Positive Train Control Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010.

Slides:



Advertisements
Similar presentations
Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Advertisements

Positive Train Control Benefits
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
1Genesee & Wyoming Inc. A Short Line – DC Update AASHTO - SCORT Annual Meeting September 9, 2014 Jerry Vest, Senior Vice President, Government & Industry.
Gregory S. Winton, Esq. The Aviation Law Firm
Unified Carrier Registration (UCR) Update August 24, 2006.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Passenger Rail Risk Management Issues Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2013 APTA RISK MANAGEMENT SEMINAR Cincinnati, OH June.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Chapter 56 Workgroup Orientation Session The Road to Chapter 60 June 30, 2007.
Locomotive Horn Rule Regulations
Operational Issues for Rail Projects APTA Legal Affairs Seminar 2008 Janie Sheng K&L Gates LLP (202)
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Conductor Decertification Discipline
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
Karen Hedlund Director, Public-Private Partnerships 2015 Federal Rail Legislation.
Office of Research and Development | Office of Railroad Policy and Development Dr. John Tunna Director Office of Research & Development Office of Railroad.
1 Streamlined Sales Tax Governing Board. The Marketplace Fairness Act of 2015(MFA) Grants state and local jurisdictions the right to require the collection.
The Rail Safety Improvement Act of 2008 Issues For Rail Industry Contractors Kevin M. Sheys Partner K&L Gates LLP January 9, 2009.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
Will the U.S. Ever Pass TSCA Reform? Ken Zarker, Washington State Department of Ecology Northwest.
Electronic Train Management System and Safety Larry Milhon March 9, 2007.
1 FRA’s Grade Crossing Safety Program 2012 Southeastern Rail Highway Safety Conference Charlotte, NC.
April 2, 2013 Longitudinal Data system Governance: Status Report Alan Phillips Deputy Director, Fiscal Affairs, Budgeting and IT Illinois Board of Higher.
Standing Committee on Rail Transportation Oklahoma City September 22, 2009 High-Speed Passenger Rail Safety Strategy Grady Cothen Deputy Associate Administrator.
Taking Action Before or After a Rulemaking or Bill is Proposed Warren Hoemann Senior Vice President – Industry Affairs American Trucking Associations.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Policy Council and Program Planning. The Head Start Program Planning Cycle National Center on Program Management and Fiscal Operations (PMFO)
1 Frazer C. Hilder Attorney, Office of Chief Counsel Hazardous Materials Preemption Pipeline and Hazardous Materials Safety Administration U.S. Department.
State Corporation Commission The Virginia Constitution of 1902 created the Commission to regulate railroads and telephone and telegraph companies. Since.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Mid-States Highway-Rail Grade Crossing Safety Conference Guan Xu, P.E. Federal Highway Administration Office of Safety Design.
1 Supplemental Regulations to 34 CFR Part 300 Assistance to States for the Education of Children with Disabilities and Preschool Grants for Children with.
Regulatory Primer 101 Patrick Kennelly, Chief Food Safety Section California Department of Public Health March 11, 2014.
North American Free Trade Agreement Kirk Davenport (TX) Annual IFTA Business Meeting July 20-21, 2007 Chesterfield, MO.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
VI. Developing a VSMP Program General Stormwater Training Workshop.
4733 Bethesda Ave, Suite 600 Bethesda, MD (P) Developing Criteria for Project Programming.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Federal Transit Administration Office of Safety and Security TRANSIT BUS SAFETY AND SECURITY PROGRAM Mike Flanigon Federal Transit Administration U.S./
Safe Transport of Energy Products Rail Related Rulemaking Update
POSITIVE TRAIN CONTROL What it is, and what it does SCORT – September 2015.
HIPAA History March 3, HIPAA Ruling Health Insurance Portability Accountability Act Health Insurance Portability Accountability Act Passed by Congress.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
Federal Rulemaking Primer January 29, 2016 First Published: April 24, 2013 Producer: Alexander Perry Director: Afzal Bari.
Hazmat HM-246 Enhancing Railroad Tank Car Safety William S. Schoonover Chief, Hazardous Materials Division Federal Railroad Administration Presentation.
House Transportation Policy and Finance April 13, 2016 Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer.
6/12/2016 FRA – Office of Railroad Safety Moving America Forward F E D E R A L R A I L R O A D A D M I N I S T R A T I O N F RA Regulatory Activity Update.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
MBTA/MassDOT RAILROAD QUIET ZONES
Positive Train Control
North American Free Trade Agreement
Passenger Rail Risk Management Issues
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Freight Rail Policy Division
APTA Webinar with Congressional Rail Staff– Overview of the FAST Act
Status Update Jeff Gordon FRA
Federal Rulemaking Process for Significant Regulatory Actions
Positive Train Control
Electronic Logging Devices (ELD) American Beekeeping Federation
A Chronology Tribal Transportation Self Governance Program (TTSGP)
System Safety Regulation
System Safety Regulation
Presentation transcript:

