Fire Protection Upgrades at New Brunswick Laboratory Lessons Learned on an ASME NQA-1 Design Build Project Alexander C. Smith, PE.

Slides:



Advertisements
Similar presentations
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Advertisements

MONTANA Department of Labor & Industry Employment Relations Division Occupational Safety & Health Bureau P.O. Box 1786 Miles City, Montana Fax:
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Software Quality Assurance Plan
Office Alterations RAF/2012/00027 Compulsory Briefing Session 01 October 2012 RAF – EcoGlades Centurion.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
REDUCING BURDEN WHILE INCREASING QUALITY AT A GOVERNMENT AGENCY David A. Marker (Westat), Mary K. Dingwall (Westat), and Marla D. Smith (U.S. EPA) Presented.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Introduction to Integrated Library Systems
Pricing Subcontractors’ Work
PROCUREMENT PROCESS FOR CONTRACTS Recognition of Need.
ISO General Awareness Training
Workplace Safety and Health Program
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
FPSC Safety, LLC ISO AUDIT.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
4. Quality Management System (QMS)
Responding to Inspection Findings
BUILD WITH US. ™ Contractors
© 2013 BOS Solutions Ltd. Revised: Mar 15,2013 Version 2 – BOS HSE MSpg. 1 The BOS HSE Management System Brad Whitaker, MSPH, CSP BOS Solutions HSE Director.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
Module 7: Construction Phase
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
Slide 7-1 UNIT 7 POST INCIDENT EVALUATION AND ANALYSIS.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
CVE 4070 Construction Engineering Shop Drawings Quality Control
Contract Training Class I
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Safety in Construction Contracts Presented By: Ramy besaiso Instructor : Eng: Eyad Haddad Chapter 10.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
A QUALITY IMPROVEMENT TOOL
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
1 Overview of the NF 1680 Evaluation of Performance Process Overview/Training Charts April 7, 2008.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
ASPEC February 2015 Incidents –0 incidents, 0 near misses Hours 31/01/15-27/02/15 11% Site, 1% Travel, 88% Office ASPEC QSHR February 2015 Minutes.
Commissioning HVAC Systems: Lessons learned throughout
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
The Contract Management Process Contract Formation.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
School Safety Inspections
Software Project Configuration Management
Hot Work Loss Prevention Program
Office Alterations RAF/2012/00027 Compulsory Briefing Session
(Additional materials)
“Prepare, Prevent, Respond”
Module 8 Introduction to Validation
Projects Integrating Planning for Successful Occupancy, Operation, and Maintenance into your Capital Project.
Designers’ Manual Appendix Contents
Chip Seal Quality Assurance Guide
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Quality Assurance for Emulsified Asphalt Surface Treatments
DOE Review of the LCLS Project October 2006
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Fire Protection Upgrades at New Brunswick Laboratory Lessons Learned on an ASME NQA-1 Design Build Project Alexander C. Smith, PE

Introduction Alex Smith Worked for Nexus for 7 years PE in Fire Protection Based out of our Chicago Office (Oakbrook Terrace, IL)

Background New Brunswick Laboratory (NBL) Fire Protection Upgrades Scope of work (Design Build)  Sprinkler System  Penetration Seals & Fire Wrap  Gypsum Fire Barrier  Fire Dampers  Emergency Lighting  Minor Electrical and Mechanical Work

Background

For the ASME NQA-1 work a CGD was performed for material and services. Subcontractors with ASME NQA-1 experience were not readily available. Subcontractors were chosen based on their DOE or commercial experience.

Lessons Learned Issue: Contractors did not understand the requirements of ASME NQA-1.  Design Interface Requirements  Configuration Management  Receipt Inspections  Quality Control Checks  Inspection and Testing Procedures

Lessons Learned Example: Installers identified a need for making field changes. They received approval from their designer and proceeded with the change. The project procedures required the completion of an FCR (Field Change Request) with Nexus approval.

Lessons Learned Corrective Actions: Retraining on the procedures was provided. Increased oversight was implemented. Example: Items were not submitted for approval before they were brought to the site. These items are where the supplier substituted an “equal” part to the subcontractor.

Lessons Learned Corrective Actions: Items are evaluated before they are accepted. This delayed the schedule but was required to meet the quality requirements. Retraining was provided but because the problem was with the supplier this was a reoccurring problem throughout the project.

Lessons Learned Corrective Actions: After the project: Revised Procurement Procedures to include examples of previous work

Lessons Learned Issue: All parties involved were unfamiliar with large scale modifications at NBL  NBL personnel (mostly residents) were unfamiliar with procedures and postings  Prime contractor was unfamiliar with NBL and Nexus procedures  Nexus was unfamiliar with NBL and subcontractor’s procedures  Subcontractor’s were unfamiliar with NBL and Nexus Procedures

Lessons Learned Example: NBL Residents ignored construction barriers to get into their office or their laboratories. Forcing installers to stop work to prevent an accident. Corrective Action: NBL Management sent out reminder s about procedures and conducted refresher training for affected people.

Lessons Learned Example: Subcontractors missed steps in QC checklists and installation procedures Corrective Action: Nexus was prepared for this and had implemented increased surveillance in the beginning of the project and was able to catch issues as they were happening and could prevent non-conformances.

Lessons Learned Corrective Actions: After the project:  Revised Procurement Procedures to include examples of previous work  Revise Proposal Writing Procedures to obtain client procedures (when available)  Provide Lessons Learned in LLD to review subcontractors procedures and integrate them into the project specific procedures.

Lessons Learned Issue: Contractors did not understand the DOE safety and radiological requirements. Example: Subcontractors scheduled installation, use, and removal of scaffolding in one day. This did not account for NBL inspections. Corrective Action: After the first two day process the schedule was revised to account for inspections.

Lessons Learned Example: Subcontractors intended to use a HEPA filtered shop vac that was not DOP tested in the radiological laboratories. Corrective Action: The HEPA filtered shop vac was evaluated and determined to be suitable for other areas where control of dust was a concern. A facility HEPA vac was used instead.

Moving Forward Nexus has revised its procurement procedures for Design Build jobs to provide the expected level of detail and subcontractor expectations in bid documents. Bid documents will be reviewed in a pre-bid meeting with an emphasis on lessons learned, non-standard commercial activities, and not just what we are doing but how.

Moving Forward Subcontractors will be included in the creation of installation procedures and their existing procedures will be used as much as possible. Training on procedures will include not only the installers and site personnel but also support personnel (shop designers, procurement, and management).

Moving Forward At the start of project on-the-job- training and increased surveillance will be used to ensure proper use and adherence to project procedures and QC checklists. Facility personnel should receive refresher training when they are not used to construction taking place. Re-training will be implemented as needed.

Questions Alex Smith (630) ext. 334