Unyielding commitment to REJUVENATION REVIVAL RENAISSANCE TRANSFORMATION Rand Water Tariff Consultation Meeting Mining & Industry 22 October 2014 Proposed.

Slides:



Advertisements
Similar presentations
TCTA A new word for water 2012/2013 Bulk potable water tariffs setting forum October 2011.
Advertisements

Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
RFT NO.: TCTA/PFT/FMA/2013/25
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
October 29,  Fiscal Risks identified and quantified in Mexico: ◦ Budgetary impact of fluctuations in key assumed macro-economic variables ◦ Long-term.
AUDITED GROUP RESULTS for the year ended 31 March 2005.
Medium Term Financial Plan (MTFP) April MTFP The MTFP is a high-level forecasting model that enables the Council to assess the financial direction.
NHA | ADVISORS Strategy. Innovation. Solutions. Pajaro Valley Water Management Agency Financial Review and Initial Assessment October 22, 2014.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
J. K. Dietrich - FBE Fall, 2005 Interest Rates: Basic Determinants Week 5 – September 28, 2005.
To view a full-screen figure during a class, click the red “expand” button.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Financing Urban Public Infrastructure
NATIONAL BANK OF AZERBAIJAN KHAGANI ABDULLAYEV, EXECUTIVE DIRECTOR.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 DOMESTIC INVESTOR ROADSHOW March 2010 National Treasury.
Securitisation and the Danish mortgage credit system WPFS WORKSHOP ON SECURITISATION Madrid, May 2010 Maria Jose Alvarez Pelaez.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
CAPITAL BUDGETING INITIAL INVESTMENT PLANNING HORIZON TERMINAL VALUE REQUIRED RATE OF RETURN NET CASH FLOWS.
M UNICIPAL O RIENTATION The Finance Function Scott Ryan, February 17, 2007.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Water Services Reform – the Durban experience : successes and challenges Neil Macleod Durban South Africa.
O V E R B E R G W A T E R. 1.AREAS AND MUNICIPALITIES SERVED, ACHIEVEMENTS AND CHALLENGES  Relationship with Municipalities  Non-Financial Performance.
Copyright © 2012 Pearson Education Chapter 6 Interest Rates And Bond Valuation.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital 11.
Responses to Inflation Kenneth A. Carow, PhD, CFA Indianapolis, IN October 12, 2015.
WHAT’S CHANGED POST THE FINANCIAL SUSTAINABILITY INQUIRY? FMG Seminar 27 March 2009 Presented by John Comrie.
Understand the role of business in the global economy. 1 All Images Compliments of
Debt Strategy Presentation to City Council May 10, 2004 Click to edit Master title style.
Mott Community College Board of Trustees Committee of the Whole Meeting June 27, 2011 BUDGET RESOLUTIONS.
Copyright © 2010 Pearson Education Canada. In 2007, the federal government spent 15 cents of each dollar Canadians earned and collected 16 cents of.
Copyright © 2006 Pearson Addison-Wesley. All rights reserved Preview What is money? Control of the supply of money The demand for money A model of.
IMFO Conference – Cape Town “Implementing Financial Best Practice” Presented by: Mike Richardson Chief Financial Officer September 2011.
1 Chapter 12 Budget Balance and Government Debt. 2 Budget Terms A Budget Surplus exists when Tax Revenues are greater than expenditures and is the difference.
DWA CONSOLIDATED REPORT ON THE PERFORMANCE OF THE TRANS CALEDON TUNNEL AUTHORITY (TCTA) AND THE WATER RESEARCH COMMISSION (WRC):2011/12 FINANCIAL YEAR.
Financial Markets, Instruments, and Market Makers Chapter 3 © 2003 South-Western/Thomson Learning.
Credit Risk transfer OECD-IAIS-ASSAL Fourth Conference on Insurance Regulation and Supervision in Latin America Punta Cana, Dominican Republic, May 6 th.
PRESENTATION TITLE Presented by: Name Surname Directorate Date BRIEFING OF THE SELECTION PANEL FOR WATER SECTOR ENTITIES Name Surname: MR ANIL SINGH Designation:
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Presentation by Ms Z Mathe Chief Director: Water Trading Entity January 2011 Presentation to the Portfolio Committee: Water & Environment Financial.
Presentation to Select Committee on Economic Development
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
BBPW3203 FINANCIAL MANAGEMENT II By : DANIZAH BINTI CHE DIN H/P : CLASS : TUTORIAL 1 – 12/1/2013 TUTORIAL 2 – 23/2/2013.
PENGURUSAN ASET AIR BERHAD (PAAB) Briefing to Analysts 19 MARCH 2009.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
PRESENTATION TITLE Presented by: Name Surname Directorate Date WATER RESEARCH COMMISSION ANNUAL PERFORMANCE PLAN PRESENTATION 2015/16 Presented by: Dhesigen.
PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS MAHOMED VAWDA Acting Chief Director: Institutional Oversight Dept of Water Affairs Dept of Water.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Council Improvement Plan Council Meeting 1 June
Rand Water TARIFF CONSULTATION OCTOBER DWS / TCTA raw water pricing30 th September 2016 Customer consultation and information sharing Consultation.
Rand Water Annual Tariff Consultation October 2016
Pricing Strategy for raw water use charges and Norms and Standards for
NERSA presentation at the PPC meeting held on 24 May 2006
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Budget Balance and Government Debt
The establishment of a funding strategy for your Municipality
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 18 October 2017.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Raw Water Use Charges for 2016/17 Financial Year
Major Vaal River Consultation Meeting Raw Water Use Charges for 2019/20 Financial Year 24 October 2018.
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 02 November 2017.
Presentation transcript:

Unyielding commitment to REJUVENATION REVIVAL RENAISSANCE TRANSFORMATION Rand Water Tariff Consultation Meeting Mining & Industry 22 October 2014 Proposed CUC and BO&R charges for inclusion in the Bulk Raw Water Charges for 2015/16

2 Purpose of the presentation Categories of bulk raw water charges Purpose of the CUC and BO&R charges Stakeholders’ objectives Tariff objectives Principal assumptions & inputs Tariff principles & methodology Proposed CUC and BO&R charges for 2015/16 Debt analysis

Discuss purposes for which the CUC is levied on the VRS Discuss the principles and method applied to the setting of the CUC Present the assumptions and inputs underlying the proposed charges Present the proposed CUC and BO&R charges for 2015/16 Discuss implications for the debt of the VRS augmentation schemes 3

Tariff categories for off-budget schemes: Capital Unit Charges (to repay debt) Bulk Operating and Royalties Charge (to repay royalties and bulk O&M) Water Use Charges (statutory charges as per Pricing Strategy) Operations and Maintenance Charges (State schemes portion) Betterment and Refurbishment Charges (if applicable) CUC and BO&R recovers: Capital expenditure Funding costs Administration costs (TCTA, LHDA, LHWC) Royalties Bulk O&M (not included in DWS O&M) 4 4

5 The CUC recovers the cost of off-budget schemes in the VRS as provided for in the Pricing Strategy Costs to be recovered over a period not exceeding 20 years after implementation of latest augmentation scheme Current schemes in the VRS: LHWP-1management of current ongoing debt obligations LHWP-2next Lesotho scheme to augment the yield of the VRS AMDGovernment waterworks to mitigate the effects of acid mine drainage in the VRS and augment the yield of the VRS Bulk operations (O&M on non-state schemes) Royalties – paid to Lesotho in terms of Treaty

TCTA Secured income stream Contractual right to pass tariffs through to DWA Sustainable projects Banks and Investors Timeous repayment of loan SARB Administered prices for inflation targeting National Treasury Government’s risk protected - Bankable project Affordable services to the people Sustainable debt levels in the water sector - debt overlap Responsible utilisation of state guarantees DWS Inflationary increases in raw water as start of water chain input cost Affordability and predictability to end-users Uncomplicated annual tariff consultations – inflationary increases Water demand management incentive (pay on actual use) No cross subsidisation between projects – transparency of costs Compliance with Water Pricing Strategy 6

SALGA Inflationary increases Fair tariff structures Municipalities Limited to inflationary increases, including raw water components DWS expects TCTA to support this objective Municipality and Council pressure to keep increases low Water sector and end users Tariff stability and predictability Affordable water Inflationary increases acceptable No cross subsidisation between projects – transparency of costs Annual tariff consultation to approve tariff adjustments DWS SARB National Treasury Stakeholders (Rand Water, Major off-takers, SALGA) Banks informed 7