Positive Train Control Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010

2 Overview PTC Implementation – IMPORTANT DATES: January 15, 2010 – Final Rule issued March 16, 2010 – Final Rule goes into effect April 16, 2010 – PTC Implementation Plan Deadline December 31, 2015 – PTC Implementation Deadline

3 Overview Rail Safety Improvement Act of 2008 (RSIA) Mandates comprehensive operational and physical improvements Broadens power of USDOT/Federal Railroad Administration (FRA) and Surface Transportation Board (STB) Rulemaking to implement legislation is well underway – legislation sets out strict timetables RSIA, Sec. 104: Positive Train Control (PTC) technology (49 U.S.C. § 20157)

4 Overview Impetus for legislation - Freight and passenger operations share track and corridors Precursors to current technology – 1920s–1960s Recent technical advances Recent incidents involving collision of passenger trains with freight trains or interference with track

5 RSIA, Sec. 104 (codified at 49 U.S.C. § 20157) Positive Train Control (PTC) is technology designed to prevent collisions and other incidents by automatically detecting and controlling the movement of trains Definition (49 U.S.C. § 20157(i)(3)): a system designed to prevent train-to-train collisions, over-speed derailments, incursions into established work zone limits, and the movement of a train through a switch left in the wrong position Implementing regulations at 49 C.F.R. Parts 229, 234, 235 and 236 General

6 HOW IT WORKS Key components: Equipment on locomotive cars detects position and relation to other objects Equipment at control center – broadcasts authority for train movements Wayside interface units Wireless data line between train and control center Illustration available at: tml

7 General When (49 U.S.C § 20157(a)(1); C.F.R. § (b)(1)): Progressively, according to PTCIP submitted by April 16, 2010 Complete implementation by December 31, 2015 Who (49 U.S.C § 20157(a)(1)): Class I freight carriers Each railroad providing or hosting regularly scheduled Intercity passenger service (Amtrak) Commuter passenger service

8 General Where: On each main line over which any quantity of poisonous by inhalation (PIH) material is transported (49 U.S.C. § 20157(a)(1)(B); 49 C.F.R. § (b)(i)) On each main line used for regularly provided intercity or commuter passenger service, subject to limited exceptions Main line definition: Freight: a segment or route of railroad tracks over which 5 million or more gross tons of railroad traffic is transported annually (RSIA Sec. 104(i)(2), codified at 49 U.S.C. § 20157(i)(2)) Passenger: all intercity and commuter passenger lines

9 General Main line track exceptions Only available to passenger intercity or commuter passenger railroads, or freight railroads conducting joint passenger and freight operation over the same segment of track (49 C.F.R. § 1019(a)) Specific segments of track may be designated as “not main line” (49 C.F.R. § 1019(a))

10 General Regulatory progress: DOT required to issue regulations governing PTC technology (49 U.S.C. § 20157(g)) Notice of proposed rulemaking (NPRM) - July 21, 2009 (74 Fed. Reg ) FRA public hearing on proposed rule - Aug. 13, 2009 Final rule - January 15, 2010 (75 Fed. Reg. 2598) – effective March 16, 2010 FRA seeks further comment on specific issues DOT must report to Congress by December 31, 2012 on progress of PTC implementation

11 General Immediate next steps: PTC Implementation Plan due to FRA no later than April 16, 2010 Must describe where and how railroad will install PTC systems Each railroad must – Define circumstances Describe risks Propose PTC elements

12 Technical Requirements Interoperability (49 U.S.C. § 20157(i)(1)) Address areas of greater risk prior to areas of lesser risk (49 U.S.C. § 20157(a)(2)) Once a railroad’s plan is approved, it must be phased in progressively (49 C.F.R. § (b)(1)) – not all at once, as close to Dec. 31, 2015 as possible Subparts A through G of 49 C.F.R. Part 236 continue to apply

