Relevance & Application in Support to Rural Water Supply and Sanitation Project for Low Income States.

Slides:



Advertisements
Similar presentations
Outcome mapping in child rights-based programming
Advertisements

Ministry of Local Development (MoLD)
COMMONWEALTH YOUTH PROGRAMME AFRICA CENTRE COMMONWEALTH SECRETARIAT Youth Enterprise Development and Youth Employment Experiences and Lessons from Commonwealth.
UNITED NATIONS’ RESPONSE TO THE
Good governance for water, sanitation and hygiene services
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
GHULAM DASTGIR KHAN LAND ACQUISITION AND SOCIAL IMPACTS ANALYST NATIONAL AND REGIONAL RESOURCE CORRIDORS PROGRAM SECRETARIAT MINISTRY OF MINES GHULAM DASTGIR.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
Lessons from Inspection Panel cases Alf Jerve, Panel Member October 9, 2013 The Inspection Panel Indigenous Peoples’ Lands and Development:
Introduction to World Bank Safeguard Policies and Project Preparation
ENVIRONMENTAL MANAGEMENT PLAN
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
The participants should have understood the following basic principles: Integrating gender considerations into project design and implementation Assessing.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Planning for Resettlement 0P 4.12 Instruments. Resettlement and Development No mitigation: Those losing land must make a sacrifice for national development.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Working Group 4: Urban Governance for Risk Reduction: Mainstreaming Adaptation into Urban Planning and Development Chair: Prof. Shabbir Cheema Rapporteurs:
BioCarbon Fund Projects and World Bank Safeguard Policies Jean-Roger Mercier September 12, 2005.
Women’s Networks drive the demand for Pro-Poor Disaster Resilience AWID 2012.
Gender and the Forest Investment Program Stacy Alboher Linda Mossop-Rousseau FIP Pilot Countries Meeting Cape Town, June 22, 2011.
Key Elements of Legislation For Disaster Risk Reduction Second Meeting of Asian Advisory Group of Parliamentarians for DRR 5-7 February, 2014, Vientiane,
Rural poverty reduction: IFAD’s role and focus Consultation on the 7 th replenishment of IFAD’s resources.
Community Participation in Recovery Jon Bennett Director, Oxford Development Consultants Wenchuan Earthquake Response, China Workshop, July 14-15, 2008,
Partnership as a tool to green regional development programmes Gottfried Lamers Federal Ministry of Agriculture, Forestry, Environment and Water Management.
Natural Resources Management and Environment Department FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS Attaher Maiga FAO representative
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
Development with Disabled Network Mainstreaming Disability into Community Governance System Asitha Weweldeniya, Weweldenige, Development with Disabled.
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Mastewal Yami Post Doctoral Fellow: Social and Institutional Scientist Challenges to Investment in Irrigation in Ethiopia: Lessons.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW Meeting, April – May 2013.
BioCarbon Fund Projects and World Bank Safeguards Jean-Roger Mercier July 11, 2005.
Welcome to Save the Children’s Presentation on Household Economic and Food Security of Extreme Poor me to Save the Children’s Presentation on Household.
Ud Strategic Plan 2009/10 – 2011/12 Presentation to the Portfolio Committee.
HUMAN RIGHS BASED APPROACH TO PROGRAMMING 22 November 2011 Barbro Svedberg.
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
CED 410: The Global Seminar Spring 2015 Emily J. Wornell.
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
Involuntary Resettlement 0P 4.12 Principles and Objectives WB Safeguards Training Workshop Tbilisi, May 2013.
DEPARTMENT OF AGRICULTURE, FORESTRY AND FISHERIES COMPREHENSIVE AGRICULTURAL SUPPORT PROGRAMME IMPACT EVALUATION 20 OCTOBER 2015.
Knowledge Share Fair Cameroon IFAD-CBARDP NIGERIA By Bukar Tijani National Programme Coordinator KNOWLEDGE SHARING ON SUCCESSES AND LESSONS LEARNED.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
INTRODUCTION: World Bank Environmental and Social Safeguard Policies Training Workshop for Financial Intermediaries and Implementing Agencies May-June,
Kathy Corbiere Service Delivery and Performance Commission
Socially Sustainable Development, May 2002 Responsive, Reliable, Resilient Social Aspects of Sustainable Development Steen Lau Jørgensen Social Development.
DEVELOPING THE WORK PLAN
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
PARTICIPATORY GOVERNANCE ASSESSMENT (PGA) OVERVIEW OF PILOT RESEARCH IN CROSS RIVER STATE, NIGERIA Tony Atah, UN-REDD+ Stakeholder Engagement Specialist.
Module Land Acquisition and Resettlement Best Practices and Safeguards. Overall Safeguards presentation Jayantha Perera, PhD 1.
Gender-Responsive NAP Processes
Joint Principles for Adaptation (JPAs) By Marlene/Rudolf
Stakeholder consultations
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Overview Rationale Context and Linkages Objectives Commitments
Lecture 9: PHC As a Strategy For HP Dr J. Sitali
Involuntary Resettlement 0P 4.12: Planning Instruments
Consultation & Participation
Overview Rationale Context and Linkages Objectives Commitments
World Bank project example
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Social Safeguards “Procedures and approaches that can help to ensure that “do no harm” to people or the environment, but rather enhance social and environmental.
Presentation transcript:

Relevance & Application in Support to Rural Water Supply and Sanitation Project for Low Income States

 World Bank’s Partners and Owners have a commitment  to ensure that people and the environment are not harmed as a result of its financing  Previous Bank emphasis: “Do no harm” Now promoting: “Do good”  In our view:  Better embody Social and Environmental Considerations  reduce and manage risk  save money and time

ENVIRONMENTSOCIALENVIRONMENT- Related (LEGAL) Environmental Assessment Public Disclosure (All EA and Social Reports prepared by borrower needs to be disclosed) Natural HabitatsInvoluntary Resettlement International Waterways Forestry Indigenous People Pest ManagementDam Safety Physical Cultural ResourcesDisputed Areas

More Sustainable Assets StrongerEnvironmental, Social and Economic linkages Stronger Environmental, Social and Economic linkages

Paying attention to Safeguard Policies can avoid problems and add value ◦ Reduces unforeseen issues/ problems ◦ Improves relations with local communities ◦ Prevents delays and stoppages ◦ Prevents legal disputes ◦ Provides good publicity ◦ Allows for good corporate image ◦ Reduces financial costs (time and money)

(OP) Involuntary Resettlement : Though no land will be acquired involuntarily and hence Operational Policy (OP) not triggered, however, certain rules will prevail OP Indigenous Peoples : ‘Tribals’ in one of the four states viz., Jharkhand and hence a Tribal Development Plan (TDP) has been prepared.

 The Borrower prepares SA, SMP and SMF reports  To ensure that ◦ Project is socially sound/sustainable ◦ The development interventions contribute for accomplishing Inclusion, Equity and Cohesion ◦ Project is responsive, specially, for Poor and Vulnerable Sections – maximizing benefits, simultaneously, minimizing adverse effects and risks ◦ Decision-making based on  Appropriate analysis of actions  Likely social impacts and mitigation measures in the form of SMPs  It is ensured that World Bank safeguard policies are complied with in the project  SA helps in developing SMF and based on SMF application – individual SMPs are prepared for each scheme to influence planning, design and implementation arrangements  Borrower as well ensures consultation with stakeholders while preparation.  Disclosures and dissemination through websites / consultation workshops

 Identifying and analyzing ◦ key social issues and related factors that have a bearing on the achievement of project objectives  Based on this analysis ◦ providing suitable inputs to the design of the project to ensure sustainable and equitable flow of benefits to project populations in general, and vulnerable groups in particular

 What is Social Management Framework (SMF): ◦ SMF is the instrument that provides the necessary guidance to identify and address the potential social concerns or impacts of a project right from the planning stage to its implementation and post- implementation operations  Why SMF: The main purpose of preparing SMF is to ensure that ◦ Social safeguard principles are fully mainstreamed in project planning, implementation and monitoring; and ◦ The potential adverse impacts are adequately mitigated and potential benefits of the project are further enhanced to improve the effectiveness and sustainability of the project ◦ It details out the implementation schedule for each suggested measure along with the primary responsibility for implementation

Based on the SA, following issues have been identified  Ensuring participation  Ensuring inclusion and enhancing equity  Ensuing & enabling participation; especially of women  Decentralizing service delivery, underpinned by the principle of subsidiarity  Improving Accountability and transparency  Strengthening capacities of the States, GPs  Human and institutional development  Change management initiatives for changing the role of Government from ‘provider’ to a facilitator’; improving accountability and transparency  Effective information, education & communication (IEC) campaign  Non-existing/ non-functional VWSCs  Current practice- top-down approaches by technical bureaucracy without any scope for community participation  Convergence with line departments  Gender mainstreaming

