Metering & Data Processing

Slides:



Advertisements
Similar presentations
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
Advertisements

Analog-to-Digital Converter (ADC) And
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Metering Regulations alka NPTI, PSTI Bangalore. 1. Short title and commencement. These regulations may be called the Central Electricity Authority (Installation.
In this presentation you will:
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
Availability Based Tariff Meter
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Data Logger for Water Meter Function Continuously counts pulses from pulse output of the water meter (or other meters with pulse output) and periodically.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
 A data processing system is a combination of machines and people that for a set of inputs produces a defined set of outputs. The inputs and outputs.
1 © Unitec New Zealand Embedded Hardware ETEC 6416 Date: - 10 Aug,2011.
BLOCK DIAGRAM OF COMPUTER
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
1.Meter installation database and its up-dating on a regular interval. 2.Meter testing details and last testing done 3.Downloading of data and transmission.
Topics Introduction Hardware and Software How Computers Store Data
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.
© Paradigm Publishing Inc. 2-1 Chapter 2 Input and Processing.
1. Metering philosophies adopted in SR a.Generally the HV side of ICTs b.Some places the line side c.Tertiary loading of transformers is done at POWERGRID.
Introduction to Computing: Lecture 4
SFT 2841 IN CONNECTED MODE Prepare setting files.
1. WHAT IS METER ? A device which measures, indicates and records certain measurable quantity. 2. WHAT IS ENERGY METER ? A device which measures, indicates.
Metering & Data Processing
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
© Paradigm Publishing Inc. 2-1 Chapter 2 Input and Processing.
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
(More) Interfacing concepts. Introduction Overview of I/O operations Programmed I/O – Standard I/O – Memory Mapped I/O Device synchronization Readings:
SPECIAL ENERGY METER STORES STORES THE FOLLOWING DATA DURING THE 10 DAYS PERIOD (i)15 MIN. BLOCKWISE ACTIVE ENERGY FOR 10 DAYS (ii)15 MIN. BLOCKWISE AVERAGE.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Metering Regulations alka NPTI, PSTI Bangalore. 1. Short title and commencement. These regulations may be called the Central Electricity Authority (Installation.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 TOP TEN NON- COMPLIANCE ISSUES PRESENTED BY APC COMMITTEE.
© 2007 Ideal Industries 1 of 32 Intro To Ideal 800 Power Analyzer Basics of IDEAL Industries 800 Series Power Analyzer.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
MicroSync Water Meter AMI Suite A Green innovation for a Better tomorrow.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Topic: Sir Naseem Ahmed Khan Dow Vocational & Technical Training Centre.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
Unit 1 Lecture 4.
Availability Based Tariff (ABT) in Northern Region.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
EKT 314/4 WEEK 2 : CHAPTER 1 INTRODUCTION TO EI ELECTRONIC INSTRUMENTATION.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Thayer J. Hendrickson.  Demand-Side Management is the idea of strategically controlling the customer’s electrical loads in order to reduce its maximum.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
By.  The main aim of this project is to get information about the condition of the baby, which is in ICU through blue tooth medium.  In earlier days,
Field Problems with Instrument Transformer Installations
CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar.
ENERGY METER TO INDICATE BILLING IN RUPEES FOR LOAD WISE OR DAY WISE
Sub Station.
What is ASEMR /ASKUE/ and the Need for Its Implementation
SCADA for Remote Industrial Plant
DIGITAL CALCULATOR USING 8051
McCrometer Nano Board Test Procedure
METER SPECIFICATIONS.
Financial Energy Management System (FEMS) Re-engineered by IT Department IT, H.O. Mumbai. 26 November 2018.
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Sizing Methodologies • Sizing Calculations
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
PowerLogic™ offer for the basic metering market
Presentation transcript:

