COSMO General Meeting 10-13 September 2012 Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction EUMETNET C-SRNWP Programme:

Slides:



Advertisements
Similar presentations
EUMETNET Presentation for Regional Meeting for Strengthening Regional Cooperation in Meteorology, Hydrology and Climate Services for Disaster Risk Management.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
© Crown copyright Met Office WINPROF-II. Tim Oakley, WINPROF II Programme Manager, May 2008.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
WMO Outcomes & Recommendations of the Workshop on Radar Data Exchange WMO; Name of Department (ND)
EUCOS The EUMETNET Composite Observing System Stuart Goldstraw – EUCOS Operations Manager Thanks to Jacqui Rogers, EUCOS Technical Co-ordinator.
Iwan Holleman, Program Manager OPERA c/o The Royal Netherlands Meteorological Institute (KNMI) EUMETNET - OPERA WMO-TECO:
EWGLAM/SRNWP Annual Meetings 2005 SRNWP Business Meeting 5 October 2005 Ljubljana (Slovenia) Short-Range Numerical Weather Prediction Programme.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF, January 2008 SRNWP Interoperability Terry Davies Met Office.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
Regional Report on the current status of the exchange of weather radar data. RA VI Stuart Matthews, UK Met Office on behalf of EUMETNET OPERA April 24th.
00/XXXX1 EUMETNET Tim Oakley Met Office, Exeter, UK CIMO ET on Upgrading the Global Radiosonde Network – Geneva 3-7 November 2003.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
SRNWP data pool Jean-Marie Bettems / MeteoSwiss Claudia Heret / DWD COSMO GM Roma, September 5 th, 2011.
World Meteorological Organization Working together in weather, climate and water EC WG-CD Terms of Reference and Review of Cg-XVI and EC-LXIII
Development and Evaluation of Joint Study Programmes Almantas Šerpatauskas Center for Quality Assessment in Higher Education.
GIE/EIG EUMETNET, Registered Number RPM Bruxelles Status of the EUMETNET C-SRNWP project Gergely Bölöni C-SRNWP: Coordination on Short Range.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
SRNWP meeting, Dubrovnik OMSZ PROPOSAL October, OMSZ proposal for becoming responsible member of the C-SRNWP programme ANDRÁS HORÁNYI
Page 1© Crown copyright 2004 Quality Management of a European Wind Profiler Network (CWINDE) Tim Oakley TECO-05 Bucharest, 4 th -7 th May.
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
Eumetcal now and in the future Vesa Nietosvaara François Lalaurette.
European Cooperation on Nowcasting Yong Wang, ZAMG.
WE Surface-based GOS for Weather January 2008 Up-date.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
Roshydromet’s COSMO-related plans Presenter: Dmitry Kiktev Hydrometcentre of Russia.
Improved road weather forecasting by using high resolution satellite data Claus Petersen and Bent H. Sass Danish Meteorological Institute.
EUROSAI Professional Standards – Goal Team 2 Brief introduction Cristina Breden Mária Kysucká Vilnius, September 2012.
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological.
WMO AMDAR Programme Overview Bryce Ford - presenting on behalf of WMO and NOAA FPAW Nov 1, 2012.
1 EUCOS Fourth WMO Workshop on the Impact of Various Observing Systems on Numerical Weather Prediction May 2008, WMO, Geneva, Switzerland Stefan.
Short-Range NWP Programme 8th COSMO General Meeting Organisation: Romanian National Meteorological Administration September 2006 Bucharest (Romania)
1 EUCOS Fourth WMO Workshop on the Impact of Various Observing Systems on Numerical Weather Prediction May 2008, WMO, Geneva, Switzerland Stefan.
REVIEW OF OUTCOMES FROM THE 2 nd WIGOS Workshop on Quality Monitoring and Incident Management ICG-WIGOS-5 WMO; OBS/WIGOS.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
ALADIN 3DVAR at the Hungarian Meteorological Service 1 _____________________________________________________________________________________ 27th EWGLAM.
C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological.
© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Implementing the New JCOMM Marine Climate Data System (MCDS)
Responsible member: Hungarian Meteorological Service Period:
2nd Snow Watch meeting Ohio State University, Columbus, June 2016
LAM and Short Range NWP Some thoughts from Brussels
MALDIVES Project Support meeting for the Regional Programme on Economic Statistics Bangkok, November 2016.
Assessment of the Evaluation Culture
ET-SBO Report to ICT-IOS-9
Snow Depth Reports Availability on the GTS
Document 5.4.1(3) Observing System Design and Evolution
Status of the EUMETNET C-SRNWP project
South East European Multi-Hazard Early Warning Advisory System (SEE-MHEWS-A) Potential contribution to WMO Global Meteo Alarm System Milan Dacić and.
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
Implementation of IRES
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
2011 POPULATION AND HOUSING CENSUS PREPARATORY WORKS
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
SRNWP-PEPS COSMO General Meeting September 2005
Activities of WG7 Chiara Marsigli.
Presentation transcript:

