Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM.

Slides:



Advertisements
Similar presentations
Ontario Problem Gambling Research Centre April 1, 2010.
Advertisements

19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Observation Preparation Tool (OPT) Loránt Sjouwerman (NRAO/Socorro)
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
OSEP New Data Manager Overview. Objectives Briefly review the IDEA data collections Outline OSEP’s data quality review process and associated documents.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Applying Made Easy: Technical Details of the UC Application Fall 2013 Counselor Conference.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
©SHRM D College Relations Webinar Tara Fournier, PHR and Scott D. Ferrin, SPHR February 6, 2014 Bhavna Dave, PHR Director of Talent SHRM member.
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
August 2014 Presenting Yourself on the UC Application for Undergraduate Admission – Transfers.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The ALMA Observing.
August 2014 Presenting Yourself on the UC Application for Undergraduate Admission – Freshmen.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
VLA Archive Image Pilot Pilot to create images from VLA archive data Loránt Sjouwerman National Radio Astronomy Observatory.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
FY 2011 Budget Period Progress Report Cheri Daly
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Radio Interferometers’ Data Archives how to find, retrieve, and image radio data: a lay-person’s primer Michael P Rupen (NRAO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The ALMA Observing.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
Hazardous Materials Emergency Preparedness Grant Multi – Year Award Process Matthew R. Jones Sr. Grants Management Specialist Grants and Registration Branch.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
The Allen Telescope Array Douglas Bock Radio Astronomy Laboratory University of California, Berkeley Socorro, August 23, 2001.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
Kayako’s native dept/sub-dept interface Kayako’s native department/sub-department structure allows for ticket submission in both the department and sub-department.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Playbook and Funds Program Update 1 April 16, 2015.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.
August 2015 Presenting Yourself on the UC Application for Undergraduate Admission – Freshmen.
Teacher Evaluation Timeline
Informal document GRE-77-18
NRAO VLA Archive Survey
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
Course Profile Enhancements 2016
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Science Policies and Timeline
GBT Proposal Specifics
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
Shared Risk Science with the EVLA
Observatory Science Operations
Observatory Science Operations
EVLA Construction Status
Review plan of the nature reporting – update 6
AAAA SCHOLARSHIP PROGRAM
Thesis & Dissertation Services Document Submission Workshop
Thesis & Dissertation Services Document Submission Workshop
Welcome to ALMA Community Day!
Presentation transcript:

Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM

Outline Proposal writing – Generic Science goal Requirements Other considerations – VLA and VLBA (and GBT) NRAO call for proposals VLA configurations and VL(B)A dynamic scheduling Proposal Submission Tool (PST) Regular proposal submission process Other Proposal Types and Routes NRAO VLA Proposing for VLA and VLBA Time - Webinar, 2012 June 11 2 NRAO VLBA

Generic: science goal Start with a scientific idea and target list what and why Draft a scientific justification: what and why – Write to astrophysically-literate but non-expert reviewers – Give science context and motivation – Pose specific science questions – State specific science goals – Describe target selection criteria – Say how the proposed observations will … Answer the science questions Achieve the science goals – Be quantitative ! 3 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

Generic: requirements how Draft a technical justification: how – Angular resolution (longest projected baseline required) – Largest angular scale (shortest projected baseline required) – (redshifted) Observing frequency, Stokes parameters (polarization) – Spectral resolution and bandwidth coverage, e.g., line-of-sight velocity – Elevation limits and snapshot or full uv-coverage – Sensitivity: use (online) sensitivity calculators! In the image (dynamic range and signal to noise ratio on target) On a baseline (for calibration, self-calibration) – Be quantitative ! – Flexibility, or what are the possible trade-offs? Check the archives for existing data 4 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

Generic: other considerations Enough field of view? – Primary beam attenuation; single field or mosaic? – Time and bandwidth smearing affect sources at the edge of the field Nearby calibrators? – Need to find better ones, are there other lists to be used? Optimal timeframes? – Time of day (night versus day observing, maintenance/RFI) – Season (summer, winter) – Is the required configuration observing mode offered for this cycle? – Solar activity, planet positions, other.. Data reduction plan for large data sets Cover sheets: – Consult collaborators, abstract, student support 5 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

VL(B)A (and GBT): Call for Proposals See NRAO Call for Proposals at – Proposal deadlines at 5pm Eastern Time on 1 st of February, for observing during about July through December 1 st of August, for observing during about January through June – Call for proposals issued about 3-4 weeks before each deadline Occasional out-of-cycle calls for special opportunities – Everyone can apply for NRAO time (“open skies” policy) – If you are interested in applying for time Read the call for proposals! Read the call for proposals! – It contains the latest updates; things do change – Planned capabilities offered – Special opportunities offered – Start as early as possible; you are competing for time 6 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

VLA Configuration and dynamic scheduling Upcoming VLA configurations at – This1 st of August: D, DnC, C (smaller configurations, up to 1 or 3 km) – 12A and 12B: 13A daytime: late LST (R.A.) Both VLA and VLBA use dynamic scheduling – Range of starting times – Calibration and overhead included in your scheduling blocks – Include calibration and overhead in the observing time request Depending on the science this can be anywhere from 20 to >50% 7 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

Proposal Submission Tool (PST) Prepare a PDF file using any editor to include – The scientific and technical justification (i.e., what, why and how) – The combined PDF file should meet the requirements: Content, minimum font size, maximum number of pages – Up to 4 pages for a regular proposal (total, including figures, etc.) – Up to10 pages for a large proposal (~200 or more NRAO hours) Access the NRAO PST at – Register and invite co-authors to register (required!) – Select VLA, VLBA, GBT (and further select any joint combination) – Fill out the cover sheets and abstract, and attach the PDF file Numbers (etc.) in cover and justification text should match! Inclusion of a NRAO staff co-author is optional but may be useful Single submission, no updated submissions without canceling first! 8 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

VLA/VLBA Proposals and Students Consider submitting a deadline early – Use referee feedback to prepare, re-submit improved proposal Are the proposed observations for a thesis ? – If yes, amend your user profile at Add a “Plan of Dissertation”: ~ timeline + NRAO resources Update graduation year Is the student eligible for funding ? – – US universities and colleges and for Regular or Large proposals – Apply via NRAO PST at the submission stage (extra work: start early!) Donate thesis copies to NRAO – Proposing for VLA and VLBA Time - Webinar, 2012 June 11 9

Regular proposal submission process Received for deadlines 1 st Feb, 1 st Aug for semesters (year)B, (year+1)A Classified by scientific categories Sent to category’s scientific review panel and NRAO technical reviewers Referees return ratings and comments Ratings and comments sent to Proposal Selection Committee (PSC) – 5-10 representatives of the community – 3-5 representatives of NRAO PSC meets around early April and October PSC results ed to proposers around 1 st June and1 st December Approved projects will appear in the Observation Preparation Tool Details at 10 Proposing for VLA and VLBA Time - Webinar, 2012 June 11

Other Proposal Types and Routes VLA/VLBA Director's Discretionary Time (a.k.a. rapid response science) – Exploratory or filler: e.g., quick follow-up of recent discovery – Target of opportunity: e.g., unpredicted phenomenon – types/directorsdiscretionarytime types/directorsdiscretionarytime – NOT – NOT for a missed deadline Joint proposal routes, not through PST – Chandra/VLA/VLBA – Fermi/VLA/VLBA Proposing for VLA and VLBA Time - Webinar, 2012 June Chandra Fermi

Most useful web pages for help General NRAO Specific NRAO instrument Helpdesk (Google, etc) 12 Proposing for VLA and VLBA Time - Webinar, 2012 June 11