Performance Indicators of Transport Infrastructure PPP Projects

Slides:



Advertisements
Similar presentations
Regional Workshop on Public-Private
Advertisements

An Overview of Concession Laws Regional Workshop on Public-Private Partnership in Transport Cesar Queiroz Roads and Infrastructure Consultant World Bank.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Procurement Management
TXDOT Asset Maintenance
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
Company LOGO Performance- or Output-Based Procurement (PBP): Basics and Applications in Bank Projects Patricia Baquero
European Asphalt Pavement Warranties Scan September 14-28, 2002.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Selection Scoring Methodology Presented by August 23, 2007.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
6 TH ANNUAL CONFERENCE. Footer Text Date PERFORMANCE-BASED MAINTENANCE APPROACH DB/P3 Edward P. Pensock, Jr. P.E. Strategic Project Division Director.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Transport Forum 2005 by Cesar Queiroz, Lead Highway Engineer, ECSIE Washington, DC, March 7-11, 2005 Options for Implementing Performance-based Contracts.
Roads and Transport Infrastructure Consultant
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
Roads and Transport Infrastructure Consultant
Changes Required by Road Administrations and the Consulting and Contracting Industries César Queiroz, Ph.D. Roads and Transport Infrastructure Consultant.
Performance Based Contracting in Estonia. Word Bank PBC Resource Guide César Queiroz Consultant, Former Highways Adviser World Bank Washington, D.C., February.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
PPP in Brazil Procedures & Methodology Marcelo de Lima e Souza PPP Unit – Economic Advisory Ministry of Planning, Budget and Management Mexico, February.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
1 Maintenance Contracts for Rural Roads International Road Federation (IRF) German Agency for Technical Cooperation (GTZ) ) Economic Commission for Latin.
Old Policy – which no one ever seem to have heard of.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
1 The Evolution of Public-Private Partnerships & Best Practices for States The CSG Transportation Policy Academy Washington, DC September 17, 2014 Jonathan.
The main rationale behind developing the warranty clause template is to make the prospective contractors implement a maintenance philosophy which would.
ETF Conference, Building & Financing European Transport Infrastructure, Brussels, 23rd Oct Building & Financing European Transport Infrastructures.
Public Private Partnerships Virginia Concrete Conference March, 2011 Public Private Partnerships Dan Dawood, P.E. (PA)
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
Transport Research Arena - TRA Europe 2008 Strategic Session on Road Pricing and Tolling Evolution of Road User Charging Systems in Europe with a Focus.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Building Blocks for a Successful Public- Private Partnerships Presented by Igor Abramov Counsel & Co-chair, Eurasia and Russia Practice Group, Heenan Blaikie.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Toll Road Asset Management and the Linkage to Finance Transportation Innovations, Inc. 10/22/
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
CONSTRUCTION CONTRACTS DOCUEMENTS
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Introducing a New Concessions System – Latvian Experience.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
New alternatives for financing a river dredging project (Argentina)
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Financial Simulation of Public- Private Partnership (PPP) Projects in Highways Cesar Queiroz World Bank, 3 April 2006 Transport Forum and Learning Week.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Economic Advisory – PPP Unit 1 Public-Private Partnerships and the FGP Isaac Averbuch Washington Oct, 2008.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Road Maintenance in Estonia
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Discussion of the Differences Public Works Law and Bid Law
European Asphalt Pavement Warranties Scan
ASEAN PPP Summit The Public-Private Partnership Model and
Virginia’s P3 Program Morteza Farajian, PhD.
Toolkit for Public-Private Partnership in Highways
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
Presentation transcript:

Performance Indicators of Transport Infrastructure PPP Projects Ministry of Economy of Poland and World Bank Seminar on Legal, Economic and Implementation Issues in PPP Projects Performance Indicators of Transport Infrastructure PPP Projects César Queiroz Roads and Transport Infrastructure Consultant Warsaw, Poland, June 17 and 18, 2008

