Formulate Alternatives. Accomplishments n Put together a team n Established a shared vision of the status quo n Identified problems n Defined planning.

Slides:



Advertisements
Similar presentations
1. Creativity and Innovation 2. Communication and Collaboration
Advertisements

POLICY AND STRATEGY DEVELOPMENT THROUGH BRAIN STORMING AND IDEAS BANK TECHNIQUE Prof. Dr. S. Shabih-ul- Hassan Zaidi Dean, Faculty of Architecture and.
Implement the Plan. Implementation n Implementation bridges plan development and operations n Implementation is the cornerstone of plan success Need for.
Identify Problems, Planning Objectives and Constraints.
Mahmut Ali GÖKÇEIndustrial Systems Engineering Lecture 2 System Identification ISE102 Spring 2007.
Systems Analysis and Design Feasibility Study. Introduction The Feasibility Study is the preliminary study that determines whether a proposed systems.
© 2005 Prentice Hall6-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Defining the Status Quo. Definition of Status Quo The “Status Quo” describes existing or anticipated conditions of a water resources system if policies,
Innovation Leadership Training Day Four Idea Capture and Collaboration February 20, 2009 All materials © NetCentrics 2008 unless otherwise noted.
Working in Groups Human Relations. What is a Group?  A unit of two or more people.  Members interacting and coordinating their work.  Members accomplishing.
1 CCLI Proposal Writing Strategies Tim Fossum Program Director Division of Undergraduate Education National Science Foundation Vermont.
Identify Problems, Planning Objectives and Constraints
1 Introduction to System Engineering G. Nacouzi ME 155B.
Putting It all Together Facilitating Learning and Project Groups.
Systems Engineering Management
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Introduction to Computer Technology
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
What is Business Analysis Planning & Monitoring?
Role and Components of Project Evaluation
McGraw-Hill/Irwin 2010 Modified by Jackie Kroening 2011 CREATIVITY AND HUMAN RELATIONS Chapter 12.
Planning and Decision Aids Chapter 9. Learning Objectives Explain knowledge management and how it creates value for organizations. Describe the basic.
Chapter 10 Contemporary Project Management Kloppenborg
Management & Development of Complex Projects Course Code - 706
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
IW:LEARN TDA/SAP Training Course
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Communication & Collaboration Communicate Clearly  Articulate thoughts and ideas effectively using oral, written and nonverbal communication skills in.
Copyright © Houghton Mifflin Company. All rights reserved. 8-1 Chapter 8 Decision Making and Creative Problem Solving.
Chapter 6 Team Work Blueprint By Lec.Hadeel Qasaimeh.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Sometimes you need a “Whack” on the side of the head Daniel T, Barkowitz Director, Student Financial Aid MIT.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Problem Solving.
©2001 Southern Illinois University, Edwardsville All rights reserved. Today Tuesday CS 321 Human-Computer Interaction Paper Prototyping Video: Paper Prototyping.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Source : The Problem Learning and innovation skills increasingly are being recognized as the skills that separate students who are.
Work Team Mobilization Methodology No. M3 August, 2000.
MODEL-BASED SOFTWARE ARCHITECTURES.  Models of software are used in an increasing number of projects to handle the complexity of application domains.
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
Information Technology Project Management Managing IT Project Risk.
Gül Begüm ŞEMİS. Milestones Appointments Due dates Check lists Approval The FOAK Process Phase I2 Project Process.
Software Project Management Iterative Model & Spiral Model.
Marketing Research An introduction. Marketing Research Marketing research is a combination of two words i.e marketing and research Marketing is essentially.
Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Designing New Programs Design & Chronological Perspectives (Presentation of Berk & Rossi’s Thinking About Program Evaluation, Sage Press, 1990)
An Agile Requirements Approach 1. Step 1: Get Organized  Meet with your team and agree on the basic software processes you will employ.  Decide how.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Lecture 2. An Overview of Engineering Design JANUARY 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
The Engineering Design Process
Info-Tech Research Group1 Info-Tech Research Group, Inc. is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
DEVELOPING CREATIVITY (OPPORTUNITIES AND IDEAS) Entrepreneurship 30.
Management Skills. What is Management???? The process of achieving company goals by effective use of resources; involves Planning, Organizing, and Controlling.
Rob Connatser NSS Instrument Work Packages and XLPM.
 In Ned law are a company that provides strategic consulting and management, composed of a team of high academic and social esteem, focused on optimization,
National Educational Technology Standards For Students.
PRODUCT DEVELOPMENT PROCESS By PERUMALSAMY M
21st Century Skills in the Classroom
Principles of Information Systems Eighth Edition
Building the foundations for innovation
Simulation - Introduction
4.2 Identify intervention outputs
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
A Whack On the Side Of The Head
Presentation transcript:

Formulate Alternatives

Accomplishments n Put together a team n Established a shared vision of the status quo n Identified problems n Defined planning objectives n Defined measures of performance n Delineated constraints

Next We Formulate Alternatives to the Status Quo

Alternative Formulation is an Iterative Process Alternative Formulation Brain Storming Planning Objectives Performance Measures Screening Resisting Point Designs Gaining New Perspectives Considering the Improbable Relaxing Constraints Alternative: A combination of measures that change the way water is managed.

