Comments on the Quality Assurance Standard EN14181 VGB Working Group Emissions Monitoring.

Slides:



Advertisements
Similar presentations
. Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012 Materiality in the CDM Experiences.
Advertisements

Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
Harmonization of Parts 60 and 75
 Is extremely important  Need to use specific methods to identify and define target behavior  Also need to identify relevant factors that may inform.
In-house Air Monitoring at IPPC Facilities – An Operator’s Perspective Simon Barry (Manager, Thermal Performance) John Gilmartin (Lead Technologist) ESB.
Working Paper No. WLTP-09-07e 1 Agenda item 5: Progress report on Downscaling / Gearshifting (OIL #4-9) by H. Steven th WLTP IG meeting, 14.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
NADP Individual Accreditation Scheme Conference June 2010.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
30. Conference of Directors of EU Paying Agencies Workshop1: The possibilities for optimizing the processes of implementation of direct payments Agency.
Common Problems in Writing Statistical Plan of Clinical Trial Protocol Liying XU CCTER CUHK.
Determination of System Equivalency – TaskForce Audi, EA-52, V4.0 WLTP-10-33e.
How Science Works Glossary AS Level. Accuracy An accurate measurement is one which is close to the true value.
Uncertainty analysis is a vital part of any experimental program or measurement system design. Common sources of experimental uncertainty were defined.
ISO 9000 Certification ISO 9001 and ISO
Policy D 5.0 Grades Phase I: Policy changes apply only to academic year Phase II: Full review of D5 to be completed for semesters.
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
CEN workshop EN 14181, May 2006, Paris 1 Inquiry of implementation and experiences with EN in Belgium Raf De Fré, Ive Vanderreydt - VITO, Mol.
Introduction to ISO New and modified requirements.
1 Software Process Lecture Outline Nature of software projects Engineering approaches Software process A process step Characteristics of a good.
PUBLIC HEARING FOR THE PROPOSED Notice To Lessee/Operators of Onshore Federal Oil and Gas Leases Within the Jurisdiction of the Wyoming State Office (NTL.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
Designing a Random Assignment Social Experiment In the U.K.; The Employment Retention and Advancement Demonstration (ERA)
Developing Monitoring Programs to Detect NPS Load Reductions.
EU-MRG Stakeholder Day Technical Session III: Cement and Lime May Jochen Harnisch, Ecofys
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
Quality Control – Part II Tim Hanley EPA Office of Air Quality Planning and Standards.
Laboratory QA/QC An Overview.
Level (3.1) - Carry out an extended practical investigation involving quantitative analysis (Version 2) Exemplars of Student Work.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
Measurement Systems Analysis Introduce Measurement Systems Assess Measurement Systems Performance Understand Measurement System Variation.
Laboratory Certification Update Part 2 Common Findings KWWOA Louisville April 15, 2015 Presented by Frank Hall, Laboratory Certification Coordinator.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Assessment of options to streamline legislation on industrial emissions IPPC Review Stakeholder Hearing 4 May 2007 Caspar Corden Entec UK Limited.
The role of modelling and FAIRMODE in the Directive review WG1 activity/discussion Bruce Rolstad Denby FAIRMODE 4 th Plenary, Norrkjoping Sweden June 2011.
META-ANALYSIS, RESEARCH SYNTHESES AND SYSTEMATIC REVIEWS © LOUIS COHEN, LAWRENCE MANION & KEITH MORRISON.
12 May Cologne-CL 1 EU – ETS CO 2 Monitoring Stakeholders day MONITORING AND REPORTING GUIDELINES By Ir. Claude Loréa, CEMBUREAU Technical Director.
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
LEADS/EMS DATA VALIDATION IPS MeteoStar December 11, 2006 WHAT IS VALIDATION? From The Dictionary: 1a. To Make Legally Valid 1b. To Grant Official.
Method 203 Quality Assurance/Quality Control Requirements for Continuous Opacity Monitoring Systems (COMS)
Temporary Assistance for Needy Families Part 265: Data Collection and Reporting.
LECTURE 13 QUALITY ASSURANCE METHOD VALIDATION
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
John Batty DEFRA UK Bratislava November Legal Background For any given surface water body, applying the MAC-EQS means that the measured concentration.
L Click to edit Master text styles l Second level l Third level l Fourth level l Fifth level Combustion Installations Stakeholder Day on the EU-Monitoring.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Establishing by the laboratory of the functional requirements for uncertainty of measurements of each examination procedure Ioannis Sitaras.
The VVSG 2005 Revision Overview EAC Standards Board Meeting February 26-27, 2009 John P. Wack NIST Voting Program National Institute.
1 Triggers for OBDII I/M Programs Rob Klausmeier dKC.
Flue gas flow rate measurement for verifying continuous monitoring at power stations according to EN ISO September /09/2016Flue gas flow.
MJAC Founded 1928 December 2016
Sample Size Determination
PUBLIC HEARING FOR THE PROPOSED
USING NATIONAL GUIDELINES FOR SCREENING, TREATMENT, AND FOLLOW-UP
Monitoring aspects of permits and inspections (1)
By John Wilson Accreditation and Metrology Services (Pty) LTD.
EU – ETS CO2 Monitoring Stakeholders day
2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE.
Improvement of Family definitions
Comparison of different gearshift prescriptions
Proposal for a mid vehicle concept
Common Problems in Writing Statistical Plan of Clinical Trial Protocol
Training Module Presented by Steve Wright
The Quality Control Function
Assessment of quality of standards
EN ISO September 2016 Confidential Restricted Public Internal
Presentation transcript:

Comments on the Quality Assurance Standard EN14181 VGB Working Group Emissions Monitoring

VGB Working Group Emissions Monitoring  The following organisations are represented on the working group: –VGB PowerTech (DE) - Chair –KEMA (NL) –EDF (FR) –ESB (IRL) –Laborelec (BE) –E.ON (UK) –Helsingin Energia (FI) –E.ON (DE)

AMS Quality Assurance – the EN14181 model Source: Gould, R., QA of AMS, MCERTS Conference, Bretby, 2003

EN14181 – Operator’s Responsibilities  Installation of compliant equipment (QAL1, EN14956)  Initial and periodic calibration of equipment (QAL2)  Annual verification of calibration (AST)  Ongoing zero and span checks (QAL3)  Retention of records on file  Checking measured values are within cal. range (weekly)

EN14181 – Industry Response  Welcome structure, clarity and consistency provided by new standard.  Significant extra costs to industry  Concerns relate to certain aspects considered to be –inappropriate or impractical to implement, or –impose excessive cost or burden on operator  Request early revision to standard to address these areas of concern

Areas of Concern (Summary) 1.Requirement for complex uncertainty analysis 2. Low load factor plant 3. Cert range 4. Cal function 5. Peripherals 6. Determining control limits 7. Easy to trigger QAL2 (expensive!)

Areas of concern (1) – QAL1  Impractical to do a full uncertainty analysis for each analyser: –Statistical approach too complicated –Lack of available data for older sites –Uncertainty analysis excludes measurement location –Confusion regarding which performance parameters should be included.

VGB Proposal (1)  VGB supports a simplified approach whereby instrument certified range must be <2.5 x ELV, per type certification in field trials  This substitutes performance testing, under the recognised certification schemes, for uncertainty analysis  Outcome similar to existing requirement  Already applies in some member states

Areas of Concern (2) – QAL2  Low load factor plant should not be required to operate to prove the AMS  Similarly for a second fuel or configuration used for a small proportion of the time  Where emissions concentrations are very low, QAL2 using SRM yields “random” cal functions (but may pass variability test!)