 Current institutional structure of the SWSM does not fully subscribe to the principles of the demand driven approach  Top-down driven approach by technical bureaucracy without any scope for community participation  Centralized decision-making with little say of PRIs in decision-making. Devolution of powers to Zilla Parishad and Panchayat has not happened as desired  DWSM consultants are not placed at DWSC/DWSM level, hindering the soft component / IEC activities under the project (NRDWP & NBA)  Lack of coordination between the mechanical and civil wings at district and sub-divisional level; resulting delay in project delivery.  VWSCs/GPWSC are not formed, involvement of Panchayats remains limited in planning, implementation, operation & maintenance of the schemes  Availability of electricity and undulating terrain a concern towards establishment of planned network of rural water supply infrastructure

What needs to be done?  Ensure participation of women in planning and implementation  Selection of women representation  Women’s involvement in awareness generations  Provision for girl friendly toilets with suitable water facilities and for safe menstrual management in existing schools  Technology and site selection  Ensuring equal access to the factors of production  Building Capacity  Behavior change

 No involuntary land acquisition; all donations and purchases will be voluntary and will not involve any significant adverse impacts upon incomes or physical displacement  All voluntary land transactions to meet the following criteria: ◦ land in question to be free of squatters, encroachers or other claims of encumbrances ◦ lands to be chosen (by the community) after ensuring that water indeed will be available in that particular piece of land ◦ verification of the voluntary nature of land donations in each case; ◦ land transfers to be completed -- land title to vest in the community (GPWSC) through registered sale deed or MOU ◦ minimum economical viable stipulated size of land is 2.5 acres. After parting, land holding should be at least 2.5 acres. ◦ Lands not accepted by marginal land holders. not more than 10% of the total land holding to be accepted ◦ grievances redressal mechanism to be set-up. Examination of all land purchases by an independent agency before according the approval- DPMU to coordinate. ◦ Monitoring all Land Transactions !!

 In Jharkhand, six districts, namely, Garhwa, East Singbhum, Saraikela- Kharsawan, Khunti, Dumka and Palamau, will be covered. Four out of these six districts are tribal dominated districts. ?? Scheduled Areas  Why TDP: ◦ The tribal groups have a distinct cultural identity as compared to other groups ◦ They are socially and economically disadvantaged ◦ They have special developmental needs in terms of access to services and facilities compared to other backward groups ◦ They are perpetually excluded from the decision making ◦ Discriminatory targeting to ensure inclusion and equity critical  Hence, the TDP aims at: ‘Promotion of inclusive, equitable and sustainable water supply and sanitation delivery through fostering and empowering grassroots tribal institutions in the tribal areas’

 Coverage of areas/ habitations (not already covered under the state government’s scheme), in the Tribal Development Plan based on the selection criteria of the schemes/areas on priority -- TSP/ TDP/ SA  Mechanism to be put in place for maintenance of hand-pumps, bore- well, etc. at GP level -- Habitation Vs GP – Important.  Selection of technological options for WS and Sanitation – Power Supply, User Friendly.  Planned and focused attention for Sanitation and Hygiene promotion especially through intensive tribal friendly IEC  Orientation of the PRI on broad issues of water and sanitation – PESA?  Capacity building of VWSC, given the difficult access and low experience in governance. VWSC vs HWSC ??  Capacity building of Jalsahiya  Absence of sanitary markets near villages, creating local supplies of quality sanitary wares remains a challenge – Creation of Skilled Personnel ??

 Mainstreaming of tribal : ◦ ensuring inclusion, participation, governance, sustainability and accountability of the tribal. Conscious efforts to be made to include Primitive Tribal Group (PTG) and involve their participation in the schemes  Involvement of Women : ◦ involvement of tribal women at all levels and phases of the project. ◦ Tribal women’s representation at State Advisory /District Advisory committee, monitoring and evaluation committee, grievance redressal team etc. ◦ Minimum 50% representations of women in habitation and village level committees will to be ensured  Involvement of PRI: PESA ◦ From the selection of habitation, site, schemes, ensuring participation of tribals at each stage of the project, allocation of budget earmarked, monitoring and evaluation