TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: Vegetation and visual impact The aim of this presentation is to provide stakeholders.

Slides:



Advertisements
Similar presentations
Native Vegetation Act operation in practice and biodiversity protection in fire prone areas Craig Whisson Department of Water Land and Biodiversity Conservation.
Advertisements

TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.
Current Tukwila Tree Policies & Regulations. Comprehensive Plan Goals and Policies Related to Trees/Landscape (1) Vegetated hillsides and freeway corridors.
Does effective policy change require a change in culture? Some observations from the South Australian native vegetation management program Tim Dendy Manager,
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Sustainable Construction
1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.
Queensland Wild Rivers Policy and legislation Scott Buchanan Team Leader (Wild Rivers)
Catchment Management Protecting Sydney’s Water Supply.
INSPECTION PENRICE ANGASTON QUARRY OPERATION Thursday 19 February 2009.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
0 CCG Meeting Angaston 3 rd December Penrice CCG Meeting Action Arising BLAST MONITORING Chris Linke Monitor Site Blast Data 21/11/09 60 holes located.
Phytophthora Dieback The biological bulldozer Adapted from presentations by Dr Chris Dunne, Science Division, DEC.
| pg 1 NSW Planning & Environment Upper Hunter Mining Dialogue Presentation th October 2014 Presented by Scott Brooks, Team Leader, Compliance.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING October 15, 2014|3:00PM -5:00PM | ROOM 1E-113.
Community consultation 3 September – 10 December 2012 Draft ACT Nature Conservation Strategy.
Environmental Management Plan. Background Environmental Impact Assessment has made commitments to: –Meet defined standards –Implement defined mitigation.
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
One Land – Many Stories: Prospectus of Investment Department of Sustainability, Environment, Water, Population and Communities December
Reforms to Victoria’s native vegetation permitted clearing regulations.
LID and Green Infrastructure: What to Expect if You’re Expecting American Basin Council of Watersheds October 6, 2010 Loomis, California.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES GETTING STARTED Forms, Procedures and Guidelines Application for Authorisation.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Workshop and Information Session Mining Operations.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Senior Geography Project
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Angas Zinc Project: traffic Raised as a concern through Stakeholder consultation process Dominant source.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
1 Short Term MPL – Western Area PCCG Meeting 3 rd December 2008.
Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of the environment  Prudent use of natural.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Schools Property Planning Competition 2013 “Waitara”
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Walker River Basin Project Agriculture, Restoration, and Plant/Soil/Water Interactions Tasks 4 & 5 Summary2008.
TERRAMIN AUSTRALIA Limited
Intelligent Energy for Europe 2009 Good practice in reconciling onshore and offshore wind energy with environmental objectives GPWIND.
Baseline Data from Survey The survey established baseline data on vegetation, Mammals, Birds, amphibians, reptiles, and invertebrates. – no known protected.
Iron Ore Holdings Ltd Buckland Project & Northern Quoll: adaptive mine design and management 30 July
Proposed Amendments to Chapter 32 Article V Solid Waste Management and Chapter 38 Zoning 5:01 P.M. Public Hearing Presented by the Orange County Environmental.
Commercial Obligations Community Obligations Integrity Innovation Accountability Collaboration Individual Community Business Infrastructure Energy & Resources.
Responding to Wind Farm Applications Ian Aikman Major Applications, Review & Enforcement Manager Scottish Borders Council.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Eric Sommerville Presiding Member, Northern and Yorke Natural Resources Management Board Sustainable Agriculture; Farmers Engaged in Natural Resource Management.
BIOSIS RESEARCH PTY. LTD. Natural & Cultural Heritage Consultants A DECADE OF NET GAIN Aaron Harvey
Developing the Land Growing Biodiversity Conservation.
ENVIRONMENTAL MANAGEMENT REQUIREMENTS. ISO GOU has obtained certification for ISO 14001:2004 All contractors to be ISO compliant.
0 Sustainability – Net Positive Environmental and Social Gains from Mining Reuben Mills, Director Health Safety & Environment October.
QKR Namibia Navachab Gold Mine
Planning & Management of Wetland Resources
Our Mission We work with landowners, communities, and organizations to protect lakes and rivers through developing effective, transferable, long-term solutions.
Ensuring Environmental Sensitivity in New Project Development
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
4.1.5 The potential impact on society and outdoor environments of land degradation, introduced species, climate change, urbanisation and other significant.
Environmental Impact Assessments
Latin America and Caribbean Region
EQ: How do humans add to the erosion process?
Northern Quoll, Dasyurus hallucatus
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Mordialloc Bypass Project
EQ: How do humans add to the erosion process?
Santa Teresa Landfill and Remediation Project
Presentation transcript:

TERRAMIN AUSTRALIA Limited Angas Zinc Project

The Angas Zinc Project: Vegetation and visual impact The aim of this presentation is to provide stakeholders with a clear image of the process and outcomes of the Angas Zinc Project with respect to vegetation & visual amenity related issuesThe aim of this presentation is to provide stakeholders with a clear image of the process and outcomes of the Angas Zinc Project with respect to vegetation & visual amenity related issues –Current condition: vegetation, visual impact –Proposed development: changes to current vegetation lay out, proposed structural changes to site

The Angas Zinc Project: Vegetation and visual impact The construction of a mine will inevitably change the visual landscape of the site.The construction of a mine will inevitably change the visual landscape of the site. The goal is to achieve a positive visual impact during operations and on closureThe goal is to achieve a positive visual impact during operations and on closure

Vegetation survey Matt Rose: Natural StateMatt Rose: Natural State –Experienced native vegetation specialist, locally based –Recognised expertise in survey, cultivation, planting & maintenance of native vegetation

Revegetation Domains

Effluent ponds/Tuckers Swamp (Northern Domain) No operational impact on this DomainNo operational impact on this Domain –Effluent ponds/Tuckers Swamp –Significant remnant habitat: River Red Gums, Lignum shrub To be preserved in current conditionTo be preserved in current condition

Operating Domains (Central & Southern) Current quarry/proposed box cut, plant and TSF Site vegetation - severely degraded with respect to natural conditionSite vegetation - severely degraded with respect to natural condition –Broad-acre cropping – TSF area –Majority of vegetation introduced, weeds –Small remnant vegetation patches; native grasses –Only significant trees: Dryland Tea Trees

Significant vegetation

Habitat quality of existing vegetation

Revegetation Objective Objectives (short & long term)Objectives (short & long term) –Significant increase environmental benefit (SEB) –Remove feral habitat –Significantly reduce noise, dust –Improve habitat quality –Increase biodiversity –Significantly improve visual amenity

Revegetation Program Contouring sound barriers to mergeContouring sound barriers to merge Revegetation planningRevegetation planning –What and when to plant; Matt Rose Commence before construction startsCommence before construction starts Ongoing for life of mineOngoing for life of mine Included in closure planningIncluded in closure planning Total of 6,615 new plantsTotal of 6,615 new plants

Revegetation program Highlighted areas are the domain based plans for the revegetation plan

Vegetation outcome OutcomeOutcome –Avoid loss of biodiversity through clearance of native vegetation. Significant environmental benefit (SEB) will be provided to increase biodiversity CriteriaCriteria –Periodic (at least annual) photographic evidence for specified photo monitoring sites will show no clearance of native vegetation. If vegetation is cleared, SEB will be provided in accordance with approved Native Vegetation Council guidelines

Visual amenity

Visual amenity- current site

Current site

Artists impression

Artist impression

Visual amenity Minimising impacts of proposed structuresMinimising impacts of proposed structures –Placement & design of all structures is being developed to minimise impact on visual amenity –Placement in box cut, low lying ground –Infrastructure painted in neutral (green) tones –Revegetation planning, bunding –Night lighting focused down –Topsoil stockpiles <2.5m –Waste rock stockpiles <10m

Visual amenity The TSF is the most difficult structure to “hide”. Revegetation begins day 1The TSF is the most difficult structure to “hide”. Revegetation begins day 1 Measures to mitigate include:Measures to mitigate include: –Use of low lying ground to reduce height relative to undisturbed ground –TSF capping trials start Year 1

Artists impression: TSF Closure

Visual amenity: Outcome OutcomeOutcome –improve visual impact & amenity of site CriteriaCriteria –photo monitoring points to indicate visual amenity of site improved relative to initial condition; monitoring points to be determined in consultation with the CCC