2 Existing building 1 story metal 1972 Water Street CFA 8443 - TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.

Slides:



Advertisements
Similar presentations
2012 OLA Library Building Awards Public Libraries
Advertisements

TABLE OF CONTENTS: MISSISSAUGA PUBLIC LIBRARY PROJECT – RDH ARCHITECTS SLIDE #1 IMAGES OF EXISTING THREE LIBRARIES BEFORE RENOVATION; DRAWING AND TEXT.
12/16/2010 LINC KENTWOOD 52 nd STREET PLANNING 52 nd Street and Kalamazoo Concept #1 Two plazas at intersection of 52 nd and Kalamazoo fronted with curved.
Mississippi Chapter – American Society of Landscape Architects 2006 Awards Program Walnut Square and Walnut Circle Public Design Project Name: Project.
14th Ave. S. at the South Park Bridge
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
The Vernon Arms, Droitwich Road, Hanbury, Bromsgrove. B60 4DB. Assessment of Significance Statement. Wychavon D.C. Planning Application Reference :W/11/0127/PN.
SAVE OUR CITY: COMMUNITY DEVELOPMENT Commercial Revitalization.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Hawthorne Plaza 715 N. 9 th Street Salina, Kansas
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Lake Mary Jane - C-30 canal on south end looking northwest - Lake Hart in the distance NOTE: to forward these slides, click the Arrow or Page Down buttons.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
GATEWAY CAMPUS CENTER. Gateways The Civic Gateway The Learning Gateway The Environmental Gateway The Information Gateway The Gateway to Campus Life.
Facilities and Programmes – Peterborough Agricultural Society Office Office Offices and meeting rooms for Peterborough Agricultural Society members.
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description 342°
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Old Mankato Railroad Station By: Ryan Carlson Adam Otto.
Blue Prints.
Architectural Elevations
FFD 201 – SITE PLAN SITE PLAN.
Tech Works! will be a center that: Preserves the major technical accomplishments and innovations of the Southern Tier Engages visitors in understanding.
Welcome to Benét Laboratories U.S. Army Center of Excellence for Technology, Design, Development, Engineering, and Production & Field Support for Large.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
Preserves the pioneering technologies and enterprises of New York's Southern Tier. Engages visitors in understanding the regional advances in technology.
Public Meeting: Tuesday, February 25,  Relationship to Comprehensive Plan  Existing Conditions  Transportation Overview  Market Overview  Concept.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
State-of-Meaning NDSU Area Transit and Bus Stop. Mission Statement “… To Preserve Essential Tradition By Recognizing the existing and adding Innovation.
Formerly known as “91 Turkish” and part of the abandoned RJ Reynolds Tobacco Co. manufacturing complex, the historic rehabilitation of this property initiated.
Co-Housing Design Project in Point St. Charles Krys Wodzicki # Design Project I Professor P. Sijpkes April 18th, 2000.
Central Petaluma Specific Plan TOD Marketplace September 29, 2006.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
Revised date Chapter 9 Slide 1 Copyright – David A. McGowan All rights reserved Chapter 9 Legal Descriptions Define precise location Provide sufficient.
Roosevelt and Jackson Elementary Schools
© 2008 Coldwell Banker Real Estate Corporation. All Rights Reserved. CONFIDENTIAL INVESTMENT SALES OFFERING 27 SOUTH GATEWAY DRIVE ▫ PETSMART & CARTER’S.
Schematic Lighting Design Natty Boh Building Baltimore, Maryland Eric Singley Penn State University Architectural Engineering.
House Design Project Name: __________________________ You have been selected to design a house in the following city in China: _________________________________________.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Building 185 Orientation Briefing 101 Nelson Drive Offutt AFB,
1 Upper West Side/Central Park West Historic District Protective Mechanisms R8-B Contextual Zoning Districts W. 70 th Street midblock – north side Upper.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZ Glisan Commons May 17, 2012.
SMC South ALG Matrix Wire, Inc. Lee County April 26, 2012 DP.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
The Campus 2.06 Acres or 89,734 sq ft of Land 25,058 sq ft Church Building 4,239 sq ft Sanctuary 497 sq ft Balcony 20,322 sq ft Multipurpose.
SMITH ELEMENTARY SCHOOL ADAPTIVE REUSE SENIOR HONORS PROJECT
The East Selkirk Roundhouse
Evacuation Route Power Point
ELEVATIONS Shows the finished appearance of a given side of a building
Agenda 15th and Race Project Summary Current Requests
Principles of a Grid Reference
National Defense University Fort Lesley J McNair, Washington D.C.
Wellborn Underpass Update
1 BARE LOT LAKE ERICSON, NEBRASKA
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
Alignment near Coboop Entrance Gate - 28°55'59.78“S 19°21'39.04"E
Minuteman Vocational Technical Regional High School Progress
Stoughton Public Library
When we make our roofs, they will need an overhang to protect people from rain and they also look cool. The overhang hangs off 1 meter long on each side.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
Presentation transcript:

2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes point of view Center for Technology & Innovation, 321 Water Street, Binghamton, NY /

1 321 Water Street, Binghamton, East facade Two story brick bldg (1912); One story brick addition (1946); Metal addition (1972)

2 South façade Water Street, Adaptive reuse plans include: Replace one story addition with accessible at-grade entrance; retain stair to second floor, glass-in porch for kinetic exhibit.

3 Looking north at South and West facades

4 Northern stretch of 300’ flood wall along western property line offers possibilities for community conversations in mural form.

East façade – along Chenango River – 1946 addition in foreground 5 Looking South along West façade 1946 addition in foreground

6 Looking south along Water Street, image c. 1980s 1972 addition in foreground; 1946 addition in background

7 South façade, SE corner ; Erie RR trestle in foreground Sept 2011 high water mark

8 South façade at left; center for Garden of Ideas Storage shed under Erie RR trestle in background to be demolished to open vista & site circulation.

9 Looking East across 317 Water Street to 316 Water Street TechWorks! parking both sides of Water Street Geothermal well field to be drilled in foreground 1970s block shed - slated for demolition to open circulation

10 1 st floor – Ice Cream manufacturing space for Connecting Big Ideas exhibit

11 Engine Room Ceiling (1912) Imagination Zone

12 2nd floor 1912 building Note signs reused as ceiling tiles Details in next slide

13 Sidewalk signs reused as ceiling tiles Photo, c. 1915, Broome County Historical Society

14 Cooling equipment atop stair structure - NW corner 1946 addition

15 Looking north across roof to Interstate bridge; RR bridge in foreground