Flow Charting MLC Grantee Meeting March 20, 2009.

Slides:



Advertisements
Similar presentations
Goal Setting Learning to Work Efficiently and Effectively.
Advertisements

Unit 252 Planning and monitoring work
Software Process Models
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Jim Butler QI Coach.  All improvements are a result of a change, But not all changes result in an improvement. Dr. Deming is purported to have said:
Planning & Scheduling Systems: From Design to Fabrication.
IE673Session 5 - Process Management1 Process Management.
1 Analyzing your Business Processes and Documenting Procedures Business Manager Curriculum February 2014 Facilitators: Greg Verret Phil Maher.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Assisted Living Enforcement Process Improvement Project Leading Age Assisted Living Enforcement Training October 18, 2013 Oklahoma State Department of.
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
Flow Charts A most-detailed study on flowcharting from the creators of the Fantastic Four webpage/wiki.
The Open Forum Leslie M. Beitsch September 17, 2009
SIPOC.
CONSTRUCTION OF A FLOW CHART DR OKUNOWO BOLANLE EDM UNIT.
Overview of DMAIC A Systematic Framework for Problem Solving
Continuous Quality Improvement (CQI)
CONSTRUCTION OF A FLOW CHART DR OKUNOWO BOLANLE EDM UNIT.
Scott D. Duncan, MD, MHA, FAAP. Science of Safety We cannot improve quality and safety of healthcare until we view the everyday delivery of healthcare.
Welcome ISO9001:2000 Foundation Workshop.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Business Process Reengineering A how-to for understanding and improving your county’s business process NC WSS Leadership Summit – April 22-23,
The Software Development Cycle Defining and understanding the problem.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
S/W Project Management
Define the problem to be solved. Measure the current performance. M.
Chapter 10 Contemporary Project Management Kloppenborg
Week 5: Business Processes and Process Modeling MIS 2101: Management Information Systems.
Simple Process Mapping Techniques
Coming Full Circle: AMI and Med Rec Across the Continuum Medication Reconciliation in Home Care Date: April 23 rd, 2007 Time: 10 – 11 am MDT Dial-in:
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
COMP 208/214/215/216 Lecture 3 Planning. Planning is the key to a successful project It is doubly important when multiple people are involved Plans are.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
Describing Process Specifications and Structured Decisions Systems Analysis and Design, 7e Kendall & Kendall 9 © 2008 Pearson Prentice Hall.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Implementing QI Projects Title I HIV Quality Management Program Case Management Providers Meeting May 26, 2005 Presented by Lynda A. O’Hanlon Title I HIV.
Chapter 16 Problem Solving and Decision Making. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
Eliminating Missed HPV Vaccination Opportunities: One Performance Improvement At A Time Toolkit Antonia Blinn Massachusetts League of Community Health.
SYSTEMS ANALYSIS AND DESIGN TOOLS DATA FLOW DIAGRAMS.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Process Mapping A W5 Approach T. Rollefstad QI Consultant Oct 14, 2003 A W5 Approach T. Rollefstad QI Consultant Oct 14, 2003.
Project Time Management
Proprietary, Do Not Copy or Electronically Reproduce. 1 City University PM 511 Improving Project Management Processes March 21,1998.
QI Tools to Diagnose HPV Vaccine Delivery Concerns in Your Practice
Traditional Economic Model of Quality of Conformance
Quality Improvement: Overview of Principles and Techniques
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Copyright © 2011 Pearson Education Process Specifications and Structured Decisions Systems Analysis and Design, 8e Kendall & Kendall Global Edition 9.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
Business Processes A business process describes a set of activities that are necessary to complete a response to a stimulus applied to an organization.
Process Maps Eng. R. L. Nkumbwa Copperbelt University 2010.
Project and Project Formulation and Management

Buffalo Trace District Health Department
Unified Modeling Language
Problem Solving Updated Jun 2016.
Systems Analysis and Design
Flow Charting MLC Grantee Meeting March 20, 2009
P ROJECT M ANAGEMENT Skills.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
What If Process is Your Problem?
Presentation transcript:

Flow Charting MLC Grantee Meeting March 20, 2009

… PHF Mission: Improving public health infrastructure and performance through innovative solutions and measurable results. Innovative Solutions. Measurable Results. Jack Moran Senior Quality Advisor T:

Continuous Improvement Plan Do Check/ Study Act The continuous improvement phase of a process is how you Make a change in direction. The change usually is because the process output is deteriorating Or customer needs have changed

Quick Check Of Your Enthusiasm Level & Mathematical Skills

“If you can't describe what you are doing as a process, you don't know what you're doing.” W. Edwards Deming