Metering & Data Processing

1. WHAT IS METER ? A device which measures, indicates and records certain measurable quantity. 2. WHAT IS ENERGY METER ? A device which measures, indicates and records electrical power flow (energy) in a specified time between two points. 3. Pre Requisites of a Meter Purpose : Catering to Commercial needs Futuristic : Catering to foreseen needs Reliable : Repeatability Accurate : Good amount of money at stake

Classification of meters Interface Meter : Installed at interconnecting points between Generating company to Inter-state system Generating company to Intra-state system covered under ABT 2. Consumer Meter : Electrical utility to consumer not covered under INTERFACE meters 3. Energy Accounting and Audit Meters : Used between Gen Stns to different segments of electrical system determines Consumption of power Loss Our focus is on SEMs which are interface meters

What is Special Energy Meter(SEM)? SEM is an Application specific Microprocessor base solid state energy meter. This together with a data collecting device (DCD) and a local Computer forms a powerful system of metering and data logging. This arrangement of metering and data logging gives a unique method for measurement of all relevant electrical quantities.

Why metering is required? ABT, three part tariff : Capacity charge (a) Energy charge / Scheduled Energy charges (b) Adjustment for deviation/ Unscheduled Interchanges (c) Total payment for the day = a + b (+/-) c Reason of metering

What is Metering? Meter data handling Converting meter data into useful information Feeder wise Station wise State wise Region wise Its a challenging task for the utilities due to huge volume of data logged by these meters

Area covered by meters ISGS Sub Stations ICTS Feeders Any other drawl or injection points spread over the state, region and the country as a whole

Metering Management Initial/one time activities Choose the category of meter Selection of meter Installation of meters in strategic locations Deciding status of meters as Main, Check and Stand-by meters Periodic/maintenance activities Maintaining healthiness Periodic checking Time correction Periodic testing Replacement of meter (as and when required) Regular/routine activities Collection of data Transmittal of data to a central location for processing Processing meter data into useful information Archiving final processed data

Metering Standards Compliance with the relevant standards of Bureau of Indian Standards (BIS) If BIS Standards are not available for a particular equipment or material, the relevant British Standards (BS), International Electro-technical Commission (IEC) Standards Whenever an international Standard or IEC Standard is followed, necessary corrections or modifications shall be made for nominal system frequency, nominal system voltage, ambient temperature, humidity and other conditions prevailing in India before actual adoption of the said Standard At the time of commissioning, each interface meter shall be tested by the owner at site for accuracy using standard reference meter of better accuracy class than the meter under test.

Metering Standards All interface meters shall be tested at least once in five years The meters may be tested using NABL accredited mobile laboratory or at any accredited laboratory and recalibrated if required at manufacturer’s works. Active energy Wh  as per class 0.2 S of IEC-687/IEC-62053-22 Var/Reactive energy  class 2 of IEC-62053-23 or better IS standards to be followed w.r.t voltage range, frequency, power factor range, impulse voltage withstand test, power ferquency withstand voltage, power consumption etc

Special Energy Meter (SEM)

Features of Special Energy Meter(SEM) Works on 3 phase 4 wire principle Static meter Working voltage of 63.5V Accuracy class of 0.2S Show time stamping Measures: Average frequency Net active energy transmitted in 15 mins block wise Daily reactive energy transmitted in high / low voltage conditions

Features of Special Energy Meter(SEM) -ve sign if net Wh export Meter continuously integrates and can display on demand the net cumulative active energy sent out from the substation bus bars upto that time. The cumulative Wh reading at each midnight is stored in the meter’s memory. The register moves backwards when active power flows back to substation bus bars Meter counts the number of cycles in VT output during each successive 15-minutes block, and divides the same by 900 to arrive at the average frequency This is stored in the meter’s memory as a 2-digit code which is arrived at by subtracting 49 from the average frequency, multiplying by 50 and neglecting all decimals. E.g. 49.89 Hz is recorded as 44. In case the average frequency is less than 49.0 Hz, it is recorded as 00. In case it is 51.0 Hz or higher, it is recorded as 99.

