Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.

Slides:



Advertisements
Similar presentations
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Advertisements

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SARASOTA COUNTY – LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT City of Sarasota.
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
Earth Science 16.3A Shoreline Processes and Features
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Bon Secour National Wildlife Refuge. The Bon Secour NWR consists of 6,700 acres of wildlife habitat lying directly west of Gulf Shores, Alabama on the.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
The Alabama RSM Workgroup And The Gulf of Mexico Alliance Habitat Conservation & Restoration Team Gulf-wide Regional Sediment Master Plan USACE RSM Policy.
Beach Nesting Birds and Mechanical Grooming Practices Michelle van Deventer Sarasota Audubon Society Photo of Least Tern chicks taken by Kay von Schmidt.
U.S. Department of the Interior U.S. Geological Survey Dr. Mary Foley National Park Service Chief Scientist, Northeast Region.
Island County SMP Shoreline Residential Development Workshop December 5, 2011.
Corps Regional Sediment Management and Habitat Restoration: Cape May, NJ J. Bailey Smith National Planning Center of Expertise for Coastal Storm Damage.
Environmental Benchmarks Briefing Nancy Gassman Environmental Protection And Growth Management Department Coordinating Council of Broward, Quality of Life.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
Coastal Ecosystems. The most important coastal systems are beaches and coastal dunes. These are important ecosystems in their own right, but also serve.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Mouth of the Columbia River Jetties Major Rehabilitation.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Mapping the Impacts of Marine Debris Left in the Wake of Hurricane Katrina 61 st Interdepartmental Hurricane Conference 7 March, 2007 Brendan M. Bray NOAA.
Time Series for the east end of Raccoon Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Methods 1. Dune area delineated with GIS before and after storms 2. Calculate total loss and mean loss in dune area for foredunes (N = 26) and secondary.
The Columbia River Basin Where we’ve been. Where we’re going. October 18, 2005.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
US Army Corps of Engineers BUILDING STRONG ® Dunes Mike Wutkowski Coastal Engineer.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
The Coast 1. The Sea 2 Wind Waves The Sea 3 TidesCurrents 1.Long-Shore 2.Cross-Shore.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Brazoria County RESTORE Act Projects
US Army Corps of Engineers BUILDING STRONG ® ENGINEERING WITH NATURE “ Beneficially Integrating Engineering and Natural Systems” PIANC 2012 Dredging Conference.
Time Series for the east end of East Island of the Isles Dernieres Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Sand Dollars Federal Shore Protection Appropriations
Barrier Islands… The low down.. On these important depositional features The low down.. On these important depositional features.
Rabbit Island, Alabama Seagrass Restoration Project Alabama Chapter This project focuses on restoration of seagrass beds contining shoal grass (Halodule.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
ECoastal as a Decision Support System Rose Dopsovic Spatial Data Branch, Mobile District
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Overview Setback (Ref Point/Erosion Rate/Planning Horizon)
Savannah River Projects
Effects of Waves: Beach Erosion
The Mystery of the Disappearing Sand
The low down.. On these important depositional features
R. E. Randall Center for Dredging Studies
Continuing Authorities Program
Strategic shoreline placement from coast to coast
Nourishment, Groins, Seawalls, Breakwaters, Jetties.
Effects of Waves: Beach Erosion
Oklahoma Floodplain Managers Association
Catastrophic Events Think – What is a catastrophic event?
Effects of Waves: Beach Erosion
Shorelines.
Eric Ellis Habitat Restoration Senior Program Specialist
FLAGLER COUNTY, FLORIDA
Presentation transcript:

Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps of Engineers, Mobile District Patric Harper – U.S. Fish and Wildlife Service Carl Ferraro – Alabama Department of Conservation and Natural Resources Roy H. Collins – Alabama Department of Environmental Management Barry D. Dailey - U.S. Army Corps of Engineers, Mobile District Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps of Engineers, Mobile District Patric Harper – U.S. Fish and Wildlife Service Carl Ferraro – Alabama Department of Conservation and Natural Resources Roy H. Collins – Alabama Department of Environmental Management Barry D. Dailey - U.S. Army Corps of Engineers, Mobile District 19 th Annual Alabama Water Resources Conference and Symposium Orange Beach, Alabama October , th Annual Alabama Water Resources Conference and Symposium Orange Beach, Alabama October , 2005

Northern Gulf of Mexico Regional Sediment Management Program 375-miles of Shoreline F ederal Projects State Parks Military Installations 375-miles of Shoreline F ederal Projects State Parks Military Installations Gulf Islands National Seashore Panama City Beach Local Projects Gulf Islands National Seashore Panama City Beach Local Projects

RSM Philosophy Regional Sediment Management Coastal projects play major role in shoreline variability Composed of several elements Requires holistic management approach Manage sediment as a regional resource Informed management decisions Coastal projects play major role in shoreline variability Composed of several elements Requires holistic management approach Manage sediment as a regional resource Informed management decisions

Goal: Maximize beneficial use of sediments; Minimize environmental impacts; Optimize Expenditures Objectives: Implement RSM practices in concert with environment Improve economic performance by linking projects Develop new engineering techniques to optimize/conserve sediment ID/overcome bureaucratic obstacles Establish partnerships Goal: Maximize beneficial use of sediments; Minimize environmental impacts; Optimize Expenditures Objectives: Implement RSM practices in concert with environment Improve economic performance by linking projects Develop new engineering techniques to optimize/conserve sediment ID/overcome bureaucratic obstacles Establish partnerships Regional Sediment Management

