R.Ciaranfi 25/05/2011 1 NA62 CUSTOM PMT SOCKET FOR R7400 TUBE R. Ciaranfi.

Slides:



Advertisements
Similar presentations
Chapter 23 Circuits.
Advertisements

A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Introduction to Home Mortgages. Outline Process to purchase a home Process to purchase a home –Pre-approval Programs Programs What do Lenders look for?
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
Experiment 11: Non-Inverting Amplifier With Modifications that Require the Use of the Velleman Oscilloscope.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
PMT Modular HV Supply Design Status December 2003 Madison Instrumentation Workshop Nobuyoshi Kitamura UW-Madison.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
10.13 Series & Parallel Circuits. Series Circuits electric circuit in which the loads are arranged one after another in series. A series circuit has only.
RICH 17 m Beam Pipe Mirrors Separate pions from muons
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
GENPRO Electrics & Electronics. . Switch Mode Power Supply-Output : 100A / 60 V-6KW GENPRO Electrics & Electronics.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Photos of Rig. The FRB Stack The FRBs The SiPMs The PotentiometersDry Air Tube Cooling Pad Fixel Trigger Board FRB to BBB Ribbon Cables.
Standards S8P3c. Demonstrate the effect of simple machines (lever, inclined plane, pulley, wedge, screw, and wheel and axle) on work. On Level.
LUCID services G Avoni - D. Caforio LUCID BOLOGNA meeting1 Main topics: HV scheme (additional connections in pocket) Temperature probes New.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
JFET Biasing ELEC 121. January 2004ELEC 1212 JFET Fixed Bias R G is present to limit current in case V GG is connected with wrong polarity This would.
Experiment 10: Inverting Amplifier With Modifications that Require the Use of the Velleman Oscilloscope.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
Metering Modification to T&S code Cathal Kearney Protection & Metering 03/12/2015.
What’s NEWONE ? Areas of Business Product Lines Share the Vision.
Latest progress in PMT development VLVnT11 in October, 2011 Hamamatsu Photonics K.K. Electron Tube Division Yuji Hotta.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Real Estate Sales July Mobile & Baldwin County Single Family Residential Homes Sold - Trend DecFebAprJunAugOctDecFebAprJunAugOctNovDecJanFebMarAprMayJunJul.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
6/9/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts. It.
Spot Welder BY MOHAMED ABUZAID. Design Brief I will be building a spot welder. My spot welder will be able to weld two metal pieces together using electric.
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
DCal-ALICE integration and installation plan and status A. Tauro.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
Status procurement of PMTs Oleg Kalekin KM3NeT WPF/L General Meeting Amsterdam
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
"Drawer Mechanics - MiniDrawer"
JMU Dark Current Tests By: Kevin Nash.
Recent progress of PureCsI+APD readout
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011.
PMT cabling Gian Luca Raselli INFN Pavia
Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.
B. 163 facility upgrade: work space options in B. 163 and B. 103 F

University of Wisconsin-Madison / SSEC
HP Officejet Pro 8710 Printer setup for Mac. HP Printer Support Call Our Toll Free The HP Officejet Pro 8710 setup process is made quick.
BACK SOLUTION:
RPC HV&LV status Introduction HV power supply tender
Wiring the Light and Relay
Ideal vs Real Battery Ideal battery: no internal energy dissipation
NPS/CPS/COMCAL - Readout
Voltage Divider Circuit
First Test of Piezo-Supplies
NEGATIVE VOLTAGE POSITIVE.
What type of graph is this?
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
Divide 9 × by 3 ×
Presentation transcript:

R.Ciaranfi 25/05/ NA62 CUSTOM PMT SOCKET FOR R7400 TUBE R. Ciaranfi

25/05/ OUTLINE HAMAMATSU BASELINE HALOGEN FREE CABLE SOCKET PATCH CUSTOM MADE SOLUTION –PREVIOUS PROTO –DIFFERENCE PROTO VS HAMAMATSU –CURRENT BEST FIT COST AND TIME

R.Ciaranfi 25/05/ HALOGEN FREE CABLE LOW SMOKE HALOGEN FREE

R.Ciaranfi 25/05/ HAMAMATSU BASELINE 600 AVAILABLE PMT SOCKETS NEED MODIFICATION (JUNCTION) NEW 1400 SOCKETS WITH 2 M OF RG174 = 77 € (108K€) –NO HALOGEN FREE CABLE –WITH ALOGEN FREE WE SUPPOSE AN EXTRA COST WE NEED A SOLUTION TO USE HALOGEN FREE CABLES

R.Ciaranfi 25/05/ SOCKET PATCH INTERMEDIATE SOLUTION TO USE HALOGEN FREE CABLE RG174 HALOGEN FREE RESIN POTTING HV WIRING HALOGEN FREE Dscn6482.JPG PIN HV DIVIDER INCLUDED 66€ SOCKET ONLY

R.Ciaranfi 25/05/ CUSTOM MADE DUE TO MANUAL WORKING NEEDED FOR ASSEMBLY AND POTTING WE EXPLORE A COMPLETELY CUSTOM SOCKET DURING VERY PRELIMINARY TESTS WE BUILT SOME HOME MADE PMT SOCKETS AND NO DIFFERENCE WAS FOUND IN PERFORMANCES VERSUS HAMAMATSU SOCKET (WE COULD FURTHER INVESTIGATE ON THIS ITEM) Old_infn_proto_00-pdf WITH A CUSTOM PMT SOCKET WE CAN REDUCE POWER SUPPLY CURRENT REQUIREMENTS AND DISSIPATE LESS POWER ON VOLTAGE DIVIDER AND PMT FLANGE

R.Ciaranfi 25/05/ COST AND WORK PRICE NOT YET AVAILABLE 6 MONTH EQUIVALENT