Edward Yousif February 2013 DRAINAGE DESIGN MANUAL REVISION HIGHLIGHTS 1.

Slides:



Advertisements
Similar presentations
Introduction to Hydraulic Engineering – CEE3420
Advertisements

Pipe Data Sheet Presented by David Joe Polly PE, PLS, WRE Senior Standards Engineer Roadway Engineering Unit
Concrete Box Culverts (CBC)
Antrim Township Stormwater Management Reviewing Engineer: Dewberry-Goodkind, Inc.
Crossing Structures Crossing structures are those constructed at intersections of: 1. Waterway-road (culvert or bridge). 2. Waterway-Waterway (syphon or.
Big Trout Lake Stormwater Management Design Project By Hannah Rollin.
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
1. Introduction OASIS Reference Model for Service Oriented Architecture 2. ECF 4.0 Architecture 2.1 Core vs. Profiles 2.2 Major Design Elements 2.3.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Bridge A bridge is a structure that connects two roads across a waterway. Head losses occur while water passes through the bridge between its walls. Head.
Western Washington Hydrology Model Version 3
Stormwater Quality Enhancement
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
CE 515 Railroad Engineering Drainage Source: AREMA Ch. 5, J. Rose Lectures, Ch. 19 “Transportation exists to conquer space and time -”
1 Urban Drainage and Intersection Design Image:
REPORT WRITING AND COST ESTIMATING CE 3372 Lecture 09.
IX. 1 See these resources: HDS6-01 (Section 9.3), HEC20-95 (Section 4.3 to 4.7), HDS1-78 (Section 11), TXDOT-02 (Section 4.4), FITD Class CD IX. Overview.
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
Chris Pair Senior Software Developer Bentley OnSite Overview & Update.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Tips and Tricks On Writing a Good SWMP / Drainage / Hydraulic Report. Presented by Doug Gates David Evans and Associates, Inc. ODOT Geo/Environmental Conference.
CTC 440 Review Determining peak flows Rational method Q=CIA
Brian Smith February 2013 Erosion and Sediment Control, Landscape Design Criteria 1.
CE303: Introduction to Construction Blueprint Lab.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
Putting the Finishing Touches on Your QLI Proposal
WinTR-20 Project Formulation Hydrology Computer Program Overview Presented by: WinTR-20 Development Team.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Group 5 : Rules of Engagement and CTF Operational Standards of Conduct MNF SOP 18 After Action Review (AAR) 8 June 2015 Format.
Modeling Inline Structures using HEC-RAS Version 3.1
© 2009 Bentley Systems, Incorporated Jeff Martin, PE Senior Training Materials Specialist What's the Latest with InRoads Storm & Sanitary V8i?
Stormwater Budget Overview Just a Reminder. Infrastructure Inventory for Stormwater Drainage System 19 Major Canal Control Structures 19 Major Canal Control.
Basic Hydrology & Hydraulics: DES 601 Module 1 Introduction.
Basic Hydraulics: Channels Analysis and design – I
NPEG - Water Management
FLO-2D Model Development Rio Grande Canalization Project Reach Presentation to: New Mexico – Texas Water Commission and Paso del Norte Watershed Council.
CE 3354 Engineering Hydrology
REPORTING RESEARCH Chapter 14. First step is to write a research proposal and secure permission and/or funding Next steps after the proposal - Plan, Plan,
Basic Hydrology & Hydraulics: DES 601
FDOT Plans Development CROSS SECTIONS & SHEETS. Topics Create Existing & Proposed Cross Sections Annotate Cross Sections Place Ancillary Features Using.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Basic Hydrology & Hydraulics: DES 601
CONSTRUCTION MANAGERS MANUAL
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Geopak for MoDOT Right of Way & Location Survey Plans.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Experience ∙ Innovation · Results CALCASIEU PARISH – SABINE RIVER AND BAYOU LACASSINE BASINS STORMWATER MASTER PLAN Engineers ∙ Surveyors · Environmental.
Highway and Road Projects: When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT.
IT 210 Week 2 CheckPoint Software Development Activities and Purposes To purchase this material link
Concrete Box Culverts (CBC)
Queenston Manor Apartments -
1999 Stormwater and Water Systems Modeling
Disposition of Load Research Key Documents
Central Coast Region Stormwater Control Measure Sizing Calculator
Highway Drainage-Hydrology
Soil test results and how to use them
Hydrology.
APQP Projects Responsibilities Project
Runoff in MIKE-SWMM Melissa Figurski.
Jered Carpenter Region 3 Roadway Design
Central Coast Region Stormwater Control Measure Sizing Calculator
Hydraulics Updates to the IndianaDesign Manual
Presentation transcript:

Edward Yousif February 2013 DRAINAGE DESIGN MANUAL REVISION HIGHLIGHTS 1

2

DRAINAGE SOFTWARE (HYDROLOGY AND HYDRAULICS) XP SWMM StreamStats Hydraulic Toolbox (Version 4.0) Geopak Drainage (Bentley V8i) 3

SECTION 4.0 FLOODPLAIN / DETENTION SEPARATION 4

SECTION 8 CULVERT DESIGN Culvert bottom should be designed with a natural soil “n” value. 5

SECTION 9.2 BRIDGE HYDRAULIC DESIGN WWIT Calculation Sheet Appendix H 6

Waterway Information Table Back-Up Calculations Calculate Freeboard and Clearance Calculate Effective Waterway Opening Area For Bridge Calculate Effective Waterway Opening Area For Culvert Calculate Created Head 7

SECTION 10.0 ROADWAY DRAINAGE DESIGN 8

SECTION 10.5 LINE OR REPLACE EXISTING CMP PIPES 9

SECTION 11.0 STORMWATER DETENTION STORAGE 10

DITCH CHECKS – CHECK DAMS 11

SECTION 11.5 DETENTION IN DITCHES Base Sheet M-26 12

APPENDICES - DRAINAGE CALCULATIONS Provide summary tables and narrative descriptions for each set of calculations. Provide clear references to proposed plan and profile sheets. Use Tollway recommended drainage software, or provide sample calculations if other software is used. Tollway calculations should be separated from calculations performed for other agencies. Check Concept Drainage Report before starting work on contract drawings. List inconsistencies with the Tollway Drainage Manual. Verify survey vs. as-built drawings via field check. 13

Questions ? 14