Perdido Pass Corps is responsible for maintaining navigation channels –channel 12 feet deep by 150 feet wide –channel 9 feet deep by 100 feet wide –deposition basin Two jetties extending into the Gulf of Mexico spaced 600 feet apart are at the seaward end. –six (6) feet mean low water (MLW) –low weir section to permit passage of littoral drift material Corps is responsible for maintaining navigation channels –channel 12 feet deep by 150 feet wide –channel 9 feet deep by 100 feet wide –deposition basin Two jetties extending into the Gulf of Mexico spaced 600 feet apart are at the seaward end. –six (6) feet mean low water (MLW) –low weir section to permit passage of littoral drift material

Disposal Areas #3 #6 #7 #1 #4 #2 1-mi

Perdido Pass - Alabama Benefits –Effective use of modeling tools –More effective sand by-passing –Flexibility in disposal placement –Partnership with local government –Environmental Benefits –Effective use of modeling tools –More effective sand by-passing –Flexibility in disposal placement –Partnership with local government –Environmental

Hurricane Ivan Strong Cat mph winds 14-foot surge + Large waves Extensive Erosion Strong Cat mph winds 14-foot surge + Large waves Extensive Erosion

Gulf State Park, Florida Point Unit, east side of Perdido Pass Natural beach system Wide beaches Developed dune fields - 15-foot crest elevations above mean sea level. Abundantly vegetated with sea oats and other native plants Habitat for several listed species –Perdido Key beach mouse –Piping plovers –Least terns –Nesting sea turtles. Gulf State Park, Florida Point Unit, east side of Perdido Pass Natural beach system Wide beaches Developed dune fields - 15-foot crest elevations above mean sea level. Abundantly vegetated with sea oats and other native plants Habitat for several listed species –Perdido Key beach mouse –Piping plovers –Least terns –Nesting sea turtles. Pre-Ivan

Hundreds of thousands of cubic yards of sand lost from beaches and dunes –Eroded into Pass –Overwashed into back-bay –Transported seaward 5 to 10 feet of elevation lost Much of the critical habitat destroyed Leveled dune fields Major beach erosion Hundreds of thousands of cubic yards of sand lost from beaches and dunes –Eroded into Pass –Overwashed into back-bay –Transported seaward 5 to 10 feet of elevation lost Much of the critical habitat destroyed Leveled dune fields Major beach erosion Post-Ivan

Emergency Action Emergency funding to restore navigation channels and affected areas –Perdido Pass Not enough disposal capacity –Permitting and environmental compliance issues Minimal restoration to channel Emergency funding to restore navigation channels and affected areas –Perdido Pass Not enough disposal capacity –Permitting and environmental compliance issues Minimal restoration to channel #3 #6 #7 #1 #4 #2 1-mi

Cooperative, multi-agency effort to quickly develop and implement a restoration plan ! U.S. Fish and Wildlife Service –Restoration of critical habitat –Coordination for threatened and endangered species –Critical habitats Alabama Dept. of Conservation and Natural Resources – Use of state lands Alabama Dept. of Environmental Management –Water Quality Certification / Coastal Zone Consistency Gulf State Parks –Environmental coordination City of Orange Beach –Easements and right of ways USACE –Planning –Engineering –Operations U.S. Fish and Wildlife Service –Restoration of critical habitat –Coordination for threatened and endangered species –Critical habitats Alabama Dept. of Conservation and Natural Resources – Use of state lands Alabama Dept. of Environmental Management –Water Quality Certification / Coastal Zone Consistency Gulf State Parks –Environmental coordination City of Orange Beach –Easements and right of ways USACE –Planning –Engineering –Operations

Post Storm

Pre-storm survey

Restoration Measures Restore base elevation on the east side of the Pass –Tie in to the remaining dune line at about the +10-foot elevation –Extend berm seaward sloping gradually to the water –Establish original position of shoreline –Gradual slope to prevent the formation of escarpments and maintain a beach that allows access for nesting sea turtles. Construction of dunes to mimic natural dune fields –Promote dune growth and formation –Dune stabilization measures planting natural dune vegetation placement of dune fencing Extend berm and dunes east within limits of State Park –Dependent upon volume of available material Restore base elevation on the east side of the Pass –Tie in to the remaining dune line at about the +10-foot elevation –Extend berm seaward sloping gradually to the water –Establish original position of shoreline –Gradual slope to prevent the formation of escarpments and maintain a beach that allows access for nesting sea turtles. Construction of dunes to mimic natural dune fields –Promote dune growth and formation –Dune stabilization measures planting natural dune vegetation placement of dune fencing Extend berm and dunes east within limits of State Park –Dependent upon volume of available material

Pipeline dredge used to move material Dozer used to spread and shape Dredging began early February Dredging complete late March Pipeline dredge used to move material Dozer used to spread and shape Dredging began early February Dredging complete late March

90 least tern nests 16 black skimmer nests 1 documented sea turtle nest Natural vegetation returning Protection measures taken 90 least tern nests 16 black skimmer nests 1 documented sea turtle nest Natural vegetation returning Protection measures taken

Perdido Pass Florida Point Restoration Conclusions Benefits –Navigation –Recreation –Leveraging of funds –Saving O&M funds –Beneficial Use –Partnerships –Environmental Beach mouse critical habitat Bird nesting Sea turtles Dunes Benefits –Navigation –Recreation –Leveraging of funds –Saving O&M funds –Beneficial Use –Partnerships –Environmental Beach mouse critical habitat Bird nesting Sea turtles Dunes Special thanks to Kelly Reetz, Gulf State Park for supplying many of the photos