SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS 2008-2010 AND LONG-TERM PERSPECTIVES White Paper Robert Aymar.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Management’s preliminary comments to the ERC Report.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
State Budget Update Scott Cummings Virginia Department of Planning and Budget 1.
CERN: important events Restart of the LHC: –First beam on 20 November at 0.45 TeV –First collisions on 23 November, followed by slowly ramping up the beam.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Discussion. Help Needed for Splice Consolidation Opening and closing W (20 FTE’s) Repair, reinstall and tack PIM’s (2) Orbital machining of M sleeves.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
DIVISION OF REVENUE BILL VOTE 16: HIGHER EDUCATION AND TRAINING Presentation to Standing Committee on Appropriations 26 February 2010.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
The European Strategy Group (ESG) The remit of the ESG is to establish a proposal for an Update of the medium and long- term European Strategy for Particle.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
PS Days, January 2001 The “Plan” B.W.Allardyce The Medium Term Plan is presented at the June FC meeting by the Management and covers 4 years (I.e. in June.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
CERN Report (II) Rolf-Dieter Heuer ECFA Meeting Frascati 1 July
Medium Term Plan, with a Long Term Projection to 2010 L. Maiani. CERN Finance Committee June 19, 2002.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
COMPASS Meeting 2/07/2004 R. Garoby1 RECOMMENDATIONS OF THE HIP WORKING GROUP* *
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Computing Division FY03 Budget and budget outlook for FY04 + CDF International Finance Committee April 4, 2003 Vicky White Head, Computing Division.
Glion Colloquium / June Accelerating Science and Innovation R.-D. Heuer, CERN HL-LHC, Aix-les-Bains, 1 Oct ECFA HL-LHC Experiments Workshop.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
E.Elsen GDE Meeting, Beijing, Feb 2007 Perspectives and Planning for European LC R&D.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Key figures ,86 M€ Details ● 40 PhDs (8,64 M€) ● 13 Postdocs (2,73 M€) ● 1,77 M€ travel ● 0,99 M€ ‘per diem’ ● 2,74 M€ fees ATLAS:LHCb:ALICE=5:3:2.
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
Linac4 Project Meeting 1/ /01/ st priority 2  First priority: from the Linac4 project, the best wishes to you and your families for a 2010.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
PUBLIC FINANCE IN THE REPUBLIC OF MOLDOVA: REFORMS AND THE DEVELOPMENT STRATEGY PLENARY SESSION OF THE TREASURY COMMUNITY OF PRACTICE JUNE 1-3, 2015, KISHINEV,
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
Itzhak Tserruya Weizmann Institute of Science
CLIC work program and milestones
ICE SECTION The coolest place to be! Elias Métral
contribution to the round table discussion
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
The European Strategy for Particle Physics
Input to Strategy currently planned
Uppsala Commitment to ESS and FREIA Planning
Kickoff close-out Joerg Jaeckel, Mike Lamont, Claude Vallée.
CERN R&D plans and Infrastructures
Veksler and Baldin Laboratory
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
nuSTORM and the Physics Beyond Colliders workshop
CSP Meeting CERN CERN Accelerators in th November 2010
W. T. Weng Brookhaven National Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
European Economic and Social Committee
Scientific Policy Committee
Presentation transcript:

SCIENTIFIC ACTIVITIES AND BUDGET ESTIMATES FOR 2007 AND PROVISIONAL PROJECTIONS FOR THE YEARS AND LONG-TERM PERSPECTIVES White Paper Robert Aymar 16 Octobre 2006

June 2006 MTP The medium-term plan for the years 2006 to 2010 (CERN/SPC/872- CERN/FC/5052-CERN/2677) presented to the Council and its Committees in June 2006 was an update of the 2005 medium-term plan to take account of: the new LHC schedule and the impact of the revised Cost-to- Completion for the years 2006 and 2007; the decisions taken by the Council in 2005 concerning Member States’ contributions as from 2006 onwards; In June 2006 the Management announced that it would submit an updated 2006 MTP to take account of the outcome of the July Lisbon Council Session. This update is set out in the White Paper.

Financial position of the Organization (June 2006 MTP) Consequences of the 1996 decision on the LHC: –scheduled drastic reduction in manpower and budget resources up to 2010; –financial crisis of 2002; –rescheduling of LHC completion; –covering of the financial shortfall with a Budget deficit financed by EIB and short-term bank loans to be repaid up to 2011; –computing needs not identified or costed at the time of LHC approval; resources shortfall for LCG-2, to be found within existing Budget resources.

Consequences for Future Programmes 1. The reduction in financial and human resources linked to the 1996 LHC decision is NOT compatible with operation of the LHC PLUS a vigorous R&D programme. 2. The resources available up to 2010 are sufficient ONLY for “routine” operations of the LHC and other facilities and infrastructure. 3. They are INSUFFICIENT to implement the accelerator and detector R&D and LHC luminosity upgrade goals outlined in the Strategy Statement.