Presentation Outline Summary of performance-based contract (PBC) experience An example from the US Virginia Department of Transportation: Performance criteria Example of legal framework Performance criteria for dredging works From performance-based contracts (PBC) to concessions Success factors for a PPP project

Summary of PBC Experience in the USA State Introduction Year Contract Life (years) Virginia 1996 5 (+5) Florida 1999 5 – 7 (+7) Texas 5 (+3) Washington, DC 2000

PBC Experience US State of Virginia http://www.virginiadot.org/projects/constSTAN-I81-overview.asp US State of Florida http://www.dot.state.fl.us/statemaintenanceoffice/asset.htm US State of Texas http://www.dot.state.tx.us Other Countries Include: Estonia, Serbia, Australia, New Zealand, Canada, Sweden, Finland, Argentina, Brazil

An Example of Invitation for Bid with Expected Outcome and Tolerance Virginia Department of Transportation, Invitation for Bid IFB# 156-RT, Issued on July 27, 2007 Scope: Turnkey Asset Maintenance Services (TAMS) of I-81 and I-66 sections (about 320 km) Mandatory Pre-bid Conference: August 20, 2007 Technical Proposal Due Date: October 2, 2007 Initial Contract Period: April 15, 2008 to April 14, 2013 http://www.virginiadot.org/projects/constSTAN-I81-overview.asp www.eva.state.va.us

The Bidding Process Combined two-step sealed bid: Bidders are to furnish at the same time an unpriced technical proposal in one sealed envelope bid price in a second sealed envelope The technical proposals will be opened and evaluated. Only the price envelopes for those technical proposals selected as acceptable will be opened The award will be made to the lowest responsive and responsible bidder “Acceptable” - a score of 75 points or higher

Technical Proposal Evaluation Criteria Qualifications Scoring Organizational Structure, History and Key Personnel 10 Quality Management Plan 15 Routine Maintenance Operations Plan 20 Emergency Operations & Incident Management 20 Customer Service, Timeliness Requirements & Tracking Plan 10 Third Party Damage Scoring Accounts Receivable Claims Process and Reporting 5 Small Business Utilization Use of Small Business 20

I-81 is one of the eight top truck routes in the U.S.

Corn poppies in the median of I-81 near Dixie Caverns

Performance Requirements The Contractor performance is measured by achievement of Outcomes and Performance Targets as specified in the IFB (Attachment III) Outcomes include both Asset Outcomes and Timeliness Requirements Failure to meet any of the performance requirements may result in deductions from the Contractor’s payment

Example of Performance Criteria 1 Asset: Vegetation Outcome: Healthy Growing, Neat appearance, Acceptable coverage, Proper sight distance Target: 90% Tolerance and criteria: < 10% of mowable area to exceed 12” in height; All sight distances are clear; Neat / trimmed around guardrail, headwalls, paved ditches, signs; No cut less than 4” in height Timeliness: Vegetation affecting sight distance presenting a safety hazard shall be removed within 24 hours of notification or discovery

Example of Performance Criteria 2 Asset: Landscaping, Wildflowers, Beds, Bulb Beds, Ornamental Shrub Beds Outcome: Neat, Attractive, Growing Target: 90% Tolerance and criteria: < 10% of bed contains weeds; <10% of bed not growing

Example of Performance Criteria 3 Asset: Illegal signs / structures Outcome: Right-of-way free of illegal signs or structures Target: 100% Tolerance and criteria: No illegal signs on the right-of-way; No illegal structures on the right-of-way Timeliness Requirement: Removal of sign within 24 hours

Example of Performance Criteria 4 Asset: Concrete Barriers Outcome: Safe; Structurally sound Target: 90% Tolerance and criteria: Free of vegetation; < 10% joint material damaged or missing; Weep Holes > 90% free of obstruction Timeliness Requirement: Damaged or misaligned barriers due to accidents/incidents shall be mitigated immediately upon notification or discovery or before accident scene is cleared; Repair to barriers shall be completed within 10 days of notification or discovery

