F AEM - 22 Jan 07 Separator Spark History Ron Moore Fermilab – Tevatron Dept.

Slides:



Advertisements
Similar presentations
Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Advertisements

Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
F CDF UCSB - 11 May 06 Tevatron 101 A quick overview of the FNAL accelerator complex, Tevatron operations, and a few items of interest to those current.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Proton Source Repairs Dan Bollinger 2/1/10. Cockcroft-Walton accelerators FNAL has 2 Cockcroft-Walton Pre-accelerators (Pre-acc) that provide beam to.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
14 October 2010Eddy Jans 0 VELO-vacuum “problem” VELO Meeting On Sunday October 3 at 10h15 a sudden increase of a factor 6 of the pressure in the beam.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
F Tevatron Operations Ron Moore DOE Tevatron Operations Review March 27, 2007 SC-1 Breakout.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
Fermilab Run 2 Accelerator Status and Upgrades
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
The LHC - Status Is COLD Is almost fully commissioned
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Stores and Operations Summary Standard Plots
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Operations Department
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
LHC Beam Operations Past, Present and Future
07/08/2010 Fill #1264 dump at 02:14:38.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Friday 28 October 2011.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Saturday 26 November 2011.
Presentation transcript:

f AEM - 22 Jan 07 Separator Spark History Ron Moore Fermilab – Tevatron Dept.

f AEM - 22 Jan 07R. Moore - FNAL2 Overview Separator sparks can cause emittance growth and quenches via momentary orbit distortions –Beam separation decreases –Beam kicked into collimators History in HEP shots/stores since Nov 02 Based on spark counters –Confirmed with other effects: Schottky noise, emittance blow-up, vacuum in separator after spark Two groups –Flattop/squeeze: B17H and C17V run hardest –When colliding: everything else Click on link for Spark History on Tev Web SiteSpark History on Tev Web Site

f AEM - 22 Jan 07R. Moore - FNAL3 Separator Station Locations 27 separator modules – all stations have polarity switches B17 & C17 run hardest near flattop and in squeeze (120 kV/plate → 48 kV/cm) Units around IPs & D17 run hardest for collisions (≈100 kV/plate → 40 kV/cm) Horizontal# modulesVertical# modules A171 1 A491 2 B112 1 B174B481 C174 C491 2 D112 1 D481D172

71 entries 21 “store-killers” Thicker lines  sparks occurring closer together Shutdown

f AEM - 22 Jan 07R. Moore - FNAL5 B17H/C17V Run hardest on ramp and in squeeze No B17H-1, C17V-2, C17V-3 sparks C17V-1 most often –Shot 4084 quench Fewer sparks since Jan 05 – stopped ramping on pbar helix B17H-2 HEP spark 12/22/06 –Mistakenly on pbar flattop for short period before shot-setup

f AEM - 22 Jan 07R. Moore - FNAL6 B17H / C17V Shutdown Fewer sparks since Jan 05 – stopped ramping on pbar helix

f AEM - 22 Jan 07R. Moore - FNAL7 Dec 04 Startup During shutdown, polarity switches installed on all separators; C49/D11 aligned? After rash of sparks (trying larger helix) from normally OK seps (C49, D11), did another round of conditioning – some in wrong polarity - sparked next store This explains why we avoid changing polarities without reconditioning time

f AEM - 22 Jan 07R. Moore - FNAL8 B11H/V 13 incidents –11 “store killers” Note clumps… Spring 04 & Dec 04 –Trying larger collision helix –Start-up after 2004 shutdown Nov-Dec 05 –B11 separator RGA leak  higher cold beam tube + separator vacuum –Store 4515 spark led to B17 spool piece failure –Leaky feed-through replaced

f AEM - 22 Jan 07R. Moore - FNAL9 A49H/V A49V sparks when trying larger collision helix (Dec 04, spring 05) led us to replace A49 separators with better conditioned ones in 2006 New A49H-1 sparked 3 times soon after start-up…OK for few months Have not tried increasing voltage / enlarging helix since then 9 incidents 5 quenches 1 BIG emittance jump rendering store useless

f AEM - 22 Jan 07R. Moore - FNAL10 D17V D17V likely “contaminated” in October D32-5 failure - electrical arc through beam pipe  much of D sector had terrible vacuum for some time Sparked at low operating voltages, little impact on beam (fortunately) D17V was conditioned extensively during shutdown and subsequent E39 cryo leak repair Has finally settled down – no sparks in 2 months (insert kiss of death here)

f AEM - 22 Jan 07R. Moore - FNAL11 Summary 71 spark incidents in HEP operation in ≈4 years –Nearly 1/3 were “store-killers” = quenches or big lumi drop –≈40% were “self-inflicted” = higher voltages, poor vacuum, after conditioning in wrong polarity B17H and C17V separators spark less frequently up ramp/at flattop since stopping ramping on pbar helix (≈Jan 2005) Running with poor separator vacuum is not a good idea –See B11 incidents in Nov 05 –Take time to fix the problem right Be careful trying larger voltages and changing polarities –Don’t want store-killers becoming Tevatron-killers (avoid quenches)

f AEM - 22 Jan 07R. Moore - FNAL12 HV Electrode feedthru Titanium Sublimation Pump Flexible Support Rigid Support Heater Ion Pump Tevatron Electrostatic Separator Components This is a horizontal separator… …insulating blankets not shown

f AEM - 22 Jan 07R. Moore - FNAL13 Others 4 “store-killers” C49 mainly negative only D11 all but one during Dec 04 startup with larger helix