Flow Charting Flow charting is the first step we take in understanding a process Organized combination of shapes, lines, and text Flow charts provide a visual illustration, a picture of the steps the process undergoes to complete it's assigned task

Flow Charting From this visual picture we can see a process and the elements comprising it Shows how interactions occur Makes the invisible visible

We should write that spot down Flow Charting Is So Simple Even A Caveman Can Do It

Mapping MapQuest Takes directions and coverts them into a picture Shows various routes to a destination Shows communities you pass through to reach a destination Flow Chart Takes procedures and converts them into a visual Shows the routes inputs travel to become outputs Shows handoffs

Mapping MapQuest Shows connecting roads Shows faster and slower routes Provides alternative routes Flow Chart Shows connecting processes Highlights areas for improvement Triggers ideas to improve a process

Flow Chart Benefits Creates a common vision Establishes the “AS IS” baseline – Current State Baseline to measure improvements Identifies wasteful steps – activities/wait

Flow Chart Benefits Uncovers variations Shows where improvements could be made Show potential impacts of improvements Training tool

Types of Flow Charts As Is – current state - baseline Could Be – improved state – transition Should Be – optimal state

Flow Chart Exercises

Basic Flow Chart Symbols Activity: Operation/Inspection Decision Start/End Bookends Wait/Delay Flow Lines

Flow Charting Construction Clearly define the process boundaries to be studied Define the first and last steps – start and end points Get the right people in the room Decide on the level of detail – Complete the big picture first – macro view – Fill in the details – micro view

Flow Charting Construction Gather information of how the process flows: Experience Observation Conversation Interviews Research Clearly define each step in the process – Be accurate and honest

Flow Charting Steps Use the simplest symbols possible – Post-Its Make sure every loop has an escape There is usually only one output arrow out of a process box. Otherwise, it may require a decision diamond. Trial process flow – walk though it in real time

Flow Charting Steps Circulate the flowchart to other people involved in the process to get their comments Make changes if necessary Identify time lags and non-value-adding steps.

Flow Chart Construction There is no one right way to develop a flowchart, but the following guidelines provide a general structure: Start with a simple one-line description or title of the process being flowcharted, e.g., "How to..." Using a top-down hierarchy, start with an oval symbol named Start.

Flow Chart Construction Connect each successive action step in the logical sequence of events. Reference detailed information through annotations or connectors. Follow the process through to completion, denoted by an oval symbol named End

Flow Chart Construction Use common symbols Use a form of Post-It Notes – easier to rearrange Realize everyone is not doing it the same way – there will be disagreements It will take multiple passes to get to the “As Is” State

Flow Chart Symbols Activity: Operation/Inspection Decision Start/End Bookends Document Wait/Delay Storage Data Base Transport Input Output Flow Lines A Connector Forms Comment Collector Input/ Output Data Manual Operation Preparation Manual Input Display Unfamiliar/ Research

Olmsted County, MN – Performance Appraisal Process

Constructing a Flow Chart Asking questions is the key to flow charting a process. For this process: – Who is the customer(s)? – Who is the supplier(s) ? – What is the first thing that happens? – What is the next thing that happens? – Where does the input(s) to the process come from? – How does the input(s) get to the process? – Where does the output(s) of this operation go? – Is their anything else that must be done at this point?

SIPOC + CM A High level Process Map Helps in developing the “As Is” State Defines knowns from unknowns Shows gaps in QI Team’s knowledge of a process Focuses data gathering activities

High Level S I P O C+ CM Collection Form A Form to identify all relevant elements of a process before starting a flow chart – Suppliers - internal and external – Inputs – Process - activities – Outputs – service provided – Customers – internal and external – + Constraints – facing the system or process – + Measures - being used or to be used

Process/Activities: Begins With: Ends With: Inputs: Suppliers: Outputs : Customers: Constraints: S I P O C+CM Collection Form Project Title:____________________ Measures of Effectiveness :

Process/Activities: Begins With: Ends With: Inputs: Suppliers: Outputs : Customers: Constraints: Tidbit of valid, valuable info on PH Funding, Priorities, Time Feedback of information effectively received Measures of Effectiveness: $$, support, outcomes, leadership, acknowledgement, recognition, policy or behavior change Current methods and channels to disseminate public health information to elected officials Data, supporting documentation, policies and procedures, maps, health advisories, standards (filters for information), priority communications CDC, community partners, state, local hospitals, PHD functions Information, tangible mechanism of information format, data (who, what, when, where, why, how, etc), Policies and Procedures. Board of Advisors, residents, community, Mayor, community leaders S I P O C+ CM Collection Form Project Title: Effectively and efficiently disseminate information about public health needs and priorities to elected officials

Cautions In most processes: – Few people have seen the total process and fully understand the process – Departments are managed, processes are often unmanaged – Those that designed the process are no longer there – Work is being done that adds no value to customers – Work the customer needs isn’t being done – Rework is built into the process – Inefficiencies are built into the process – Workarounds have been developed that make the process appear to be working better than it really is

Flow Charting Forms Flow Process Chart Before and After Comparison Flow Chart Work Flow Analysis Form Others?

