1 Session 17 Theory of Constraint (TOC) Scheduling Theory of Constraint (TOC) Principles Determining Bottleneck Operations Information Flow in TOC Scheduling.

Slides:



Advertisements
Similar presentations
© 2007 Pearson Education Constraint Management Chapter 7.
Advertisements

© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
1 Session 15 Production Activity Control PAC in the MPC System –Shop Floor Control –Vendor Scheduling Production Activity Control Techniques –Basic Data.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Operations Management
Ch 3 Manufacturing Models and Metrics
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: –what levels should be maintained.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Production Activity Control
Candid Comparison of Operational Management Approaches James R. Holt, Ph.D., PE, Jonah-Jonah Washington State University-Vancouver Engineering Management.
Based on the book: Managing Business Process Flows.
Introduction to Theory of Constraints
Chapter 4 Process Design.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Production Activity Control
Managing Processes and Capabilities CHAPTER THREE.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Lecture 13 Production Activity Control
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
© Wiley 2007 Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Purposes of Inventory 1. To maintain independence of operations. 2. To meet variation in product demand. 3. To allow flexibility in production scheduling.
Module 10: Theory of Constraints Operations Management as a Competitive Weapon.
Constraint Management Chapter 7 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
Production Activity Control
Manufacturing planning & control : Integration of MRP & JIT Prepared by: Ankit P. Sarvaiya (09CAD14)
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Scheduling Operations
Manufacturing Planning and Control
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Synchronous Manufacturing and Theory of Constraints
Inventory System Inventory system: the set of policies and controls that monitor levels of inventory and determines: what levels should be maintained when.
Analytical Tools for Process Analysis and Improvement
Synchronous Manufacturing
Constraint Management
BSOP 429 Innovative Education--snaptutorial.com
IV-2 Manufacturing Systems modeling
SE503 Advanced Project Management
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Goldratt's Theory of Constraints (TOC)
GATORADE MX Production
Manufacturing Planning and Control
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

1 Session 17 Theory of Constraint (TOC) Scheduling Theory of Constraint (TOC) Principles Determining Bottleneck Operations Information Flow in TOC Scheduling Constructing the Product Network Drum/Buffer/Rope Concept Scheduling Bottleneck Operations Process and Transfer Batches Repetitive Lot Scheduling Concluding Principles

2 Theory of Constraint (TOC) Principles 1.An hour lost at a bottleneck is an hour lost forever. 2.An hour saved at a non-bottleneck is just a mirage. 3.Bottlenecks govern both throughput and inventory in the system. 4.Schedules should be established by looking at all constraints simultaneously. 5.The process batch should be variable, not fixed. 6.The transfer batch may not, and many times should not, be equal to the process batch. 7.Lead times are the result of a schedule and can't be predetermined. 8.Balance flow, not capacity. 9.The level of utilization of a non-bottleneck is determined not by its own potential but by some other constraint in the system. 10.Utilization and activation of a resource are not synonymous.

3 Determining the Bottleneck Operations Marucheck's plant has three departments: shaping, pickling and packing Order size = 100 pieces Shaping Machines: S/u = 1 hour, Run Time = 1 minute/pc Pickling process: one tank with 1 load of 200 units every 4 hours. (Baskets are loaded while a load is in-process.) Packing: four people perform packing, each person producing 25 units/hour. Which is the bottleneck department?

4 Marucheck's Makeshift Manufacturing DeptS/U RT Hr/Batch Units/hr Shaping (3 machines)1 hr1 min/pc1+100 min/60100/2.67 * 3 =2.67 hrs =112.5 pcs/hr Pickling (brine tank)-4 hrs/batch4 hrs200/4=50 pcs/hr Packing (4 people)-25 pcs/hr/person1 hr4x25=100 pcs/hr Note: batch size = 100 pcs

5 TOC/SERVE Information Flow

6 Sample Product Network

7 Drum/Buffer/Rope Concept Drum:The Schedule Buffer:Located at Bottleneck Stations and at Finished Goods Rope: Pull Scheduling at Non-Bottleneck Stations

8 Scheduling Bottleneck Operations

9 Process and Transfer Batches

10 Ace Tool The production manager selected an example order to use in evaluating benefits and potential costs of the repetitive lot concept approach. The transfer batch size is 100 units. The example order is for a quantity of 1,000 units and has the following routing data: ____________________________________________ Work OperationcenterSetup time_Run time/unit__ minutes 2.4 minutes/unit minutes 1.44 minutes/unit ____________________________________________

11 Ace Tool a.Assuming a single-shift, eight-hour day, five-day period for work centers l and 2, prepare a Gantt chart showing the earliest start- and finish-time schedule for this order under a conventional scheduling approach where all items in the order are processed at one time. Do the same when the repetitive lot concept is used. What are the earliest start and finish times for each transfer batch at work center 2, assuming none of the transfer batches are processed together to save setup time?

12 Ace Tool Solution b.What's the difference in the order-completion times under the two scheduling approaches in part a above? Under No Transfer Option: Work center 1:2.4 min./unit X 1,000 units + 40 min. setup time = 2,440 min. or hours. Work center 2:1.44 min./unit X 1,000 units + 20 min. setup time = hours. (The last operation is completed at hour 65.0 at work center 2.) Under Transfer Option: Work center 1:2.4 min./unit X 1,000 units + 40 min. setup time =2,440 min. or hours. Work center 2: First batch starts as early as 40 min X 2.4 = 280 minutes or 4.67 hours. Each batch of 100 takes 4 hours to process at work center 1 and 20 min min/unit X 100 = 164 min. or 2.73 hours on work center 2. The last batch can clear work center 2 as early as hour

13 Ace Tool Solution (continued) c.What are the benefits and potential costs of this scheduling approach? Shorter production lead time Less work-in-process inventory Improved customer service Costs Using Transfer batches: There could be as many as 10 setups required at work center 2 if none of the batches were run under the common setup. Such a schedule is shown below.

14 Repetitive Lot Scheduling Consider the following data for three jobs processed in the boring machine center for Conway Manufacturing. ________________________________________________ Setup time Run time/ Job(minutes) unit(minutes)Batch size A B C ________________________________________________ Queue data for the boring machine center: Arrival JobtimeJobtimeJobArrival time A8:24B8:40B 9:12 B8:28C8:42C9:14 C8:31C8:44A9:18 A8:34A8:57B9:21 B8:39A9:03B9:31

15 Boring Machine Center a.If the boring machine center used a. first-come/first-served rule to schedule jobs, how long would it take to process the queue? (Assume no other jobs arrive, all jobs in queue are for one batch each, and a job B has just been completed.) First-come, first-served finish time is 2:44 P.M. Total flow time is 6 hours, 20 minutes.

16 Boring Machine Center b.How long would it take to process all jobs in the queue using a repetitive lot logic? Finish time is 12:49 P.M. Total flow time is 4 hours, 25 minutes.

17 Concluding Principles The MPC framework is useful in assessing where a particular approach or system fits within the system. There is no "ultimate weapon'' in MPC systems. Firms should continually evaluate improvements. A working MPC system should be in place before you undertake improvements. You should concentrate on bottleneck resources to focus material planning and capacity planning on the vital few. Variable lot sizes should be used to reduce manufacturing lead time and reduce work-in-progress