Example: low measured concentrations Source: N Faniel, Laborelec

VGB Proposal (2)  VGB supports a flexible interpretation for cases of low load factor plant or very low emissions levels, including: –Exemption of plant operating <1250 hours per annum –Exclusion of calibration time from reported unavailability –Calibration using reference materials where SRM not appropriate

Areas of Concern (3) – Calibration Range  Valid calibration range limited to 10% above max measured concentration (ŷ s,max + 10%)  Limit is too narrow; creates perverse incentive to maximise emissions during test (e.g., deliberate burning of highest sulphur fuel)  Inappropriate to apply this limit to hourly average measurements, will repeatedly trigger costly QAL2

VGB Proposal (3)  VGB supports the extension of the valid calibrated range to 2.5 x ELV in accordance with the linearity test –This is consistent with the instrument range advised in the standard –Would allow plant to be operated normally during the tests –Calibration of plant with low emissions (<30% ELV) should be based on reference materials

Areas of Concern (4) – Calibration Function  Where measured data is clustered at high levels, poor quality calibration function may result. Inclusion of zero values would add information  High measured values lead to difficulties in passing the variability criterion, even where R 2 correlation is close to 1.  Conversely, with low measured values, variability test may validate poor cal function

Example: High measured concentrations Source: N Faniel, Laborelec Calibration functions: SO2 y = 0,75x + 89,10 y = 0,89x + 42, AMS SRM

VGB Proposals (4)  VGB supports a clarification of the standard to allow inclusion of measured zero values in the calculation of the cal. function  VGB supports a flexible interpretation of the standard for plant with very low emissions, or dust monitors close to the ELV

Areas of Concern (5) - Peripherals  Variations between AMS and SRM peripheral readings may be due to actual differences between locations  It is unjustified to force the AMS and SRM to read the same by applying a QAL2-style calibration  Functional check is more appropriate  Calculated H 2 O may be more accurate than measured

VGB Proposals (5)  VGB supports the view that functional checks, rather than QAL2 calibrations, are appropriate for peripheral measurements  VGB recommends that where fuel composition is well known, calculated values of H 2 O may be used

Areas of Concern (6) – QAL3  Control limits of analyser based on S AMS – difficult to determine  Complex uncertainty analysis required. Not clear what parameters to include; data may be unavailable  Unfair to penalise analysers with better performance  Control limit should be fixed percentage of ELV

VGB Proposal (6)  VGB supports a simplified approach that eliminates the need for uncertainty analysis by the operator, and specifies control limits as a fixed percentage of the ELV.  Auto-calibration, with recording of cumulative drift, should be allowed as QAL3

Areas of Concern (7) - AST  Many situations trigger a QAL2 (e.g. a change in fuel), in some of which an AST may be sufficient to verify the cal function

QAL2 “triggers”  On installation and every 5 (3) years  Change of fuel, process or abatement system  Modification or repair to AMS  AST: cal function fails on validity or variability criteria  40% of measured values outside calibration range over a week (or 5% over 5 weeks)

QAL2 “triggers”  On installation and every 5 (3) years  Change of fuel, process or abatement system  Modification or repair to AMS  AST: cal function fails on validity or variability criteria  40% of measured values outside calibration range over a week (or 5% over 5 weeks)

Areas of Concern (7) - AST  Many situations trigger a QAL2 (e.g. a change in fuel), in some of which an AST may be sufficient to verify the cal function  On failure of AST, temporary adjustment of cal function should be allowed, pending QAL2  On-site Cross-interference testing is onerous and should not be necessary where equipment is certified

Areas of Concern (7) – AST  Functional tests could reasonably be carried out by operator and audited by accredited lab  The available 10% extension of the calibrated range is too limited  No acknowledgement of the uncertainty of the SRM, which may be similar to that of the AMS

VGB Proposal (7)  VGB supports:  Use of an AST in some circumstances where a QAL2 is currently specified;  Flexibility in allowing operators to carry out functional checks;  Explicit treatment of uncertainty of test methods

Conclusions  The standard brings welcome benefits  We have identified certain aspects that we consider impractical in implementation or inappropriate, or to impose unnecessary costs or burdens on the operator  We respectfully propose modification of these aspects and request early revision of the standard incorporating these proposals