Before and After Comparison Flow Chart

Adding Time Lines As Is Flow Chart Could Be Flow ChartShould Be Flow Chart Time

Flow Chart Quality Improvement Analyze the “As Is” flow chart Look for Critical Processes Look for Handoffs Analyze with a Cause and Effect Diagram Develop potential solutions Develop the “Should Be” state Communicate all changes Track implementation progress Document results Present results

Analyzing A Flow Chart Examine each: – Activity symbol – value/cost? – Decision point – necessary/redundant? – Rework loop – time/cost? – Handoff – is it seamless? – Document or data point – useful? – Wait or delay symbol – why?/reduce/eliminate – Transport Symbol – time/cost/location? – Data Input Symbol – right format/timely? – Document/Form Symbol – needed/cost/value?

Improvement Opportunities What to look for on a Flow Chart: – Duplication of effort – Unnecessary Activities/Steps/Tasks – Delays/Waits – Transports – Storage – Illogical Sequencing of Activities – Unclear Lines of Responsibility – Opportunities for Error – Supplier Error Opportunities – Disconnects

Improvement Opportunities Use a Cause and Effect Diagram to investigate areas identified on the “As Is” flow chart as areas that could be improved Can complete a micro level flow chart on specific process steps as required Fix the low hanging fruit first – quick success Involve customer/suppliers before any changes are made

How Improvements Are Made Standardizing – all the same Automating – if possible – Timing? Eliminating – unnecessary steps/waste Combining/Rearranging – parts/steps Simplifying – reducing complexity Changing – people/place/sequence Reducing – storage/transports/rework

Continuous Improvement Plan Do Check/ Study Act The continuous improvement phase of a process is how you Make a change in direction. The change usually is because the process output is deteriorating Or customer needs have changed

Process Analysis Guide Detailed Flow Chart Identify Problem Areas Root Cause Analysis Pareto Critical Mass Recommended Opportunities

More Resources Online QI Training – access course through TRAIN by searching for course ID # Public Health Infrastructure Resource Center Public Health Memory Jogger II PHF QI Learning Series Catalog pdf Public Health Quality Improvement Handbook, Quality Press, American Society of Quality, Spring 2009

Gantt Chart MLC Grantee Meeting March 20, 2009

History The first Gantt Chart was developed by Karol Adamiecki, who called it a Harmonogram Because Adamiecki did not publish his chart until 1931, this famous chart bears Henry Gantt's name (1861–1919) designed his chart in 1910 Wikipedia, the free encyclopedia

Gantt Chart Henry L. Gantt – WWI – Franklin Arsenal 1910 – Progress Chart Work planned and accomplished are shown in the same space Emphasizes work movement through time Deals with plans and progress Helps identify and eliminate obstacles

Gantt Charts A Gantt chart is a matrix diagram The vertical axis lists all the tasks to be performed for a project Each row contains a single task identification The horizontal axis is headed by columns indicating estimated task duration in hours, days, weeks, months, etc.

Gantt Charts Some Examples

% Complete

Progress Bar

Milestone Chart - shows only important project events or milestones:

4/54/124/194/265/35/105/175/245/316/76/146/216/28 Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9

Gantt Chart – Morning Routine Tasks AM Time Ending Assign To: 66:106:206:30 6:40 6:50 7:00 Wake Up Make Coffee Shower Dress Leave You Coffee Maker You

Use Of Gantt Charts Establish order of tasks: – Sequential and Parallel Identify resources requirements Timing of resource needs Identify the critical path Monitor the project “On-Time” Schedule Alerts where remedial action is required

Benefits Of Gantt Charts Overview of all the tasks Identifies major milestones Easy to review with top management Guidance – suppose to be here now Alerts to problem areas Measurement of progress Summary document when project is finished Training tools for future projects

Some Examples

Traffic Light Gantt Chart Task: City of XYZ HD29-Feb7-Mar14-Mar21-Mar28-Mar Finalize assessment analysisX Gain consensus on prioritiesX Identify comm. with elected off.X Plan PHF consultant visitX Set agenda and travel scheduleX City HD/PHF PI meetingX On Schedule Watch Late or at Risk

2008 APHA Program

Integrating the Gantt Chart and the PDCA Cycle

Livingston County Department of Health – Accreditation Preparation Process