Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.

Slides:



Advertisements
Similar presentations
Manufacturing Processes lab I Running a lathe machine
Advertisements

Step-by-step assembly instructions
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
STAR Detector Main Support System1 Lateral Tracking of the STAR Detector during Translation. November 23, 2005 Ralph L. Brown STAR Operations Group.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Specification section 3.3
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Metalwork Lathe JF The Lathe Click on an area to start questions. 3 Jaw Chuck Safety 3 Jaw Chuck Head stock Tool post Tail stock 1 Tail stock 2.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
ATLAS Pixel Detector Pixel Support Tube Interfaces LBNL Internal PST Review E. Anderssen, LBNL.
Support and alignment of PXL box with MSC, operation steps
Step-by-step assembly instructions
PXL Mechanical Hinge rework in aluminum and carriage redesign Kinematic rework and analysis Insertion test - detailing and fabrication instructions Spatial.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
Alignment Tools Used To Locate A Wire And A Laser Beam In The VISA Undulator Project Wire Finder CALIBRATION A special fixture was constructed to calibrate.
ATLAS Pixel Detector Pixel Support Tube and Related November 9, 2001 Pixel Day E. Anderssen, LBNL.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
1 HFT Wieman 11/6/ Outline  Development Status uMIMOSTAR pixel detectors uMIMOSA5 Electronic Readout uLadder mechanics uBeam pipe  Interface.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
DUNE APA Overview for SBND Synergy Discussion Lee Greenler University of Wisconsin Physical Sciences Lab September 2, 2015.
Steel Bumper Tooling Operations. STEEL BUMPER
BORING MACHINE ENROLLENMENT NO:588,589,590,591,592,593
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Preliminary PXL support models with assembly fixtures.
Assembly of steering.
STEP 1: ASSEMBLE ANGLE PLATES
2016 Maintenance Innovation Challenge
UNIT-II TURNING MACHINES
SeaPerch Structural System
SeaPerch Structural System
WeDo Catapult Build Instructions
BSS Prep work at CERN and Acceptance of Parts
Surface Grinding Operations
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
STEP 1: ASSEMBLE ANGLE PLATES
2.2 Gallon TourTank Installation
Step-by-step assembly instructions
Assembly instructions for M-K all bolt together hoppercone kit.
SeaPerch Structural System
Step-by-step assembly instructions
Step-by-step assembly instructions
Preliminary PXL support models with assembly fixtures
Step-by-Step Assembly Instructions – Cube Version
SeaPerch Structural System
Step-by-step assembly instructions
Step-by-step assembly instructions
Panel Riveting Dept. Adjustable Part Holding Fixture
Presentation transcript:

Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010

operations addressed: PIT flange attachment PIT rail attachment Rail testing system PST flange attachment PST kinematic attachment SSD locating fixture Spatial mapping of the pixels with the Coordinate Measuring Machine (CMM) 2

PIT flange attachment assemble PIT end plate fixture load flanges on PIT and insert into the PIT end plate fixture bond flanges (middle flange?) cut holes for rail mounts now ready for rail mounting 3

cut holes in PIT for rail supports install cutting guide, cut 4 holes flip guide, cut 4 more rotate PIT 180 deg, repeat for 8 more holes 4

5 apply glue and mount to rails with post passing through holes insert rails with rail holder fixture Bond rail supports bonded rail support

6 remove post freeing rails and rail holder for removal remove rails and rail holder release rails from rail holder remove PIT from end fixtures (can’t remove with rails in place) reattach rails to PIT with correctly identified posts keep track of which post goes with which pad

7 PIT with rails attached

rail tester 8 rail_test_system.SLDASM (operation view)

tester rail attachment Assemble PIT flange mounting plates Assemble tester frame 9

install rail holder with rails, posts and bond pads removed spread glueattach post and bond pad cams are removed so that cross bars (not shown) coupling rails constrain the rotation angle in the guides 10

remove posts removing the posts allow that rails and rail holder to be removed. Rails without the rail holder can then be reattached to the rail tester by reinstalling the posts. 11

attach kinematic mounts to rail tester butch plate grand master with kinematic mounts cross arms base plate attached to grand master remove rails mount butch plate apply glue to cross arms and base plate attach grand master to butch plate after glue sets remove butch plate and separate rail tester from PIT end plates reattach rails tester is now complete grand master can be detached from base plate for later use after testing is complete 12

PST flange attachment Assemble PST end plate fixture load flanges on PST and insert into the PST end plate fixture bond flanges cut holes (fixture yet to be designed) Now ready for attaching the kinematic mounts 13

PST kinematic mount attachment 14 remove east PST end plate attach empty grand master to east PST end plate attach PST end plate with grand master back on to the PST fixture east PST end plate grand master

kinematic mount 15 assemble kinematic mounts with bond feet attach mount with feet to cross bar apply adhesive adhesive

PST kinematic mount attachment 16 attach kinematic mounts to grand master by securing cross bar to grand master allow setup and remove cross bars from feet and grand master detach grand master from east PST end plate and support the grand master so that it does not load PST Remove end plates and grand master PST done

Summary of PST kinematic attachment remove east PST end plate attach empty grand master to east PST end plate attach PST end plate with grand master back on to the PST fixture assemble kinematic mounts with bond feet attach mount with feet to cross bar apply adhesive attach kinematic mounts to grand master by securing cross bar to grand master allow setup and remove cross bars from feet and grand master detach grand master from east PST end plate and support the grand master so that it does not load PST Remove end plates and grand master PST done 17

OSC fixture The PIT fixture will also be used for the OSC since the OSC and PIT are the same diameter. The base plate will be changed to set the correct length – fixture used for placing the OSC flanges – flats and reference groves used to position SSD supports. Up to 6 ladder supports can be installed at one setting. The OSC is rotated in the fixture by 180 deg to do the remaining attachments. 18

Coordinate Measuring Machine (CMM) configuration 19 The grand master fixture is also used to support the detector halves in the CMM for doing the spatial map of the pixels. The fixture is supported in the CMM with 3 point support on the tooling balls for all the required angular positions. The relative mapping of all the tooling balls provides the required cross referencing of all the angular positions. The same kinematic supports are used here as are used in the STAR detector installation.