End user affordability Debt outstanding Considerations to support end user affordability: Under recovering in early years End-user pays on actual use Constant tariff in real terms approach – CPI targeting Phasing-in of large tariff adjustments over 2-3 years Take account of future augmentation – future affordability No reserves built into tariffs Actual cost transfer – TCTA not profit taking Considerations to support debt management: +20 year repayment period Peak of debt in relation to value of asset (limit interest capitalisation) Risk transfer to end-user – trigger adjustments if input assumptions change Water sector debt profile – debt overlap with future schemes Interest rates mostly fixed Utilisation of explicit Government guarantees and impact on National Treasury 8

9 Inflationary adjustment CPI annually (May index) CPI Cap and floor levels Tariff review triggers Variances between budget and actual for previous year Changes in capital cost Changes in water demand Changes in funding cost Changes in timing and cost of future augmentation schemes (dependant on system yield) Changes in regulatory or legislative environment Changes to operations and maintenance costs (TCTA and LHDA O&M) Changes in any input assumptions that increase/decrease final repayment date 4.5% Negotiated adjustment 7.5% Automatic adjustment Floor Cap

Previously TCTA accounted for and determined capital tariffs for each sub- component of the Vaal River System in isolation (e.g L:HWP-1, LHWP-2 etc.) This approach resulted in an accumulation of tariffs required to repay the sub- components simultaneously when there was a debt overlap period – when LHWP- 2 phasing-in was introduced, the debt overlap between LHWP-1 and LHWP-2 was severe To address the tariff affordability, smoothing of the tariff was considered to take account of the augmentation required in the Vaal River System TCTA’s funding programme and borrowing limit for all sub-phases of the Vaal River System has been combined to accommodate a smoothed tariff approach To give effect to the integrated system’s tariff approach, a single system capital tariff is therefore charged whereby the combined debt of the Vaal River System will be repaid through a single capital tariff 10

11

Supports end-user affordability No further phase-in of tariffs for augmentation schemes during construction is required Extended debt repayment period The debt repayment period of LHWP-1 is extended to the debt repayment period of LHWP-2, supporting end-user affordability Smoothed tariff profile Large fluctuations in water tariffs are reduced as tariffs won’t increase sharply with new augmentation and won’t drop after repayment of a sub-component Current tariff sufficient The current Vaal River capital tariff can cover current and future debt repayments (unless input assumptions change substantially) TCTA will continue to account and manage costs separately as required by National Treasury and DWS Project costs will be apportioned proportionally 12

Borrowing limit DWS and National Treasury awarded a higher borrowing limit to TCTA resulting in lower tariffs to end-users as interest capitalisation will be allowed to assist with end- user affordability Peak of debt Although the debt will peak higher, the revenue stream will be sufficient to repay the combined debt within 20-years from completion of LHWP-2 Combined funding programme By combining the capital market bond programme for LHWP-1 with further augmentation, TCTA will increase liquidity in its bonds, resulting in lower funding costs and it will enhance access to funding by having one strong set of bonds in the market Security to raise funding Government extended the explicit government guarantee to TCTA to cover the funding of the Vaal River System augmentation works – resulting in lower tariffs due to good credit 13

Capital unit charge (CUC) single integrated tariff combining capital expenditure in the Vaal River System covering capex, funding costs and admin costs maximum debt repayment period 20-years post completion of construction allows for interest capitalisation set within approved borrowing limit parameters smoothed tariff profile – tariff predictability based on forecast long-term use from the Vaal River System takes account of future augmentation required within 20-years window annual over and under recoveries spread over debt repayment period – decreased tariff fluctuations charged by DWS, paid to TCTA Bulk Operating and Royalties charge (BO&RC) covering royalties and O&M relating to all the bulk water infrastructure set to recover annual expenditure on an annual break-even tariff determination continues after debt repayment charged by DWS, paid to TCTA 14

Other considerations National Water Pricing Strategy Administered prices – inflation targeting Stakeholder consultation outcomes Affordability to end-users phasing-in of large adjustments allowance for capitalisation of interest in early years Input data supplied to TCTA as follows: BER: long-term economic forecasts (inflation, real interest rates) DWS: water demand forecasts (high and low scenarios) system yields future schemes timing and projected costs 15

Input data Demand, system yield, economic fundamentals, cost and timing of future augmentation schemes Long-term projections DWS compiles long-term demand projections based on coordinated approach with DWS – various departments involved, Water Boards’ Planning and Budgeting departments, Large industrial users, Muni’s etc. Sensitivity Analysis Inflation, real interest rate, timing of future augmentation schemes and repayment periods Stress Testing Lower inflation, changes in yield of system, higher real interest rate, zero growth in demand etc Stakeholder validation Demand projections, system yield, economic fundamentals, cost and timing of future augmentation schemes Consultation with National Treasury and SARB On administered prices Consultation with DWS management structure Rand Water Services Forum Other Major stakeholder forums Tariff setting process Planning process Sensitivity Analysis & Stress Testing Consultation Participation 16

