NORTHWEST POWER POOL Reliability through Cooperation 2013.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

Reliability in British Columbia
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
March 25, 2010 WestConnect Transmission Planning Update Bob Easton TEPPC Meeting.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
Operating Reserves --- Again A Discussion Primer
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Load Responsibility in the NWPP Footprint
NERC Orientation Joint Guidance Committee WECC Leadership
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
BAL-002-WECC-1 Contingency Reserves
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
1 Joint Initiative Update WECC OPS Meeting San Diego, California February 2, 2010.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
David H. Wiggs General Manager Los Angeles Department of Water and Power September 24, 2003.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
NORTHWEST POWER POOL Reliability Update
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
1 May 8, 2006 Briefing to Northwest Congressional Delegation Staff.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
NORTHWEST POWER POOL Reliability through Cooperation
Introduction to Bonneville Power Administration
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Introduction Peak Hosted Advanced Applications. 2 What is this project all about? Enhanced TOP situational awareness and ability to perform real-time.
Integrated Security Analysis Pete Sauer, PSERC – Illinois Kevin Tomsovic, PSERC – WSU Steve Widergren, PNNL January 27-29, 2004 Washington, D.C. Transmission.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Water Supply Planning Initiative State Water Commission November 22, 2004.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
1 Crisis Management / Emergency Management Overview.
1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.
Overview of WECC and Regulatory Structure
Status Report for Critical Infrastructure Protection Advisory Group
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Oversight Update Michael Moon, Vice President Registered Entity Oversight W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Interchange Scheduling & Accounting Subcommittee
PMC Membership as of 5/1/2016 Enrolled TO Coordinating TO 1
NERC TPL Standard Overview
Pacific Power Seismic Preparedness Update
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
The Electric Reliability Organization: Getting from here to there.
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Presentation transcript:

NORTHWEST POWER POOL Reliability through Cooperation 2013

NORTHWEST POWER POOL Cooperation

3 Mission The Northwest Power Pool Corporate mission is to support electric reliability through cooperation

4 Vision Helping the Northwest Power Pool members work together to maintain a reliable and secure interconnection – today and in the future

5 Values Member Driven Relationship Based Independent Respect Integrity Trust Competence

6 Work Environment We support each other and create “safe” environment Team concept Merit-based compensation is satisfactory, i.e., comparable to industry Openness Trust Respect Integrity Quality of work – pride in doing a good job Job Security – to do the right thing at the right time

7 History First pooling of resources occurred in1917 in the Northwest NWPP formed in 1941 by 6 investor-owned utilities  3 staff engineers An impetus from the War Production Board in 1942  Ten major private utility systems and Bonneville Power Administration  Pooled resources to provide power to the war industries Maintained after WWII for reliability and coordination

8 Chronology 1941 – Operating Committee (OR, WA, MT, UT, ID) 1942 – BPA joined (superpool) 1949 – British Columbia Hydro & Power Authority joined 1961 – Columbia River Treaty with Canada 1964 – Pacific Northwest Coordination Agreement (PNCA) signed – Coordinating Group 1970 – Contingency Reserve Sharing 1990 – Transmission Planning Committee 1995 – Formalized Membership Agreement 1997 – New PNCA 1999 – NWPP Incorporated as a non-profit corporation 2002 – Automation of the Contingency Reserve Sharing –AGC driven, 20 Balancing Authorities 2005 – NERC Certified Trainer 2008 – Agreement Appointing Agent and Establishing Responsibilities Related to Reserve Sharing Group Compliance with BAL – General Services Agreement

9 Northwest Power Pool Corporation Non profit corporation Nine full-time positions Primary focus on the NWPP members and their requirements

10 Compliance Report and Record KeepingCompliance Report and Record Keeping Compliance Self-CertificationsCompliance Self-Certifications Respond to Enforcement AuthorityRespond to Enforcement Authority  Notice  Audit  Investigation Maintain and update Policies and ProceduresMaintain and update Policies and Procedures NWPP Corporation as Agent

11 Determine Group Compliance MatterDetermine Group Compliance Matter  Operational Noncompliance Event  Identify and proportion responsibility  Administrative Noncompliance Event  Acts or omission of one or more o Identify and proportion responsibility  Group Issue o Apply formula  Report to Enforcement Authority  Identify and proportion responsibility NWPP Corporation as Agent

12 NWPP Corporation Training NWPP is a NERC qualified provider of continuing education hoursNWPP is a NERC qualified provider of continuing education hours CoursesCourses  Reserve Sharing (4 CEH)  Energy Emergency Plan (1CEH)  Underfrequency Load Shedding (2 CEH)  Time Error Control (1 CEH)  Frequency Response (1 CEH)  Voltage Issues (2 CEH)  Reserve Sharing simulation (1CEH)

NORTHWEST POWER POOL Membership

14 NERC/WECC BAs by Sub-regions Northwest Power Pool (NWPP RSG) Alberta Electric System Operator Avista Corporation Bonneville Power Administration British Columbia Hydro Association Chelan County PUD Douglas County PUD Grant County PUD Idaho Power Company NaturEner Power Watch – Wind Energy Northwestern Energy PacifiCorp-East PacifiCorp-West Portland General Electric Company Puget Sound Energy Sacramento Municipal Utility Board Seattle City Light Sierra Pacific Power Company Tacoma Power Turlock Irrigation District Western Area Power Administration – UGP CAMX AZNM RMPP NWPP Rocky Mountain Power Pool (RMRG) Public Service Company of Colorado Western Area Power Administration – CM Arizona-New Mexico (SRSG) Arizona Public Service Company CECD – Arlington Valley CECD – Griffith CECD – Harquahala CECD – Panda Gila River El Paso Electric Company Imperial Irrigation District Nevada Power Company Public Service Company of New Mexico Salt River Project Tucson Electric Power Company Western Area Power Administration – LCR California-Mexico California Independent System Operator Comision Federal de Electicidad Los Angeles Dept. of Water and Power