The Balancing Act of Alternative Formulation Many AlternativesFew Alternatives Selection Process Time Cost

Typical Alternatives to the Status Quo Potential Alternatives - SupplyStrategicTactical Increased Reservoir Capacity New Source Construction Basin Interties Reallocation of Supplies Emergency Pumping

Potential Alternatives - Operational Strategies StrategicTactical Conjunctive Use Strategies Reservoir Operating Strategy Changes Water Reuse Changes In Triggering Mechanisms Water Quality Management Strategies Typical Alternatives to the Status Quo

Potential Alternatives - Demand Modification StrategicTactical Water Use Curtailments Public Information Campaigns Water Pricing Conservation Retrofits Conservation Credits Typical Alternatives to the Status Quo

Potential Alternatives - RegulatoryStrategicTactical Instream Flow Requirements Water Quality Regulations Water Rights Transfers Water Banking Water Marketing Typical Alternatives to the Status Quo

Alternative Formulation is a “Systems Process” That Proceeds From the General to the Detailed n Alternatives should initially be presented as general concepts n Estimates of impacts on planning objectives should be made n Infeasible alternatives should be discarded n Inferior alternatives should be identified n Promising alternatives should be analyzed in greater detail

Alternative Formulation Requires n Creative thinking n Collaborative effort n Compromise n Vision What is the best alternative you have developed to a difficult problem?

What is Brainstorming? An effective process for initial generation of alternatives n Encourages participants to freely offer suggestions n Forbids premature criticism and analysis n Requires participation of experts, managers and stakeholders n Improves response via collective thought n Forces the examination of a wide variety of ideas n Helps assure that no options are overlooked

Shared Vision Models are Valuable Tools in Alternative Formulation n Performance measures allow managers and stakeholders to envision the impacts of proposed actions n Simple representations of alternatives can be developed to determine general trade-offs and evaluate system behavior

Shared Vision Models are Valuable Tools in Alternative Formulation n More detailed models can be used to perform detailed analysis at the design level n Model use enhances understanding of system sensitivities and promotes conceptualization of new alternatives n Alternatives can be fine-tuned through sensitivity analysis

Generating Alternatives Requires Creativity* n An attitude that allows you to search for ideas and manipulate your knowledge and experience n Trying various approaches n Using impractical (* von Oech 1990)

Obstacles to Creative Thinking Whack’s Ten Mental Locks 1. “THE” right answer6. That is not my area 2. That is not logical7. Avoid ambiguity 3. Follow the rules8. Don’t be foolish 4. Be practical9. To err is wrong 5. Play is frivolous 10. I’m not creative

Adopt an Appropriate Attitude n Make a commitment to generate multiple strategies n Adopt a questioning attitude n Don’t be afraid to fail

Create the Proper Environment n Advocate collaborative thought n Eliminate distractions n Provide support to bring ideas into action

Take Action n Solicit input from different perspectives n Ask “What If?” n Examine the value of existing constraints n Delay criticism

Alternative Evaluation and Refinement The Formulation Process: n Fine-tunes alternatives n Defines components completely n Uses different evaluation criteria in different stages

A Phased Assessment of Impacts Preliminary Screening Criteria n Completeness: all the required plan elements are specified n Acceptability: decision criteria and planning constraints are satisfied

A Phased Assessment of Impacts Intermediate Screening Criteria n Effectiveness: planning objectives are addressed Detailed Assessment n Efficiency: a high ratio of plan outputs to plan inputs

Activities in Detailed Evaluation n Risk assessment n Economic analysis (NED, RED, Incremental Cost) n EQ and OSE account quantification

Activities in Alternative Refinement Alternative Refinement is a process of: n Specification - defining the details n Optimization - enhanced by the understanding of system sensitivity

Summary n Alternative formulation is an iterative cycle of generating, screening, and refining alternatives that proceeds at increasing levels of detail. n Creative thinking promotes the identification of effective and innovative solutions to planning problems. n Planning Objectives, Metrics and Accounts are used to assess the completeness, acceptability, effectiveness, and efficiency of a proposed plan.

Exercise