Example of Performance Criteria 5 Asset: Asphalt surface Outcome: Safe, Durable, Smooth Target: 95% Tolerance and criteria: No potholes; Patches < 1/4” higher or lower than surrounding pavement; No pavement obstructions that present a safety hazard Timeliness Requirement: Temporary repairs to potholes 6” x 6” x 1 ½” deep or larger shall be repaired immediately upon notification or discovery; All others within 2 days of notification or discovery; Permanent repairs to potholes/ pavement failures shall be completed within 30 days of notification or discovery during seasons when asphalt plants are operating or within 30 days of asphalt plants opening for the season; Pavement obstructions that present a safety hazard shall be mitigated immediately

Example of Performance Criteria 6 Asset: Concrete surface Outcome: Safe, Durable, Smooth Target: 95% Tolerance and criteria: No potholes; < 10% of surface area has cracks > 1/2” wide; < 25% surface area has spalling > 1” deep; < 25% of joint material missing; No grass growing in joint; No pavement obstructions that present a safety hazard Timeliness Requirement: Temporary repairs to potholes 6” x 6” x 1 ½” deep or larger shall be repaired immediately upon notification. All others within 2 days; Permanent repairs to potholes/ pavement failures shall be completed within 30 days of notification; Pavement obstructions that present a safety hazard shall be mitigated immediately

Withholding for Nonperformance The Department will assess a nonperformance withholding equal to 1% of the annual contract value for each point below a maintenance rating of 90 for each Asset Group (roadway & shoulders, roadside, traffic services, drainage, and bridge). The Department will assess an additional nonperformance withholding equal to .50% of the cumulative amount for each point below 70 on any Asset item

IFB# 156-RT CONTRACTORS BID SHEET MONTHLY Bid price for Turnkey Asset Maintenance Services: $___________________ Total Lump Sum Bid Price (Monthly bid price X 60 months): $___________________ Firm Name _________________________ Print Name _________________________ Signature ___________________________ Date_______________________________

An Example of Legal Framework: Commonwealth of Virginia, USA The Public-Private Transportation Act of 1995 is the legislative framework enabling the Commonwealth of Virginia to enter into agreements authorizing private entities to acquire, construct, improve, maintain, and/or operate qualifying transportation facilities http://www.virginiadot.org/business/resources/PPTA-overview.pdf

Performance Based Contracts for Dredging – a Form of PPP Also known as draught guarantee contracts The contractor bears sedimentation risks over longer periods and is paid for services with monthly fixed amounts (or alternative financing such as toll – then a concession) Most ports and waterways have carried out maintenance dredging by two types of contract: Dredging paid by volume, or Charter contracts Before: directly by the government

Where to Apply Performance Based Contracts for Dredging? Where a stable level of policy is to be expected Where sedimentation can be evaluated within reasonable assumptions of risk Where other risks are covered with reasonable contractual limits (for example, extreme weather conditions) Sufficient volume to allow competitive bidding

Example of Performance Based Contract (PBC) for Dredging BAHIA BLANCA , Argentina A 5-year PBC for maintenance dredging Phase 1: Capital dredging; Opening Volume preset at 1 million m3; when real opening volume is measured the contract value was adjusted accordingly Phase 2: Maintenance dredging during remained of 5-year period The bid price was comprised of 60 equal monthly payments, plus the initial dredging

From Performance Based Contract to Concession – An Example PBC: The contractor bears sedimentation risks over longer periods and is paid for services with monthly fixed amounts Concession: In addition to sedimentation risks, the contractor also bears demand risks, as payments are made by the users directly to the concessionaire

Example of Concession for Dredging Hidrovia Waterway Concession, Argentina Concession contract for 18 years: 1995 – 2013 Rio Parana and Rio de la Plata from Santa Fe to the Atlantic Ocean Mainly for oceangoing traffic, but also river barges use the waterway 800 km of main waterway for Argentine exports (> 80% of export)