Components of June 2006 MTP Main scientific components of the June 2006 Medium-Term Plan (CERN/SPC/872-CERN/FC/5052-CERN/2677) are as follows: LHC programme –Construction of the LHC accelerator, transfer lines, CERN contribution to the LHC experiments and LHC Computing Grid Project (including EGEE); LHC operation: initial operation at 900 GeV in the centre of mass and first physics run in 2008 with acceleration of the beams to 7 TeV; Non-LHC programme –Conversion of LEAR into a high-intensity low-energy ion storage ring; –CLIC-CTF3 Facility; –EU Contracts: ESGARD; CARE; EUROTEV, DIRAC and EURISOL; –TT; –SPS: COMPASS (NA58); NA48/3; CLOUD; CNGS –PS : DIRAC (PS212) –Antiproton Decelerator (AD); –Isolde (REX); n-TOF –CAST.

The European Strategy for particle physics

First Theme Highest priority programme: completion of LHC machine and experiments and optimal operation at design energy over the years – –CERN contribution to completing four experiments, including the ECAL end caps of CMS (~ 24 MCHF); – –Enhancement of the capabilities of data analysis by more Research Physicists on LD contracts; P = 78 FTE; – –consolidation and improvements to enhance LHC luminosity short- term (towards /cm 2 s), which include: building the second phase - full performance collimators and the dilution kickers; M + P = 9 MCHF + 10 FTE; improvements in LHC beam controls: M + P = 19 MCHF + 50 FTE; basic infrastructure consolidation items: M + P = 27 MCHF + 70 FTE New power supply for the PS; M+P = 15 MCHF + 15 FTE. Multiturn extraction for PS; M + P = 9 MCHF + 23 FTE. Total M + P = 103 MCHF and 246 FTE.

Second Theme Second highest priority: renovation of entire injector complex to ensure reliability of LHC operation (2011): – –replacement of PS by a 50 GeV machine; – –replacement of Linac 2 and Booster with a new injector, Linac 4, and probably a superconducting proton linac (SPL). In the period up to 2011: – –design of future PS; P = 30 FTE – –and the SPL;P = 40 FTE – –construction of Linac 4.M + P = 55 MCHF and 115 FTE. Total M + P = 55 MCHF and 185 FTE.

Third Theme The Third Theme: LHC upgrade and accelerator and detector R&D Five components: 1. 1.R&D on high-field superconducting magnets, a pulsed field magnet for a possible superconducting version of PS and on superconducting quadrupoles for a neutrino facility. M + P = 22 MCHF and 80 FTE Study of the possible cryogenic upgrade for cooling the LHC IR (to be implemented after 2010) P = 20 FTE For increased LHC luminosity, 1.2 GHz and 160/240 MHz, RF improved capture systems in SPS and LHC; M + P: 10 MCHF and 55 FTE Development: tracking detectors and calorimeters (LHC and CLIC), microelectronics and opto-electronics. Improved triggering, DAQ and controls; M + P = 24 MCHF + 72 FTE Enhancement of CLIC qualifying programme with CTF3; M + P = 12 MCHF + 60 FTE. Total M + P = 68 MCHF FTE (excluding NbTi quadrupoles).

Fourth Theme (To be partly funded by CERN (tentative estimates) with external contributions.) The components of this Theme are: 1. 1.multipurpose SC cavity test facility; M + P = 10 MCHF + 20 FTE (?) 2. 2.R&D on high-power targets for neutrino production: M + P = 6 MCHF + 35 FTE (?) 3. 3.Electron cooler for the antiproton ring: M + P = 4 MCHF + 20 FTE (?) 4. 4.NA-48 experiment (Phase 3): M + P < 6 MCHF + 10 FTE (?) 5. 5.High Intensity and Energy Isolde project (HIE - Isolde): M + P = 15 MCHF + 60 FTE (?) Tentative estimate of overall CERN contribution: M + P = 41 MCHF FTE (?)

Conclusion Total M + P resources for the first three Themes = 226 MCHF and 718 FTE respectively. (216 MCHF and 643 FTEs with minimum third Theme). External contributions and planning flexibility over the period may decrease the amount of M + P resources needed by an assumed 10%, i.e. 190 MCHF and 570 FTE respectively. Planned staff reduction limited to 2250 FTEs in 2008 and the complement kept constant until Request for additional 240 MCHF (M + P = 190 MCHF and 50 MCHF or 400 FTEs) to be shared equally between the Host States through a special voluntary contribution and all the Member States. 170 FTEs to be found through further cuts in administrative and mechanical sectors. Management request for additional resources limited by realistic assumption of possibilities in Member States. Minimum needed to carry out Themes 1-3. Fourth Theme not financed within the proposed additional level of resources.