Features of SEM The meter continuously computes the average of the RMS values of the three line-to-neutral VT secondary voltages as a percentage of 63.51 V, and displays the same on demand. The meter also computes the reactive power (VAR) on 3-phase, 4-wire principle, with Class 2 accuracy, and integrates the reactive energy (VARh) algebraically into two separate registers => 103% & <= 97% When reactive power is being sent out from substation bus bars, VAR display have a plus sign or no sign and VARh registers move forward When reactive power flows into the substation busbars, VAR display have negative sign and VARh registers move backwards. All 15 minute Wh figures is however be rounded off to the nearest last decimal but no rounding off for frequency/voltage displays

Features of SEM The three line-to-neutral voltage is continuously monitored and in case any of these falls below about 70%, a normally flashing lamp provided on meter’s front become steady. It go off it all three voltages fall below 70%. The time blocks in which such a voltage failure occurs/persists is recorded in the meter’s memory. The lamp automatically resumes flashing when all VT secondary voltages are healthy again. The meters normally operates with the power drawn from the VT secondary circuits. The meters are supplied duly fitted with the batteries, which shall not require to be changed for at least 10 years, as long as total VT supply interruption does not exceed two years. The battery mounting is designed to facilitate easy battery replacement without affecting PCB of the meter The meters don’t require any separate auxiliary supply for their operation. All displays may disappear on loss of VT supply.

Features of SEM Each meter has a built-in calendar and clock, having an accuracy of 30 seconds per month or better. The calendar and clock are correctly set at the manufacturer’s works Only limited clock adjustment is possible at site, using the DCD. When an advance or retard command is given, six subsequent time blocks is contracted or elongated by ten seconds each. The meter does not accept another clock correction command for seven days. All clock corrections are registered in the meter’s memory and suitably shown on print out of collected data. Each meter has a unique identification code, which is marked permanently on its front, as well as in its memory.

Features of SEM Identification code:: NP-four digit running serial number-A OR B  e.g. NP-6060-A “A” for Model-A, and “B”, for the use with CT secondaries of 1 A and 5 A respectively. A touch key or push button is provided on the meter front for switching on the display and for changing from one indication to the next Each meter has an optical port on its front for tapping all data stored in its memory Each meter is provided with a RS-485 port on one of it’s sides, from where all the data stored in the meter’s memory can also be tapped. Data stored in the meter’s memories is tapped once a week from any of the two ports mentioned above and transmitted to RLDCs by e_mail generally Meters are totally sealed and tamper proof, with no possibility of any adjustment at site, except for clock correction.

Features of SEM Meters continue to function for the remaining healthy phase(s), in case one or two phases of VT supply fails with recording of a lower reading corresponding to number of phases under outage In case of a complete VT supply failure, the computation of average frequency shall be done only for the period during which the VT supply was available in the 15-minute block

SEM Technical Specifications Standard : IEC-687 / IEC-62053-22 Accuracy Class : 0.2S Interface (Compatible with DCD) : With RS 485 Reference Voltage(Vref) : 110V.(P-P) Rated Current : 5A or 1A. Operating Voltage : +20% to -30% of Vref. Operating Current : 0.2% to 200% of Rated current

Types of SEM SEMs are of following two types : A-TYPE : Connected to VT having rated secondary line-line voltage of 110V and CT having rated secondary current of 1A. B-TYPE: Connected to VT having rated secondary line-line voltage of 110V and CT having rated secondary current of 5A. It operates with power drawn from the secondary circuits and no auxiliary power supply required.

Operating section of (SEM) a) Analog Section: High precision Current transformer and voltage transformer step down input currents and voltages which are fed to an Analog to Digital converter. b) Digital Section: A powerful microprocessor controls the Analog and Digital sections. Analog to Digital converters are fed from high precision instrument transformers. The Digital samples from Analog to Digital converter are used to process the metering data. The sampling rate is 3000 samples per second which gives the meter an exceptional accuracy and results. c) Power supply Section: A switch mode power supply (SMPs) unit supplies power to the meter’s internal circuit.