15 Demographics in NWPP Electrical/Geographic Area  8 U.S. States  2 Canadian Provinces  Federal, Public, Private, Provincial Ownership  International Border (Treaties associated with water)  Non-Jurisdictional as well as Jurisdictional  Preference Act – Public Law  160 Consumer-owned electric utilities  20 Control Areas (37 in the Western Interconnection (WI)).  ~ 90,000 Megawatts Total Resources (44% WI)  ~ 50% Peak load of the WI  ~ 50% Energy load of the WI  Automated Reserve Sharing Procedures  Hydro Coordination  Hydro Thermal Integration  Hydro located on the West (BC, ID, OR, WA)  Thermal located on the East (AB, MT, NV, UT, WY)

16 Participant’s Vision The Northwest Power Pool Membership Agreement serves as a forum for reliability and operational adequacy issues in the area for both transmission and generation.

17 Four Main Membership Committees Operating CommitteeOperating Committee  Foster coordination and communication. Coordinating GroupCoordinating Group  Administer the Pacific Northwest Coordination Agreement, optimizing Columbia Basin hydro generation. Transmission Planning CommitteeTransmission Planning Committee  Provide a forum for reliable transmission planning. Reserve Sharing CommitteeReserve Sharing Committee  Administer and address Contingency Reserve.

18 Operating Committee Adequacy Assessments - to assess the NWPP ability to meet and sustain load demands at all times including extreme load conditions as a result of weather or loss of generation Under-frequency Load Shedding - to arrest frequency decline in the event of a contingency such as severe generation/load imbalance.

19 Outage Coordination - to coordinate the schedule of transmission outages enhancing system reliability and reducing the number of hours under constrained conditions Emergency Response Team - the ability to respond to current reliability issues such as extreme temperature conditions creating extreme load Operating Committee

20 Next Day Operating Studies  Curtailment studies are performed by the individual path operators based on the outage schedule developed through the COS process.  COS process – studies are performed at least 15 days prior to the outage  Includes all facilities 100 KV or greater  Includes all generators 50 MVA or greater Operating Committee

21 NERC  Active participation  Coordinated information, discussions, interpretations and responses WECC  Coordinated discussions concerning new criterion, interpretations and responses Other OC Services

22 PNCA Coordination Critical Period Planning: That period in the historical water record that meets the least amount of firm load Previously the Critical Period was 4 years, but now 7 months Output of planning process are operating curves for reservoirs and FELCCs the systems

23 Coordinated Reservoir Operations Actual Energy Regulation  FELCCs and curves from the planning process  Actual and estimated streamflows Proportional draft Energy in lieu of water Provisional energy

24 Transmission Planning Committee Serve as a Forum for open discussion Sub-Regional Studies to identify  Transmission options within a Sub-Region  Multi Subregional Studies (requested by governmental agencies)  Connections to Regional Transmission  Parities with similar interests and goals – local stakeholder involvement  Local costs and reliability benefits Assist in Regional Transmission Dispute Resolution Process Collection and coordination of TPC members’ data including submittals to WECC Subregional collection and coordination for the NWPP area for WECC submittals Develop guidelines for assessing the reliability and efficient development of the transmission system in the NWPP area

25 Reserve Sharing Committee Contingency Reserve Sharing to provide 60-minute recovery assistance on a “flow base”  Concept – one very large area operating as a single BA for contingency reserve

26 Northwest Operational Planning Study Group (NOPSG)  Closed process (OC and TPC members)  Seasonal path operating studies UFLS studies Seasonal Assessments  Summer and Winter  Long-Term Resource Assessments Transmission Planning Committee and Operating Committee

27 Long-term Significant Outage Planning (LTSOP)  Share outage information with all parties affected by outages of significant equipment (i.e., equipment that affects the transfer capability of rated paths). Information is shared two times each year for a minimum of a six- month period. The first meeting each year coordinates outages for July through December. The second meeting coordinates outages for January through June.  Review the outage schedules to insure that needed outages can be reliably accomplished with minimal impact on critical transmission use.  Outage coordinators are to post the outages on the Coordinated Outages System within the applicable timeframes. Transmission Planning Committee and Operating Committee

28 Local Load Voltage Protection  Facilitate the process to comply with the WECC criteria and guidelines as applicable.  Participate in studies determining minimum requirements for compliance with the criteria and guidelines when more than one Transmission Operator is involved.  Develop and publish final reports  Complete the necessary documentation and provide copies all involved entities. Transmission Planning Committee and Operating Committee

29 Under Frequency Load Shedding Process  Facilitate the process to comply with the NERC Reliability Standard and WECC criteria and guidelines as applicable.  Participate in studies determining minimum requirements for compliance with the criteria and guidelines for the NWPP Area  Develop and publish final reports  Complete the necessary documentation and provide copies all involved entities. Transmission Planning Committee and Operating Committee

QUESTIONS?

Northwest Power Pool Corporation