13 Technical Requirements Each PTC system must reliably and functionally prevent: (49 C.F.R. § ) train-to-train collisions overspeed derailments incursions into established work zones Movement of a train through a main line switch in the improper position

14 Technical Requirements PTC system requirements, cont’d (49 C.F.R. § ) – system must: Include safety-critical integration of all authorities and indications of a wayside or cab signal system Provide an appropriate warning or enforcement in response to authority or hazard detection Limit the speed of passenger trains to 59 mph and freight trains to 49 mph in areas without broken rail detection or equivalent safeguards

15 Technical Requirements Submittals: PTC Implementation Plan (PTCIP) (49 C.F.R. § ) PTC Development Plan (PTCDP) and Type Approval (49 C.F.R. § ) - Components PTC Safety Plan (PTCSP) (49 C.F.R. § ) – Procedures PTCDP and PTCSP need not be submitted simultaneously with PTCIP FRA may require independent third-party verification and validation of product safety plan (49 C.F.R. § ; 49 C.F.R. § ) PTC applications – public docket (49 C.F.R. § (e))

16 Technical Requirements Host railroad (49 C.F.R. § (b) Safe State/fail safe (49 C.F.R. § (b))

17 PTC & Passenger Operations Requirements No new intercity or passenger rail service may commence after Dec. 31, 2015, until a PTC system has been certified, installed and made operative (49 C.F.R. § (b)(6))

18 PTC & Passenger Operations Requirements, cont’d. Joint submission of PTCIP (49 C.F.R. § (a)(3)) If host railroad is required to install and operate a PTC system on a segment of its track; and If tenant railroad that shares the same track segment would have been required to install a PTC system if the host railroad had not otherwise been required to do so Civil penalties may apply if freight and passenger operators fail to reach agreement on joint filing (49 C.F.R. Part 236, Appendix A)

19 PTC & Passenger Operations Main Line Track Exceptions 49 C.F.R. § File main line track exclusion addendum (MTEA) to railroad’s PTCIP Passenger terminal exception (49 C.F.R. § (b)) Limited operations exception (49 C.F.R. § (c)) FRA may grant exception where passenger and freight operations are temporally separated, among other criteria

20 Federal Preemption 49 C.F.R. § 236.0(i)(1) – Final rule preempts any state law, regulation, or order covering the same subject matter, except an additional or more stringent law, regulation or order that is necessary to eliminate or reduce an essentially local safety or security hazard; is not incompatible with a law, regulation or order of the United States Government and that does not impose an unreasonable burden on interstate commerce. 49 C.F.R. § 236.0(i)(2) – Final rule establishes a federal standard of care for railroad signal and train control systems

21 HSR & PTC Intersection with high-speed rail (HSR) requirements (49 C.F.R. § )): As of Dec. 31, 2015, the method of protecting HSR operations will be through the use of PTC. 49 CFR § 236.0(d)(2). Defines high-speed operations as those exceeding 80 mph. Specific requirements apply: Freight operation above 50 mph; passenger operation above 60 mph Freight or passenger operation above 90 mph Freight or passenger operation above 125 mph Freight or passenger operation above 150 mph Amtrak relief

22 Observations Effects of “the pressure of the time” Solicitation of further comments – no timetable announced FRA discretion

23 Implementation Costs FRA has estimated cost to freight railroads alone of implementing PTC at $2.3 – 5 billion Public policy decision (75 Fed. Reg. 2602) No funding for PTC proposed in either House or Senate version of transportation reauthorization. FRA has determined - no direct compliance costs on state and local governments (75 Fed. Reg. 2696) Class I view - cost of PTC is weighted disproportionately toward Class I carriers, with little impact on Class II and III railroads. (75 Fed. Reg. 2612)

24 Policy Collisions Freights – leverage Public agencies – no funding source for PTC-related improvements No Congressional proposal for funding Shared use of corridors by freight and passenger providers Implementation of HSR on shared corridors

25 Practical Considerations Shared use – presence of passenger service on joint use corridor will not absolutely trigger PTC Dispute resolution no mechanism in final rule – use STB non-binding mediation and plug result in at FRA?

26 QUESTIONS? Allison I. Fultz Charles A. Spitulnik Kaplan Kirsch & Rockwell LLP Washington, DC (202)