Data stored in a SEM Each meter has a non-volatile memory in which the following is automatically stored: i) Average frequency for each successive 15-minute block, as a 2-digit code ii) Net Wh transmittal during each successive 15-minute block, upto second decimal, with plus/minus sign iii) Cumulative Wh transmittal at each midnight, in six digits including one decimal iv) Cumulative VARh transmittal for voltage high condition, at each midnight in six digits including one decimal v) Cumulative VARh transmittal for voltage low condition, at each midnight, in six digits including one decimal vi) Date and time blocks of failure of VT supply on any phase, as a star (*) mark The meters store all the above listed data in their memories for a period of ten (10) days Data older than ten (10) days get erased automatically.

Display parameters of SEM Display Parameter Indication Display format Meter identification code A NP1234A Date (day, date, month, year) d dd-mm-yy Time (hour, min, sec) t hh:mm:ss Cumulative Wh reading c xxxx.x Wh Reactive Power Pr xxx:x VAr Average freq. of previous block F xx:xx Net Wh transmittal-previous block E xx:xx Average % voltage U xx:xx Voltage high VArh register reading H xxxx:x VArh Voltage low VArh register reading L xxxx:x VArh Real time indication rtC Fit Low battery indication Low Bat

Classification of SEMs Main Meter : means a meter, which would primarily be used for accounting and billing of electricity. Check Meter : means a meter, which shall be connected to the same core of CT and PT to which main meter is connected and shall be used for accounting and billing of electricity in case of failure of main meter. Standby Meter : means a meter connected to CT and VT, other than those used for main meter and check meter and shall be used for accounting and billing of electricity in case of failure of both main meter and check meter;

Location of Meters Location Main meter Check meter Standby meter Generating System On all outgoing feeders HV side of GT HV side of Station Aux. Transformers Transmission System At one end of the line between the S/Ss of the same licensee and at the both ends of the line between S/Ss of two different licensees. Meters at both ends shall be considered as main meter. There shall be no separate standby meter. Meter installed at other ends of the lines in case two different licensees shall work as standby meter. ICT HV side of ICT LV side of ICT

Location of Meters Philosophy of installation For GENERATING Stations Out going feeders CHECK METER MAIN METER 400 KV BUS STAND BY METER STN TRANSFORMER GENERATOR

Location of Meters For ICTS 400 KV BUS MAIN METER ICT STAND BY METER Main meter is provided on EHV side of ICT and stand by meter on LV side of ICT. 400 KV BUS MAIN METER ICT STAND BY METER 220 KV BUS

Location of Meters For Inter-state lines. SEB-B SEB-A A B MAIN METER STAND BY METER STAND BY METER

Location of Meters Metering arrangement for POWERGRID lines. On POWERGRID lines, unless an end is regional energy accounting point, an Energy Meter is provided only at one end of each line. The readings recorded by these meters are being used for information and analysis only, and not for the energy accounting purposes.

Measurement principle of SEM Net Wh Transmittal during each successive 15-min time block up to second decimal, with plus/minus sign. Cumulative Wh transmittal at each midnight in 6-digits including one decimal It works in real time with the help of an in-built clock. Average frequency of 15 mins block as 2 digit code ( 00 to 99 ) Actual freq = 49 + ( 2digit code / 50 ) e.g. If, SEM shows 2 digit code of 55 as frequency code, The actual frequency = 49 + (55 / 50) = 50.1 Hz Cumulative VARh transmittal for high voltage condition at each midnight ( V > 103% of Rated Voltage) Cumulative VARh transmittal for low voltage condition at each midnight (V < 97% of rated Voltage) Data for Time blocks of failure of VT supply on any phase has a star mark as prefix.