COSMO General Meeting September 2012 Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction EUMETNET C-SRNWP Programme: status and plans

Introduction  Coordination on short range NWP between 32 European meteorological institutions  OMSZ is the actual Coordinating Member (till the end of 2012) Main activities:  Represent short-range NWP needs in fornt of other institutions/projects (e.g. ECMWF or EUMETNET observation programmes)  Enhance cooperation on NWP: share resources in operations and stimulate competition on scientific development COSMO General Meeting September 2012

Actual coordination activities 1) NWP requirements regarding OPERA products  A related questionnaire was prepared by OPERA for NMSs  19 NMSs answered  The main outcome is that for SRNWP (assimilation) 3D volume (wind and reflectivity) data are required by all NMSs (which are received at Odyssey but not re-distributed at the moment) with an appropriate QC flagging (rain, no-rain, cluttered, etc.)  Questionnaire outcomes taken into account when composing the OPERA project requirements for the next EUMETNET phase ( )  ALADIN and HIRLAM provided proposals how to speed up and improve the volume data re-distribution (simple data policy, nominated transmission centers in each consortium, non-operational data service at the beginning, recommendation that NMSs include wind data and QC flags asap, SRNWP priorities for the next OPERA project)  Feedback from OPERA: the NWP requirements were useful, recommendations for including wind data made by OPERA management through E-SAT (EUCOS Scientific Advisory Team), SRNWP priorities noticed COSMO General Meeting September 2012

Actual coordination activities 2) ECMWF/IFS EPS LBCs to drive high resolution LAM EPS  To drive future high resolution LAM EPS systems extra IFS EPS runs are anticipated by the SRNWP community from ECMWF on the top of the presently operational (higher resolution, 06 and 18 UTC runs)  ECMWF developed an „economic archive” to store EPS model level fields only over Europe, North-Atlantic, North-Africa (covering all anticipated European EPS domains)  The „economic archive” (reduced Gaussian grid) was succesfully tested by interested European consortia (relevant models: ALADIN/ALARO, AROME, COSMO, HIRLAM)  Agreement reached (EPS-DA workshop Bologna 2011) within the SRNWP ET about the parameters (resolution, EPS size, forecast range) of future test runs  IFS EPS tests are requested from ECMWF: 2x2 weeks T1279 test periods are to be run (periods to be agreed soon) COSMO General Meeting September 2012

Actual coordination activities 3) SRNWP surface data base ( )  thanks to C. Heret and T. Andreadis  Data from Debrecen station entered the data base  5 new users (Croatia, Germany, Hungary, Russia, Sweden) 4) EWGLAM workshop (Helsinki, 8-11 October 2012)  (thanks to FMI, Carl Fortelius)  65 participants registered  Check out the programme (almost finalized) 5) High-resolution AMDAR profiles to be tested in SRNWP DA:  High vertical resolution data provided by E-MADAR via GTS ( May 2011 )  BUFR test data set prepared and distributed for the SRNWP DA community for providing reference (usual resolution) COSMO General Meeting September 2012