Hidrovia Waterway Concession Risk of sedimentation and traffic born by the concessionaire The works include: Capital dredging and installation of buoys in 1995-1996; Deepening works from 9.8 m 10.4 m navigation channel; 800 km maintenance dredging – about 22 million m3/year; Maintenance of the buoys and beacons; Toll system Contract clause includes guaranteed depths and safety all year round, 24 hours per day

Hidrovia Waterway Concession Tolls: paid by all commercial vessels per tonnage (NRT) and used stretch Toll level is revised on regular basis with state to find equilibrium between costs and revenues End costs for typical users: about 1 USD/ton of grain exported; 16 USD/TEU Concessionaire: Jan De Nul Group (DJN)

Hidrovia Waterway Concession

How can the goals of a complex PPP project be achieved? Careful selection of the project Due consideration of economic, financial, social, and environment aspects Transparent, competitive selection of the concessionaire Realistic expectations, including deadlines A dedicated and well prepared team PPP agreement satisfactory to stakeholders, including a fair distribution of risks

Thank you!

Some Basic References World Bank (2006). “Resource Guide for Performance-based Contracting.” Washington, D.C. http://www.worldbank.org/transport/roads/resource-guide/index.html World Bank (2005). “Performance-based Contracting For Preservation and Improvement of Road Assets.” Transport Note No. 27. Washington, D.C. http://www.worldbank.org/transport/roads/resource-guide/Docs-latest%20edition/PBC/trn_27_PBC_Eng_final_2005.pdf World Bank (2006). “Sample Bidding Document: Output- and Performance-based Road Contract (OPRC).” http://www.worldbank.org/procure/ World Bank (2003). “Toolkit for Public-Private Partnership in Highways.” Public-Private Infrastructure Advisory Facility (PPIAF) and World Bank. http://rru.worldbank.org/Documents/Toolkits/Highways/index.htm

How to Find the Virginia DOT Invitation for Bid on the Internet? Virginia Department of Transportation, Invitation for Bid IFB# 156-RT www.eva.state.va.us Vendors eVA business opportunities “Click here to view current and future eVA Business Opportunities” Public Access to current and past Solicitations https://vendor.epro.cgipdc.com/loginEngine/preLogin.jsp?guest_login=Public Access In Keyword Search, type: 156-RT

World Bank Websites on Performance-based Contracts Resource Guide for Performance-based Contracting http://www.worldbank.org/transport/roads/resource-guide/index.html Training Course for Performance-Based Management and Maintenance of Roads http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTTRANSPORT/EXTROADSHIGHWAYS/0,,contentMDK:20706624~pagePK:148956~piPK:216618~theSitePK:338661,00.html Road Management Catalog http://web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTTRANSPORT/EXTROADSHIGHWAYS/0,,contentMDK:20735996~pagePK:210058~piPK:210062~theSitePK:338661,00.html

Cesar Queiroz Roads and Transport Infrastructure Consultant World Bank, 1818 H Street NW Washington DC 20433 USA Tel +1 202-473 8053 Mob +1 301-755 7591 Email: cqueiroz@worldbank.org http://www.worldbank.org/transport http://www.worldbank.org/highways

Cesar Queiroz is an international consultant on roads and transport infrastructure, with main interest in public-private partnerships (PPP) in infrastructure, road management and development, performance-based contracts, port rehabilitation, improving governance, quality assurance and evaluation, research, teaching and training. Between 1986 and 2006, he held several positions with the World Bank in Washington, D.C., including principal highway engineer, lead highway engineer, and highway advisor. Prior to joining the World Bank, Cesar was the deputy director of the Brazilian Road Research Institute in Rio de Janeiro. He holds a Ph.D. in civil engineering from the University of Texas, USA, and a M.Sc. in Production Engineering from the Federal University of Rio de Janeiro. Cesar has published more than 130 papers and articles, and is a co-author of two World Bank main publications, the “Toolkit for PPP in Highways” and the “Resource Guide for Performance-based Contracting.” His recent countries of assignment include Russia, Brazil, Latvia, Lithuania, Poland, Ukraine, Philippines, Sweden.