Special Energy Meter (SEM) Each meter has an optical port to access data stored in its memory. Hand held data collection device (DCD) are used as an interface between the meters and the PC Meters can store 10 days data. Data downloaded in coded form (*.MRI, *.DAT) and is converted to Text file (*.NPC) through software SMARTGRID/ VINCOM. Each day data, is of the following form Meter no Watt hr Var – High Var – Low Date NP–4201–A 63895.0 97845.8 74358.6 12 – 10 - 07 Meter no is of nine character starting with NP and A or B at the end indicates the type of CT used. Any voltage problem is indicated by a star “*” mark preceding the energy data.

Testing of SEMs-general norms On-site functional checking and rough testing of accuracy are being carried out for all meters once a year by the CTU Full testing for accuracy for every meter is being carried out by the CTU at an accredited laboratory once every five (5) yrs. with meter of higher accuracy class The constituents/agencies may depute one authorized representative to witness the tests. Normally no re-calibration is required. In case a meter is found to violate any of its accuracy , functional requirements during the above periodic accuracy checks, the same is replaced by CTU by a duly tested/certified meter, and the defective meter is sent back to the manufacturer for appropriate recalibration and re-certification

Fictituous meters Fictituous meters(FICTMTRS) are a combination of METERS treated as a single entity. e.g. (i) Total drawal of an SEB (ii) Total relief from a generating station (iii) Total transaction of energy between two regions. FICTMTRS used to simplify the calculation process Every fictitious meter is basically summation of certain no of Real meters. E.g. (FK-92) = +(FK-08) +(FK-09) +(FK-10) +(FK-11)+(FK-12) +(FK-13) +(FK-17) +(FK-15) +(FK-16) i.e FK92 represents TOT FSTPP Gen = sum of all real main meters installed in all the outgoing feeders from FSTPP Such FICTMTRS are incorporated vide a .cfg file where the above formulae are listed in format readable by the software code

Metering arrangement-Typical view-TSTPP-I

Pairs.Dat File This file gives the LOC-ID of main meter and standby meter and the permitted pair tolerance for each pair. Main meters are those which are connected on 400 kV side of ICT or generator side of power station or sending end of inter state lines The standby/check meters are on the other end Standby meters are connected in reverse polarity so that sum of both MWh is zero in ideal condition. Suppose E.g. the power flow is from main meter to standby meter, the main meter gives a +ve value and standby meter gives a –ve value and vice versa. Tolerance value in MWh for a 15 min block in +ve direction & -ve direction is given in this PAIRS.DAT, depending upon transformer /Line losses & CT/PT errors The given tolerance value towards +ve side is called X value. The tolerance value towards –ve side is called Y value.

Data Collecting Device (DCD)

Data Collecting Device (DCD) DCD is a hand held terminal, capable of communicating with SEM as also with PC. Both communication requires suitable software at both DCD and SEM Features: Battery operated It has a key board / pad LCD display screen Communication slot

SEM data collection through DCD Conventional data collection method for past 12 years. DCD with Optical Cord Optical port in SEM

Data collection through RS-485 What is RS-485? Two wire connectivity (having ground) between meter and PC. Enables automatic data downloading from all the meters in a location to a local PC. No need of DCD

Connection Diagram : RS 485

Processing, Checking & Validation of SEM data

Data processing of SEM data Raw data is sent to RLDCs every week by Tuesday noon from sites through e-mail. Raw data is converted to text files. All text files are appended to a single text file. Korba end SEM is used as master frequency meter. Actual energy is calculated by a software as per configured fictitious meter. Daily Output MWh pertaining to drawal/injection/IR exchange is created. Daily Regional output file for the week period is created. Regional loss is calculated after processing. RLDCs send processed SEM data to respective RPCs.

Data checking & Validation Identification of any metering error can be done through three broad categories of checks. End1- End 2 (using pair check) Net bus check of Generators using Kirchhoff’s law. Net bus check of substations using Kirchhoff’s Checks are also carried out to ascertain time drift in the meters with reference to Master meter.

Thank You!