Final General Assembly – Paris, France – September 19, 2014 FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011.

Slides:



Advertisements
Similar presentations
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
Advertisements

SIO 210: I. Observational methods and II. Data analysis (combined single lecture) Fall 2013 Remote sensing In situ T, S and tracers Velocity Observing.
1 Plans for the European contribution to OceanSITES. FixO 3 Richard Lampitt National Oceanography Centre Southampton UK.
NOAA RESEARCH PERSPECTIVES: AUTONOMOUS TECHNOLOGIES FOR OCEAN OBSERVATIONS Chris Beaverson Acentia, LLC Supporting: Ocean Exploration and Research Program.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
First Marine Board Forum – 15 May Oostende Marine Data Challenges: from Observation to Information From observation to data.
Introduction to the EASME and its role in Horizon 2020
Work Package 2 / 3 TECHNOLOGICAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ESTOC, PLOCAN,
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The MyOcean Concept P.Bahurel, project coordinator.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Action ES0904 European Gliding Observatories Network (EGO) Final Symposium Simón Ruiz (Spain) Daniel Hayes (Cyprus) WG5 leaders Kiel, 16-17June 2014.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP9: New Methods to Assess the Impact of Coastal Observing Systems Presented by.
Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider”
UNDERWATER GLIDERS.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
Observing System Status- Brief Overview Will post PPts from Mike Johnson and from Eric Lindstrom from the annual review of the NOAA Climate Observations.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
CTD and rosette CLOSING REMARKS Think about huge range of options, e.g. for measuring temperature:
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
“Toward a GOOS glider programme: Tools and methods” General Assembly.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
Laura Beranzoli Istituto Nazionale di Geofisica e Vulcanologia October 5-7, 2009ESONET NoE - 2nd All Region Workshop WP4 – Demonstration Missions.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
Demonstrators and Pan-European Services Laboratory WP5 session.
Global Terrestrial Observing System linking the world’s terrestrial monitoring systems to provide a global vision of the Earth we share.
EuroGOOS Annual Meeting 2009/10/ /10/08 ESONET All Regions Workshop 2009, October 5-7 th, Paris Integrating and Enhancing the European capacity for.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
NOAA’s Office of Climate Observation Presented to the JTA XXIII Angra Dos Reis Rio De Janeiro October , 2003 Sidney W. Thurston, Ph.D. National.
European Gliding Observatories Network (EGO) Action ES0904: Start date: 01/10/2010 End date: 30/09/2013 Year: 1 Pierre Testor Chair LOCEAN-CNRS / France.
Shipboard Automated Meteorological and Oceanographic System (SAMOS) Initiative: A Key Component of an Ocean Observing System Shawn R. Smith Center for.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
The Science Requirements for Coastal and Marine Spatial Planning Dr. Robert B. Gagosian President and CEO September 24, 2009.
New Technology for basin wide monitoring: GLIDERS Institut für Meereskunde (University of Kiel, Germany) Pierre Testor & Uwe Send (WP5 leader) MFSTEP Partner.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
U.S. Integrated Ocean Observing System (IOOS ® ) Z Improve safetyEnhance our economyProtect our environment CIMAR-GOMC meeting – 25 Feb 2015 Zdenka Willis.
Speaker I Organism I adresse mail WP9: NEW METHODS TO ASSESS THE IMPACT OF COASTAL OBSERVING SYSTEMS Presented by Srdjan Dobricic on.
Short-term scientific Missions (STSM) STSM manager: Agnieszka Beszczynska-Moeller (Poland)
Summary 26 September 2012 Core Theme 5: Technological Advancements for Improved near- realtime data transmission and Coupled Ocean-Atmosphere Data Assimilation.
SIO 218A Observational techniques in physical oceanography Goals/methods: Learn currently used methods and instruments Understand principles of observation/technique.
Work Package 3 FixO3 “label” FixO3 General Assembly October 2014, Heraklion-CRETE Jean-Francois Rolin, George Petihakis IFREMER, HCMR.
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Session 6 Observatories optimization and development Ute Schuster, University of Exeter, UK Jean-Francois Rolin, Ifremer, France.
Workshop Sensor Web Enablement (SWE) for oceanography - introduction Dick M.A. Schaap – MARIS March 2016.
Moving away from the fish-eye view Integrating Surveys for the Ecosystem Approach 29 May 2013, Ingeborg de Boois (WGISUR)
WP5: In Situ Monitoring This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement.
WP5.1 Ground Segment Description with contributions from all partners
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
WP5: In Situ Monitoring This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement.
JCOMM in-situ Observations Programme Support Centre www. jcommops
FP7-Infra : Design studies for European Research Infrastrutures
Candyce Clark JCOMM Observations Programme Area Coordinator
Patrick Farcy, Simon Keeble, Aldo Drago
Task 2.3 Optimization and coordination of existing TMA systems, improved data delivery for predictions and identification of gaps [Lead: HAV; Participants:
JCOMM in-situ Observations Programme Support Centre www. jcommops
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
UNDERWATER GLIDERS.
GODAE Final Symposium, 12 – 15 November 2008, Nice, France
Presentation transcript:

Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month 18 – month 39) Grant Agreement No: ; Total budget : 3,5 M€ 19 partners from cy, de, fr, gr, it, no, es, uk "Gliders for Research, Ocean Observation and Management" General Assembly

Final General Assembly – Paris, France – September 19, 2014 WP 4 Targeted Experiments WP leader Karen Heywood (UEA) presented by Jan Kaiser (UEA) Contributors UPMC, SAMS, NERC, FMI, UEA, IFM-GEOMAR, PLOCAN, UIB, AWI, UCY, NURC, OGS, CNRS, CSIC, HCMR

Final General Assembly – Paris, France – September 19, 2014 WP1 Project S/T Coordination WP1 Project S/T Coordination WP4 Targeted Experiments WP4 Targeted Experiments WP5 Observatory Infrastructure WP5 Observatory Infrastructure WP3 Scientific Innovation WP3 Scientific Innovation WP2 Integration in the GOOS WP2 Integration in the GOOS WP2.1 Assessment of a glider component in the GOOS WP2.2 Legal framework WP2.3 Financial framework WP3.3 Capacity building and training, outreach WP3.2 Data flow and processing WP3.1 New contributions of glider for marine research WP4.2 Fleet missions WP4.1 Endurance lines WP5.3 Mission planning and analysis WP5.2 Glider payload assessment WP5.1 Ground segment description WP1.1 Project coordination WP5.4 Estimated setup and running costs WP1.2 Internal & external communication WP4.3 Synergies with other platforms WP6 Project Management WP6 Project Management

Final General Assembly – Paris, France – September 19, 2014 WP4 Targeted Experiments Targeted deployments of gliders to assess glider capability in the context of GROOM Deployments in challenging environments contribute to other WP assessments We undertake in situ tests of protocols and data management developed in other WP

Final General Assembly – Paris, France – September 19, 2014 WP 4 Targeted Experiments Task 4.1: Endurance lines (includes trials of glider capability to do long-lasting repeat sections or virtual moorings) Task 4.2: Fleet missions (includes deployments to assess challenges of operating multiple gliders and optimising survey design) Task 4.3: Synergies with other platforms (includes experiments to assess how gliders can complement floats, moorings, VOS etc)

Final General Assembly – Paris, France – September 19, 2014 WP1 Project S/T Coordination WP1 Project S/T Coordination WP4 Targeted Experiments WP4 Targeted Experiments WP5 Observatory Infrastructure WP5 Observatory Infrastructure WP3 Scientific Innovation WP3 Scientific Innovation WP2 Integration in the GOOS WP2 Integration in the GOOS WP2.1 Assessment of a glider component in the GOOS WP2.2 Legal framework WP2.3 Financial framework WP3.3 Capacity building and training, outreach WP3.2 Data flow and processing WP3.1 New contributions of glider for marine research WP4.2 Fleet missions WP4.1 Endurance lines WP5.3 Mission planning and analysis WP5.2 Glider payload assessment WP5.1 Ground segment description WP1.1 Project coordination WP5.4 Estimated setup and running costs WP1.2 Internal & external communication WP4.3 Synergies with other platforms WP6 Project Management WP6 Project Management

Final General Assembly – Paris, France – September 19, 2014 Task 4.1: Endurance lines (includes trials of glider capability to do long-lasting repeat sections or virtual moorings) responsible person: Laurent Beguery, CNRS contributors: UPMC, SAMS, NERC, FMI, UEA, IFM-GEOMAR, UIB, AWI, UCY plan, execute and review trials of glider capability to undertake long-lasting repeat sections and to maintain virtual moorings. include challenging marine environments, to lay foundations for using gliders in the ocean observing system.

