guide decisions –Consider frequency, severity, and likelihood of detection Establish prioritization (pareto principle) Determine action plans for top one or two issues –Spread the actions across the team as much as possible Document meeting with minutes and actions

7 Data Analysis Reviewed each Prime’s rejections Consistently saw same defect type as #1 Became first focus of improvement initiative

8 BAE Inputs 80% of rejections for paperwork

9 Mills Manufacturing Inputs 42% of rejections for paperwork

10 Aerostar Inputs 65% of rejections for paperwork

11 Pioneer Inputs 70% of rejections for paperwork

12 Airborne Inputs 27% of rejections for paperwork

13 Paperwork Brainstorming Ideas Conducted brainstorming session as a team on how to improve paperwork issues Option 1 - Create consistent graduated escalation stages for defective paperwork lots Option 2 - Implement common checklists for each supplier to submit Option 3 - Create common shared ‘web’ application where data is entered by suppliers and accessed by primes and customer Team agreed on option 1 –Option 2 complex, requiring extensive coordination between all primes and suppliers, also introduces new formats and requirements to suppliers –Option 3 costly, complex and timely to implement as a solution does not exist in the software industry to date

14 Paperwork Improvement Phases Phase 1 Notification Phase 1 Notification Phase 2 Corrective Actions Phase 2 Corrective Actions Phase 3 Delivery Release Phase 3 Delivery Release Phase 4 Credit Withhold ($250) Phase 4 Credit Withhold ($250) Each defective lot leads to the next step… 1 st Defect 2 nd Defect 3 rd Defect 4 th Defect 5 consecutive acceptable lots Starting point

15 Paperwork Improvement Phase Details All direction to be given through prime’s purchasing departments –Formal notification will be an introduction letter sent by each prime –Additional clause will be added to current/new purchase orders –Will apply to all suppliers of each prime Escalation occurs at each prime independent of supplier activity at any other prime Progress of suppliers that move into phase 2 and beyond will be shared across all primes Removed from all phases once 5 consecutive lots are accepted with zero paperwork defects or 12 months (which ever comes first)

16 Phase Details Phase 1 – Notification of first paperwork offense –Opportunity to ensure common understanding of expectations –Obtain concurrence with supplier on paperwork nonconformance Phase 2 - Issuance of formal Corrective Action Request –Initiated upon second defective lot –Identical CAR form to be used by all primes, response requested in 14 days –Again confirm concurrence from supplier of paperwork nonconformance

17 Phase Details Phase 3 - Delivery release program –Initiated after 3 rd lot submitted with paperwork issues –Requires paperwork for each lot to be sent (electronically preferred) before shipment –Shipment of material does not occur until the paperwork is accepted by the prime –Primes agree to review and approve/reject with 72 hours should be factored into delivery schedules

18 Phase Details Phase 4 – Withhold cost of poor quality –Desire is to never get to this phase –Initiated after 4 th lot submitted with paperwork issues –$250 to be withheld on invoice for only the rejected lot –Conservative estimate of $250 based upon additional labor to document the issue, communicate with the supplier, obtain approval, second review of data, segregation of material and closure of the disposition activity Possibility exists for additional costs to be incurred as a result of the rejection and possibly passed along such as late shipment charges, OT required, line stoppage or difference in cost to procure replacement Objective = eliminate systemic paperwork issues!

19 Summary Joint prime manufacturers team created to improve systemic supply base issues Team using data to drive decisions Data identified Paperwork as largest supply chain issue by frequency Team jointly implementing Paperwork Improvement Program that has 4 phases SUPPLIER SUCCESS = INDUSTRY SUCCESS