17

18 Sub-PhaseCapital cost (cost at completion) Contribution from fiscus Contribution by mines Implementation Period LHWP-1R 19 billion (current outstanding debt) -Historical LHWP-2R 12.7 billion (water delivery 2022) AMD short- term works R 2.3 billionR 456 million Incl O&M up to March 2015 R 400 million Land, pumps, use of infrastructure etc AMD long- term works R 7.9 billion Total Capital Expenditure R 42 billion

Inter-Ministerial decision indicated that the Vaal River System tariff will be a contributor to the cost recovery of the AMD project Fiscal funding is limited and Government considered alternatives to fund AMD and to limit the impact on the Vaal River Users as follows: Fiscal funding contribution of R 456 million Negotiations with existing mines to contribute infrastructure, land etc value R 400 million Provide an explicit government guarantee to limit funding costs Allowed an increased borrowing limit to allow for interest capitalisation in early years to smooth the tariff impact Extended debt repayment period for LHWP-1 to allow for smoothing of tariff National Treasury expressed commitment to investigate potential environmental levy on mines to contribute in future DWS committed to introduce the Waste Discharge charge on polluters to contribute in the future Smoothed impact on users between capital charges and increase in O&M on AMD DWS committed to implement potential other cost recovery mechanisms e.g. selling of water/products etc 19

/16 Tariff R/m /15 Tariff R/m 3 Weighted Average Increase % a) Costs: i) State Schemes Existing Vaal AMD R R R R % New tariff R0.772R ii) Augmentation schemes CUC BO&R R 1.69 R 0.60 R 1.80 R 0.52 (6.1 %) 15.9 % R 2.29R 2.32 Total State and Augmentation SchemesR 3.062R % b) Bulk Raw Water Tariff: i) Total development and use of waterworksR 3.062R % Focus is to keep this weighted average impact as low as possible

21 CUC Combined systems tariff to repay all capital projects in Vaal River System Proposed decrease in the Vaal River System CUC component to balance out the impact of the increase in O&M due to AMD May 2014 CPI falls within the cap and floor level of 4.5% and 7.5% at 6.6% y-o-y Should actual tender prices for LHWP-2 and AMD long-term be substantially different which results in a breach of the Government guarantee limit, an increase in excess of CPI will be passed on from 2016/17 Future increases after the peak of the debt could be curbed to stretch the repayment period should the debt be repaid before further augmentation is required Bulk Operating and Royalties Charge Covers bulk O&M on portion of LHWP in South Africa, royalties and operating costs of LHWC and LHDA Tariff introduced in 2014/15 - over or under recovery for 2014/15 will realise by March 2015 and will be taken into account in the 2016/17 tariff – therefore no over/under recovery in 2015/16 Is set to recover costs on an annual basis – Royalty increases linked to PPI and energy cost LHWC and LHDA operating costs increased more than CPI due to LHWP-II activities increasing Increase of 15.9% required for 2015/16

22

23

The debt curve is net of financial assets Borrowing limit exposure exclude financial assets resulting in peaks in the years where TCTA has large bond maturities and has a redemption strategy in place TCTA needs to operate within the borrowing limit (growing to R 42,5 billion) and government guarantee (R 43 billion) On all the scenarios, the debt peaks between R 30 and R 35 billion and the borrowing limit is not substantially exceeded, a change in redemption strategy could successfully manage the peaks to stay within the borrowing limit Passing on CPI will be in line with the constant tariff in real terms approach applied to the Vaal River tariff previously 24

TCTA will not exceed the borrowing limit or guarantee should only CPI be passed on for 2015/16, based on current assumptions (CUC and AMD O&M combined) The risk of passing on only CPI in 2015/16 is that the capital cost of LHWP-2 and the AMD long-term could be substantially higher once confirmed after tender process, which will require an increase in excess of CPI in the following year CPI increase supports end-user affordability No additional phasing-in of LHWP-2 tariff for this year No additional triggers required 25

26 Contacts: Nhlanhla Nkabinde Project Finance Specialist Alicia Keyser Senior Project Finance Manager Telephone: (012)