Final General Assembly – Paris, France – September 19, 2014 D4.1 Assess how existing hydrographic endurance line can be supported by glider infrastructure [complete; lead: David Smeed] D4.2[new] Undertaking and assessing glider deployments as components of GOOS according to GROOM standards [in progress; lead: Johannes Karstensen] formerly: D4.2 Deployments of European gliders in ROOSes that conform to GROOM standards D4.3 Endurance line test considering GROOM standards (gliderport, sensor calibration, data delivery, RTQC input) D4.7 Test and analysis of glider/float/mooring missions for GROOM standards Deliverables of Task 4.1

Final General Assembly – Paris, France – September 19, 2014

WP 4.1 / D4.1 The role of gliders in sustained observations of the ocean David Smeed (NOC), presented by Jan Kaiser (UEA)

Final General Assembly – Paris, France – September 19, 2014 Sustained ocean observations Motivation Opportunities and challenges for glider technology Examples of sustained observations from gliders Conclusions

Final General Assembly – Paris, France – September 19, 2014 Motivation CLIVAR program: "Maintain over many decades a sustained ocean observing system capable of detecting and documenting global climate change". Long-term perspective for climate research Long-term monitoring is a fundamental requirement of the European Union (EU) Marine Strategy Framework Directive (MSFD).

Final General Assembly – Paris, France – September 19, 2014 Sustained sub-surface observations Repeat sections, either hydrographic sections by research vessels; XBT sections from vessels of opportunity Fixed observatory sites – e.g. hydrographic data at Ocean Weather Ship Station (OWS) Mike in the Norwegian Sea since ARGO network of profiling floats

Final General Assembly – Paris, France – September 19, 2014 GO-SHIP reference sections

Final General Assembly – Paris, France – September 19, 2014 EuroSITES fixed point observatories

Final General Assembly – Paris, France – September 19, 2014 The ARGO programme

Final General Assembly – Paris, France – September 19, 2014 Opportunities and challenges for glider technology growing range of oceanographic sensors Argo profiling floats cannot sample at specific locations and little data is obtained on the continental slope GROOM partners have tested the capability of gliders to make sustained observations.

Final General Assembly – Paris, France – September 19, 2014 To provide more frequent sampling than is possible with available ship-time or budget. To obtain data with higher spatial resolution. To obtain data in real-time for data assimilation and for increased data security. Why use gliders?

Final General Assembly – Paris, France – September 19, projects run by GROOM partners in which gliders were trialed or are regularly used for sustained observations. In some cases, glider have replaced other platforms or enabled new programs to start But there are some cases where gliders were found to not yet be suitable or cost effective. Sustained observations by gliders in GROOM

Final General Assembly – Paris, France – September 19, 2014 Advantages –more frequent sampling per ship-time and budget –higher spatial resolution. –real-time data for assimilation and more data security Disadvantages –navigation in strong currents difficult –reliability –additional resources required –risks of collision with vessels Conclusions from GROOM missions

Final General Assembly – Paris, France – September 19, 2014 ships observations were biased to the summer months (see plot below) now: 3 years of quasi- continuous glider observations Example 1: The Balearic Channels in the western Mediterranean

Final General Assembly – Paris, France – September 19, 2014 RAPID requires continuous data, and the reliability of gliders was not sufficient to replace the moorings. Gliders effective for measuring near surface / very difficult with moored instruments Example 2: RAPID project at 26° N

Final General Assembly – Paris, France – September 19, 2014 The use of gliders is most successful when gliders can completely replace other platforms (e.g. Balearic Channel) there is easy access to deployment and recovery sites close to shore (e.g. Balearic Channel) it is only required to sample the upper 1000 m (e.g. shallow thermocline in the Mediterranean Sea; Ruiz et al., 2012). Conclusions 1

Final General Assembly – Paris, France – September 19, 2014 Types of sustained observation for which gliders are particularly well suited: real-time data thanks to glider data telemetry continental slope where Argo data are rare near surface where moored instruments are difficult to use Conclusions 2

