SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Connection Details for Prefabricated Bridge Elements and Systems
2013 Northcentral Region Construction Conference
Moving transportation into the future Strategic Highway Research Program.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
Portland Cement and Concrete
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
SHRP2 Project R04 Bridge Designs for ABC
Chapter 5. Silica-Fume Concrete Projects  Bridge Decks  Parking Structure  High-Rise Columns  HPC Bridge  Shotcrete Rehabilitation  HPC Constructability.
Jamar Adams Nina Brabham Anas Ghandorah Dan Holombo.
Chapter 34 Bridge Construction.
Specialty Concrete - High End Value Materials. High-Value Concrete n All concrete is high value! u Cost of material (small) u Cost of placement (significant)
Connection Details for Prefabricated Bridge Elements and Systems
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
Longevity & Durability. The Concrete Joint Sustainability Initiative is a multi-association effort of the Concrete Industry supply chain to take unified.
 Project Delivery  Design Considerations  Lessons Learned.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Increased load capacity of arch bridge using slab reinforced concrete T.G. Hughes & M. Miri Cardiff School of Engineering Arch 04, Barcelona, Nov ,
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Resource Efficiency Joint Sustainability Initiative.
Operational Continuity. The Concrete Joint Sustainability Initiative is a multi-association effort of the Concrete Industry supply chain to take unified.
Presented by Mariah Safritt July 30, 2015
Resource Efficiency. The Concrete Joint Sustainability Initiative is a multi-association effort of the Concrete Industry supply chain to take unified.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Societal Connectivity Joint Sustainability Initiative.
Holly Holevinski Cement + water = paste Aggregates: Coarse (>1/4”) Fine (
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Other Construction Projects
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
“Properties of Concrete” Introduction
The Cathedral of Our Lady of the Angels. Los Angeles, California Rafael Moneo.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: State-of-the-Art Full-Depth Precast Concrete Bridge Decks Sponsored by Center.
Materials Science(MEEN 3344) By Uduzei M. Ovbiagele (Duz)
 It is also known as Reactive Powder Concrete (RPC)  It is a high strength, ductile material formulated by combining portland cement, silica fume, quartz.
Self-Consolidating Concrete Applications Celik Ozyildirim, PhD, PE Virginia Concrete Conference 2011.
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Field-Cast UHPC Connections in Full-Depth Precast Bridge Decks Sponsored by.
Ultra High Performance Concrete (UHPC) Kelly Grahmann MEEN 3344 Texas A&M University - Kingsville.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
Operational Continuity Joint Sustainability Initiative.
Societal Connectivity. The Concrete Joint Sustainability Initiative is a multi-association effort of the Concrete Industry supply chain to take unified.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Rocks and Building 1.5 Cement and concrete. Learning objectives Understand how cement and concrete are produced Understand how cement and concrete are.
ALL THINGS CONCRETE. WHAT IS CONCRETE Is a mixture or cement (usually Portland cement), aggregate (gravel, and sand), water and chemicals added to the.
Construction Methodology for Suramadu Main Bridge.
..... Deep Foundations Institute Project Nominee San Francisco-Oakland Bay Bridge New East Span.
Totally Precast Concrete Bridges
FHWA Updates/News Benjamin Beerman, PE Federal Highway Atlanta, GA
Oregon DOT Integral Abutment Design Criteria
High Performance Concrete
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Ness Bridge Construction
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Ultra High Performance Concrete (UHPC)
US26: Cornelius Pass Rd -185th Ave
Totally Precast Concrete Bridges
Accelerated Bridge Construction; Raising the Bar
Presentation transcript:

SHRP 2 - R04 ABC Demonstration Bridge Design and Construction AASHTO Committee on Construction San Francisco, CA August 16, 2012

Iowa ABC Demonstration Project Two Week Closure US Highway 6 Bridge over Keg Creek 6 miles east of Council Bluffs, IA Normal construction duration weeks ABC construction duration 14 days

Project Innovations  Precast modular bridge system (including precast approach pavement)  Superstructure units create a semi- integral abutment for rapid construction  Durable, moment-resisting UHPC joint between deck panels  First bridge in US with full, moment- resisting UHPC joint at the piers

UHPC UHPC Particle Packing UHPC Constituents: Portland cement silica fume fine, uniformly graded sand crushed quartz steel fibers water superplasticizers

14-Day ABC Timeline

Bridge Farm Concept

Precast Abutments and Piers

Superstructure Modules

Deck Joint Forming

Deck Concrete Placement

Drilled Shaft Construction

Abutment Details Precast Abutment Construction  Single piece barrel section  SCC to fill pile pockets  Temporary support of backwall until SCC reaches 3500 psi

Semi- Integral Abutment

Abutment Construction

SCC Concrete for Abutments

Precast Piers

Precast Pier Connections

Column Assembly and Bracing

Capbeam Assembly

Modular Superstructure

Pier Joint Detail C Pier 1 L C Pier 2 L

PT Retrofit for Modules

Module Transport

Module Assembly

Deck Joint Reinforcing

UHPC Mixing

UHPC Placement

FHWA/HFL Workshop

SHRP 2 - R04 ABC Demonstration Bridge Design and Construction Questions?