COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.

Slides:



Advertisements
Similar presentations
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Advertisements

Wellington pharmaceutical wholesale supplies. Supplied Documents Product Sales Report Wellingtons Invoice Product Stock Report Sales Executive report.
Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Copyright National Grid Metering NGM Daily Meter Reads UNC RG 0175.
PN UNC Workgroup Supply Point Register 25 th October 2011.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
DRAFT - Privileged and Confidential - For Internal Use Only and Not for Distribution 1 Press Runs (ID.03)
IGT Single Service Provision Requirements Update – 27 th March 2013.
UKL13950 UK Link Committee 14 th February 2008 COR880 Gemini 2008 Release (Summer)
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PN UNC Workgroup iGT Services 7 th February 2012.
Distribution Network Interruption - Initialisation 28 September 2010.
Project Nexus Workgroup – Invoicing 11 th August 2014.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
COPS Communication Working Group Conference call on 3/8/05 from 1:00 – 2:00 Reviewed scope document and 2005 Goals Reviewed Notification Template.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Mod 0428 Charge Impact October Affected Supply Point Population.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
SoS Report PAC – 13th December 2016.
User Pays User Committee 12th November 2013
FGO: ASA Service Line Review
xrn4361 UK Link Future Release 2
Market Trials ChMC 8th August 2018.
DSC Change Committee Summary – 12th December
Mod 430 iGT Mod 047 Workgroup Update
Confirmation Notice Period for Certain ‘Unique’ Sites
Agenda Action Review Update on IX and iGT access Testing strategy
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Connected System Exit Points Administration Options
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
CSEPs Reconciliation Proposals
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Connected System Exit Points Administration Options
UNC Modification Proposal 0362
Release 2 Scope Business Benefit Review
UNC Modification Proposal 0201 National Grid Distribution
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
UKL Committee - DN Interruption Update
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
DSC Change Committee Summary – 13th February ‘19
User Pays Invoicing Type 1
Project Nexus Workgroup
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
COR1000 Telecoms Project UK Link Committee Update
DN Interruption Phase II
COR1000 Telecoms Project UK Link Committee
Invoicing Proposals 20th May 2013
Implementation Approach Distribution Workgroup – June 2014
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Modification 440 Project Nexus iGT Single Service Provision
High Level System Solution Impact Assessment
Customer Issue Management CoMC Update for April & May 2019
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
Property Management Capitalization Quick Review.
DSC Change Committee Update
Presentation transcript:

COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014

COR2557 Overview Metering is currently still provided by Transporters for a small subset of metering installations known as ‘Special Supply Point Metering Installations’ (Unique Sites). Metering Charges for such Meters charges are based upon Size and Type of the Meter. Currently, where more than one meter point within an LMN attracts the same Metering Charge these Charges are shown at an aggregate Logical Meter Number rather than at Meter Point Level. For such sites attached to National Grid Distribution Networks it is proposed that the invoices are changed to provide Meter Point Level detail. The change solution will utilise the existing adhoc file (.ADN) and charge type (.ADP) to invoice the Provision, Maintenance and Installation of charges for National Grid Metering Assets via the IX to Users The existing back up file (supporting information) will be amended to depict the Provision, Maintenance and Installation of charges at Meter Point Reference level instead of LDZ level for all users, this is provided via rather than IX.

Meter Asset Charges (MAC) are shown on the Supporting Information Files currently as shown below. They are separated into charges associated with: P (Provision) I (Installation) M (Maintenance) Where there are one or more meters within an LMN with the same Size and Type the aggregated charges will be presented in the supporting document as shown below Example below depicts a site with 4 MPRs As Is Billing Period From – Billing Period to LDZ ID Charge Type Charge Item Charge Type Description Site Name LMN Ref Assets on site Shipper on Site NWO Short Code Billable days Unit Rate Charge Amount

MAC charge will show lines for each MPR regardless of Size and Type Example below depicts a site with 4 MPRs To Be