Final General Assembly – Paris, France – September 19, 2014 Future needs include improved reliability (cf. APEX floats) increased depth capability (but: implies reduced repeat sampling frequency) increased endurance to make larger parts of the ocean accessible from individual glider ports Conclusions 3

Final General Assembly – Paris, France – September 19, 2014 WP1 Project S/T Coordination WP1 Project S/T Coordination WP4 Targeted Experiments WP4 Targeted Experiments WP5 Observatory Infrastructure WP5 Observatory Infrastructure WP3 Scientific Innovation WP3 Scientific Innovation WP2 Integration in the GOOS WP2 Integration in the GOOS WP2.1 Assessment of a glider component in the GOOS WP2.2 Legal framework WP2.3 Financial framework WP3.3 Capacity building and training, outreach WP3.2 Data flow and processing WP3.1 New contributions of glider for marine research WP4.2 Fleet missions WP4.1 Endurance lines WP5.3 Mission planning and analysis WP5.2 Glider payload assessment WP5.1 Ground segment description WP1.1 Project coordination WP5.4 Estimated setup and running costs WP1.2 Internal & external communication WP4.3 Synergies with other platforms WP6 Project Management WP6 Project Management

Final General Assembly – Paris, France – September 19, 2014 Task 4.2: Fleet missions responsible person: Alberto Alvarez contributors: NURC, UPMC, OGS, IFM-GEOMAR, CNRS, CSIC plan, execute and review trials of missions involving a fleet of at least 3 gliders simultaneously. define optimal sampling strategies (for example, glider swarms, how can we sample an eddy more efficiently with 2 gliders, 3 gliders or more). test auto piloting programmes, adaptive sampling strategies and OSSEs

Final General Assembly – Paris, France – September 19, 2014 D4.4 Field trial of a multi-glider campaign and dossier of lessons learned [complete; lead: Alberto Alvarez ] D4.5 Evaluation of prototype glider fleet mission planning tool [complete?!; lead: Laurent Beguery] Deliverables of Task 4.2

Final General Assembly – Paris, France – September 19, 2014

piloting system worked well environmental constraints (strong currents) remain limitation for gliders in future: -test automated pilot alarm system during glider malfunctions D4.4 Results

Final General Assembly – Paris, France – September 19, 2014 WP1 Project S/T Coordination WP1 Project S/T Coordination WP4 Targeted Experiments WP4 Targeted Experiments WP5 Observatory Infrastructure WP5 Observatory Infrastructure WP3 Scientific Innovation WP3 Scientific Innovation WP2 Integration in the GOOS WP2 Integration in the GOOS WP2.1 Assessment of a glider component in the GOOS WP2.2 Legal framework WP2.3 Financial framework WP3.3 Capacity building and training, outreach WP3.2 Data flow and processing WP3.1 New contributions of glider for marine research WP4.2 Fleet missions WP4.1 Endurance lines WP5.3 Mission planning and analysis WP5.2 Glider payload assessment WP5.1 Ground segment description WP1.1 Project coordination WP5.4 Estimated setup and running costs WP1.2 Internal & external communication WP4.3 Synergies with other platforms WP6 Project Management WP6 Project Management

Final General Assembly – Paris, France – September 19, 2014 Task 4.3: Synergies with other platforms Responsible person: Carlos Barrera, PLOCAN contributors: FMI, UEA, NERC, HCMR, OGS, UIB, GEOMAR, UCY, NURC, UPMC trial new sensors on gliders (linked with WP5) to assess their capability (for example, carbon cycle, turbulence, nutrients). compare different design strategies for gliders with Argo floats, moorings and ship-board studies compare sensor behaviours for each technique compared. test synergies between gliders and other components of the global ocean and coastal observing systems. demonstrate the in-field calibration protocols developed in WP5.2 (sensor payloads).

Final General Assembly – Paris, France – September 19, 2014 D4.6 Field trials of new sensors for gliders: New sensors for gliders are e.g. optics, video, acoustics [complete; lead: Fabrizio D'Ortenzio] D4.8 Report on the acoustic component in glider observatory [complete; lead: Agnieszka Beszczynska-Moeller] Deliverables of Task 4.3

Final General Assembly – Paris, France – September 19, 2014 /

780 Hz RAFOS sources better than 260 Hz choice of source manufacturer important in future: -use tomographic sources -improve positioning algorithm -reduce energy consumption D4.8 Results