Process Mapping & Value Stream Mapping 2009 Quality Training Karin Stricker UW-Stout.

Slides:



Advertisements
Similar presentations
Standard Work Making the “new way” become the standard way
Advertisements

CAUSE & EFFECT DIAGRAM (Fishbone or Ishikawa Diagram) Dr
Targets for the individual and the organisation By Rachel, Claire, Kirsten and Natalie.
Root Cause Analysis for Effective Incident Investigation Christy Wolter, CIH Principal Consultant Environmental and Occupational Risk Management (EORM.
Seven Quality Tools The Seven Tools
Chapter 1 - An Introduction to Computers and Problem Solving
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
Chapter 2 - Problem Solving
Software Engineering Introduction to UML.
Information System Engineering
Housestaff Lean Academy Module 3: Examining the Current State (Process Mapping, Observations, and Waste) Robert Martin, PsyD Performance Excellence UCLA.
Project Storyboard Template
Chapter 2- Visual Basic Schneider
UI Standards & Tools Khushroo Shaikh.
PTTE Lecture 3 Quality Organization & Management Ch 5 & 6
Chapter 6, Process-Flow Analysis
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
IMS Training on Management Standards ISO 9001, ISO 14001, and OHSAS Prepared by SL, 18/01/2011.
Root Cause Analysis: Why? Why? Why?
CONSTRUCTION OF A FLOW CHART DR OKUNOWO BOLANLE EDM UNIT.
Overview of DMAIC A Systematic Framework for Problem Solving
CONSTRUCTION OF A FLOW CHART DR OKUNOWO BOLANLE EDM UNIT.
Business Process Reengineering A how-to for understanding and improving your county’s business process NC WSS Leadership Summit – April 22-23,
Lean Six Sigma Kick-Off Meeting Template
The Software Development Cycle Defining and understanding the problem.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Chapter 8: Problem Solving
Managing the development and purchase of information systems (Part 1)
10/12/ Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 1. Interviews & questionnaires.
Value Stream Mapping Quick Start. 2Employ Improvement Initiatives A series of steps that must be performed in the proper sequence to create value for.
1 UML Basic Training. UML Basic training2 Agenda  Definitions: requirements, design  Basics of Unified Modeling Language 1.4  SysML.
[PROJECT] FINDINGS AND RECOMMENDATIONS FEBRUARY 28,2010.
CASE STUDY PRESENTATION FORMAT IT CAN BE SHARED WITH ALL. USE THIS FORMAT FOR GIVING CASE STUDY PRESENTATION AT LEAN KAIZEN MELA 2015 Put your Company.
C++ Programming Language Lecture 2 Problem Analysis and Solution Representation By Ghada Al-Mashaqbeh The Hashemite University Computer Engineering Department.
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Yellow Belt Training 10 Step Kaizen Process
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Traditional Economic Model of Quality of Conformance
Chapter 5 Value Stream Mapping. IT-465 Lean Manufacturing2 What is VSM? It is a method of creating a “one page picture” of all of the processes that occur.
Chapter 2- Visual Basic Schneider1 Chapter 2 Problem Solving.
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Lecture #1: Introduction to Algorithms and Problem Solving Dr. Hmood Al-Dossari King Saud University Department of Computer Science 6 February 2012.
How Computers Solve Problems Computers also use Algorithms to solve problems, and change data into information Computers can only perform one simple step.
Chapter 2- Visual Basic Schneider1 Chapter 2 Problem Solving.
Thinking Web > CONTENT DEVELOPMENT
Lab Standards + Documentation Committee
Chapter 11 TQM & Quality Tools.
Problem Solving Sheet Guidelines
Recall The Team Skills Analyzing the Problem (with 5 steps)
Systems Analysis and Design
2.0 Problem Solving PROGRAM DESIGN
Title: Owner: Ver: Date:
Information Systems in Organizations 2
Root Cause Analysis for Effective Incident Investigation
Lean Healthcare Deployment and Sustainability Ch
Use of handheld electronic devices for data collection in GeoStat
Root Cause Analysis: Why? Why? Why?
Data and Flowcharts Session
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Members: Keshava Shiva Sanjeeve Kareena
Data and Flowcharts Session
How to manage Requirements?
Data and Flowcharts Session
Statistic Project Checklist
Planning Services Meeting Client Communications
Presentation transcript:

Process Mapping & Value Stream Mapping 2009 Quality Training Karin Stricker UW-Stout

Description Introduction into Process Mapping and Value Stream Mapping: Discuss differences and applications of the two methods. Describe a successful approach of a process mapping project.

Learning Objectives Learn how to map a business process Identify weaknesses and problem areas of the process Learn about possible problem resolutions

Definitions Process Mapping is a hierarchical method for displaying processes that illustrates how a product or transaction is processed. is a visual representation of the work- flow either within a process - or an image of the whole operation. should allow people unfamiliar with the process to understand the interaction of causes during the work-flow. 4/20/2009

Example Cross-functional flow-chart (HR Lean Project)

Definitions (cont’d) Value stream mapping is a tool that helps you to see and understand the flow of material and information as a product or service makes its way through the value stream. is typically used in Lean. 4/20/2009

Example

Process Mapping vs. Value Stream Mapping Value Stream Mapping 1. gathers and displays a far broader range of information than a typical process map. 2. tends to be at a higher level (5-10 boxes) than many process maps. 3. tends to be used at a broader level, i.e. from receiving of raw material to delivery of finished goods. 4. tends to be used to identify where to focus future projects, subprojects, and/or kaizen events 4/20/2009

Processing Time vs. Lead Time Lead time: Period of time between the initiation and the completion of any process Processing time: Actual amount of time spent working on a product or service. Note: Lead time can easily be reduced by eliminating interfaces, whereas reducing processing time requires usually investments in better equipment and training.

Example: Gantt Chart Processing time and lead times of the HR Lean Project (every vertical line represents 1 day)

Process Mapping Project Conduct Workshops Cross-functional team Max. 1.5 hours Start with “GRCA” forms (see example) Create cross-functional Process Flow Chart(s) Identify number of interfaces Collect processing time and lead time Identify Number of Products/Services (m/d/hr) Helpful but not always required

Example: “GRCA” Form G oals General R esults Specific Forms A ctivities Specific step-by-step C onditions Specific requirements to start process

Process Mapping Project (cont’d) Analyze the process Reduce number of interfaces Identify obstacles Determine possible causes Ishikawa, Cause-and-Effect, Fishbone diagram (see example) Select and implement solutions Document the results Follow up

Typo / human error Start / End date wrong Typo / human error Don’t want to give it to the department Department didn’t ask Doesn’t know how to do it No field to sign Didn’t check their numbers Business mgr. or acct admin didn’t check it Ishikawa Diagram ES6 info wrong and/or incomplete Causes Solutions SSN wrong or missing FTE calc./ Acct. code wrong Salary base / calc. wrong Don’t have one (yet) Missed it on the form Doesn’t know how to do it Acct No hasn’t been assigned yet Human Error Just learned the grant has been approved Wrong min/max Salary Going off old information Rise information not available yet Making something up Start / End date wrong Create checklist Make sure form is filled in online before printed “Must” fields completed Detail sheet wrong

Success Factors 1. Management support 2. Willingness for change 3. Problem Solving Eliminate the cause of problems so they do not recur Yield for 80% and make changes as needed 4. Documentation Plain language, easy to read Easy accessible 5. Follow up Auditing Continuous improvement

Questions? Thank you for your attention!