Actual coordination activities Announcement sent to SRNWP DA community to run simple assimilation tests based on these 2 days to see whether monitoring statistics / analysis increments are affected 6) BUFR radiosond data: Collect info about the assimilation of BUFR (slanted) radiosond profiles (taking into account lat, lon, time information) Feedback to E-SAT 7) AMDAR humidity OSEs over US:  AMDAR humidity profiles available over US  Near future: EUCOS will invite SRNWP DA institutions to investigate the impact of the AMDAR humidity profiles over US using European SRNWP models / DA systems (dedicated budget) COSMO General Meeting September 2012

Organizational matters (WARNING!) Expert Teams  Expert Teams (and their chairs) are of key importance to coordinate cross- consortia issues!  There is no chair of the Expert Team for Physical Parametrizations, Dynamics and System Aspects  no candidate among ET members  candidates/proposals welcome  From January 2013 onwards no chair of the ET for Surface Aspects (Jean- Francois Mahfouf will step down from his chair position)  SRNWP AC should be renamed as SRNWP Expert Team (according to the new rules of EUMETNET)  proposal: composition and ToR remains the same, only the name is to be changed COSMO General Meeting September 2012

Assembly STACPFAC Obs. + Clim. Programmes + EUMETCAL EMMA C-SRNWP SRNWP-I SRNWP-V Observation Programme Climate Programme Forecasting Programme Roadmap documents COSMO General Meeting September 2012 Next EUMTENET phase: NWP related changes

Assembly STACPFAC Observation Programme Climate Programme Forecasting Programme EUMETCAL EMMA C-SRNWP EPS Nowcasting Projects to be finished: SRNWP-I and SRNWP-V (end of 2012) New anticipated projects: EPS, Nowcasting COSMO General Meeting September 2012 Next EUMTENET phase: NWP related changes

 Jan-March 2012: project requirements were composed the 3 NWP related projects: C-SRNWP, EPS, Nowcasting  a less pessimistic picture about future EUMETNET projects than at last EWGLAM  End of March 2012: STAC/PFAC approved the Forecasting Programme requirements and sent it for approval to Assembly (May 2012)  this implies that the content of the C-SRNWP, EPS, Nowcasting projects were also approved by STAC/PFAC  Applications under evaluation for all future projects (including EPS, Nowcasting, C-SRNWP)  proposal to STAC/PFAC till mid September 2012  STAC/PFAC proposes projects and Coordinating Members based on the evaluation reports (October 2012) COSMO General Meeting September 2012

Next EUMTENET phase: NWP related changes  Assembly decides about the future projects (November 2012)  Hand over existing projects (January-June 2013)  Feelings about the future (based on feedbacks from STAC/PFAC meetings):  The actual start of projects related to forecasting/NWP (EPS, Nowcasting, C- SRNWP) will depend whether interested participating members can afford the budget (some of the important NMSs are not interested in these projects)  the management structure will depend on incoming bids COSMO General Meeting September 2012

Next EUMTENET phase: NWP related changes Content of the anticipated NWP related projects:  EPS project: 1.5 year feasibility project with the main goal of preparing a solid EPS project for the period of (review and harmonize NMS scientific strategies for high-res EPS, identify overlaps in plans, prepare plans for reducing costs)  Nowcasting activity: 1.5 year feasibility „activity” with the main goal of recuiting Nowcasting experts (create an ET) who prepare a solid Nowcasting project for (identify exchangable knowladge, organize timely observation exchange, etc.)  C-SRNWP project: 5 year project coordinating SRNWP like since 2008 COSMO General Meeting September 2012

How to improve C-SRNWP? My experience:  Scientific plans are driven at national or at conosrtia level (not at EUMETNET level)   C-SRNWP is NOT for driving plans How to use best this coordination programme?  Identify subjects that are in the interest of (more or less) all NWP centers (consortia) in Europe  Then these interests gain an official status, which we might use to put forward common plans.  These interests then can be more efficiently represented in front of other EUMETNET programmes and other organizations outside EUMETNET  …? Further questions:  Which interests more we have in common?  What do you all think about the above statements/questions? COSMO General Meeting September 2012