Table 4: Additional resources with respect to CERN/2677 required for new activities

Prospects for scientific activities over the period To be decided in in light of first physics results from LHC. This programme could comprise: 1. 1.An LHC luminosity increase requiring a new injector (SPL and PS). The total cost of the investment over 6 years ( : MCHF + a staff of per year. Total budget: ~ MCHF per year Preparation of a Technical Design for the CLIC programme after the LHC upgrade (decision in 2016). Total CERN M + P contribution = ~ 250 MCHF FTE over 6 years. The manpower needed for preparation of the CLIC Technical Design together with the LHC upgrade will require a modest increase in the annual budget of about 35 MCHF Enhanced infrastructure consolidation : 30 MCHF + 40 FTEs from 2011.

NB: Over the period , effective participation of CERN in another large programme (ILC or a neutrino factory) will not be possible within the expected resources if positive decisions taken on LHC upgrade and CLIC Technical Design. This situation could totally change if none of the above programmes is approved or if a new, more ambitious level of activities and support is envisaged in the European framework.

Table 5: Estimated Budget Balances (2006 prices, MCHF, without internal taxation)

Octobre 2006 Manpower Situation LHC decision Council decided to reduce CERN’s staff strength to about 2000 FTEs from 2005 onwards from a peak of some 3800 in the mid-seventies. 2. This plan was updated in December 2002 by the Human Resources Plan which allowed for an increase of manpower during the LHC construction period, compensated by a further staff reduction until Due to the absolute priority attributed to completing construction of the LHC machine, its detectors and the computing, the Management has continued to support the LHC construction with more manpower until Current staff numbers stand at 2650, the cost of which has to be compensated by a reduction in 2008 to Collaborating Laboratories provided about 100 project associates for about 18 months for completion of LHC machine

Octobre 2006 Figure 1: Personnel strength history

Octobre 2006 Staff number evolution In 2006 total staff complement (without Fellows and Associates) = 2594 members (1680 IC and 914 LD), excluding contracts financed by external contributions. Staff retirement rate assumption = around 100 per annum until 2010 (it will then reduce to about 50 per annum in 2012). A decrease to a complement of about 2000 in 2010 can be planned and managed appropriately by granting IC positions to LD contract holders according to requirements and by progressively reducing the total number of LD contracts. In short, the current Medium Term Plan (CERN/2677) does not make provision for sufficient manpower and material resources either to ensure fully reliable operation of the LHC and its infrastructure or to support R&D activities such as those aimed at proving the feasibility of CLIC and at preparing for a LHC luminosity upgrade by The Management is therefore requesting that the staff strength be increased in 2010 by some 250 FTEs, to be funded by the increased contributions by Member States proposed in the White Paper relating to the scientific activities and budget estimates.

Octobre 2006 Comprehensive Manpower Review Comprehensive bottom-up review of existing skills and competences and future requirements at Departmental level carried out. Fundamental criterion for definition of Manpower Policy: Once LHC project is completed, manpower policy at CERN must be driven by: –“routine” operation of CERN’s facilities, including the LHC machine detectors and computing; –full exploitation of the LHC’s potential; –R&D projects in line with the strategy proposals in the revised MTP (White Paper).

Octobre 2006 Results of Comprehensive Manpower Review 1. A staff of some 2000 FTEs in 2010 only makes it possible to run CERN’s facilities and to operate the LHC at a minimum level as “pure routine activities” (which they are not!) 2. A minimum of 250 additional FTEs will be required in 2010 above the planned 2000 for: –Reliable operation of the LHC and associated consolidation and maintenance operations will require a minimum of 100 FTEs in 2010 in addition to the level funded in the existing Medium-Term Plan; – technology development and focused R&D to allow for preparation of the LHC upgrade will require additional manpower of approximately 150 FTEs in A gradual decrease from the present staff complement of 2650 to 2250 (instead of ~2000) in 2010.

Octobre 2006 Table 1 Situation in 2006 by function including expertise, for reference

Octobre 2006 Figure 4: Existing commitments with respect to available funding

Octobre 2006 Figure 5: All staff categories forecast

Octobre 2006 Conclusion Overall additional manpower requirement for Themes 1 to 3 = 570 FTEs; The Management is requesting 240 MCHF in additional resources (M + P = 190 MCHF + 50 MCHF) over the years ; Increase FTEs integrated over three-year period 2008 to 2010 by 400 with respect to June 2006 MTP; Gradual reduction in the staff complement from 2650 in 2006 to 2250 (instead of some 2000) and then remain constant until 2010; 170 additional FTEs to be obtained by further reductions in the administrative and mechanical sectors. Additional 400 FTEs integrated over the years 2008 to 2010 with respect to the level funded in the current Medium-Term Plan is the minimum necessary to fully exploit the LHC and to allow for focused R&D