Tritium Management by Design

Slides:



Advertisements
Similar presentations
CAC Meeting May 20, 2008 Computer Modeling of Impacts.
Advertisements

Best Available Techniques (BAT)
The Committee and Research – Where are we and where might we be going?
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
Sejkora: What is RETS-REMP?
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Constellation Energy “The Way Energy Works” PWR Tritium Issues G. C. Jones.
International Atomic Energy Agency IX.4.3. Waste management.
14th Annual RETS/REMP Workshop June 28-30, 2004 U.S. Nuclear Power Sister Plant Radiological Effluent Release Comparisons J.T. Harris 1,3, D.W. Miller.
Environmental Legislation in Pakistan – Compliance Perspectives Ibad ur Rehman Deputy Director (Projects) Cleaner Production Institute.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Improvements in Liquid Effluents Greg Jones, Radiochemist R.E. Ginna Nuclear Station Ontario, New York.
W A RNR WASTE AND RECYCLING NATIONAL REPORTING. Current NZ Position No national database Lack of consistency, methodology and frequency - OAG report Historically.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Implications of Heavy Metals in Sewage Sludge Where Do We Stand on Regulations?
1 The Cost of Organizational Structures and Interfaces prepared for Ground System Architectures Workshop by Darryl W. Webb Business and Operations Analysis.
Cleaner Production Assessment (Chapter 4)
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Life Cycle Assessment (LCA)
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
TRP Chapter Chapter 4.2 Waste minimisation.
MODULE “STRATEGY DEVELOPMENT”
1 Shannon M. Lloyd U.S. EPA 2004 Nanotechnology Science to Achieve Results (STAR) Progress Review Workshop – Nanotechnology and the Environment II Philadelphia,
Copyright The Solution Foundry. All rights reserved. WELCOME TO ENVIRONMENTAL ASPECTS 101.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
Working Group 1 Reference and Graded Approaches for Assessing the Impact of Radioactive Discharges.
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
NSF/SRC Engineering Research Center for Environmentally Benign Semiconductor Manufacturing Beaudoin, et al. 1 Environmental Impacts of Manufacturing Stephen.
Material Flow Analysis
World Nuclear Association 38th Annual Symposium September 2013, Central Hall Westminster, London Nuclear Operation and Radioactive Waste Management.
Life Cycle Overview & Resources. Life Cycle Management What is it? Integrated concept for managing goods and services towards more sustainable production.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Climate Policy Development Tom Peterson The Center For Climate Strategies August 25, 2005.
Identifying Source Reduction Opportunities and Engineering Trade-Offs Kenneth R. Stone Engineering Trade-Offs Team Leader Kenneth R. Stone Engineering.
Tritium in The Demin Water System -- An IE Bulletin Challenge Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 12 th Annual.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
Analyze Opportunity Part 1
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Executive Invitation – Oracle Data Finder Service Oracle Corporation.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Office of River Protection 2015 Hanford ORP Site Status Report
1 Responsible Care Partnering Workshop Industrial Waste Initiative 24, 25 September 2013 Manal Al Badawi On Behalf of the Industrial Waste Sub-Committee.
MATERIAL BALANCE METHODOLOGY Julia Brown Manager, Process Development.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Dale Holden Duke Energy.  Programs established in 1970’s and 1980’s  Required for licensee  Preoperational and Operational  “check” on effluent releases.
Chapter 3 Strategic Information Systems Planning.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
Life Cycle Assessment (LCA)
LIFE CYCLE ASSESSMENT (LCA). As corporations seek to improve their environmental performance they require new methods and tools. LCA is one such tool.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
IN BIOPROCESS INDUSTRY Introduction to Waste Treatment
Objectives Finish analysis of most common HVAC Systems
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Green and Sustainable Remediation (GSR) Overview
TechStambha PMP Certification Training
EPRI Development of Nuclear Power Plant Implementation Guide for NRC Branch Technical Position on Concentration Averaging and Encapsulation Presented.
Communication and Consultation with Interested Parties by the RB
Overview of the Minamata Convention On Mercury
Presentation transcript:

Tritium Management by Design Paul Saunders Suncoast Solutions, Inc.

History EPRI Report “Strategies for Managing Liquid Effluents – Options, Actions & Results” # 1008015 released in 2003 Developed by EPRI & a team of industry experts Liquid radioactive waste processing Liquid and solid effluents Chemistry Sensible long-term liquid processing effluents strategy evaluation

The industry’s liquid effluent activity continues to trend down The industry’s liquid effluent activity continues to trend down. This is good! But……….just when you think you have it made…….. 3H

Balanced Effluents Program (BEP) EPRI Effluents Strategy Project Reaffirmed the importance of balancing a site’s liquid, solid, and gaseous effluents Tritium management is one area that many stations continue to struggle to manage Production Concentration Control Consequences Environmental impact, site exposure, cost

Historical “Solutions” Several stations use unique tritium strategies Operational Processing Not always coordinated with other programs Not always effective Increased inventory Spikes, increased plant exposure, etc.

“Treatment” Options ‘Conventional’ disposal with solid waste Can’t ion exchange, concentrate, cost effectively remove, place into solid form Release as Effluent Liquid: varies by site Gaseous: used by all plants

Issues Limiting production of H-3 3H concentrations in coolant will increase Later planned releases result in “obvious” spikes in liquid effluent activity ANI premium impact Public perception, risk becoming public opinion issue Managing effluent source mechanisms Manage releases, temperature, humidity, air exchange Airborne dose > Liquid dose

Zero release = zero production Issues (continued) Plants were designed, constructed, and licensed to release liquid and gaseous effluents Zero release = zero production Evaluating and comparing plants on the basis of liquid volume and activity discharged may Lead to erroneous performance evaluation Impact cost effectiveness of program Increase dose to workers Increase dose to the public HOW DO I MAINTAIN A SUCCESSFUL, DEFENSIBLE PROGRAM?

Balanced Effluents Program The Plan EPRI tasked by utilities to develop an interactive tritium analytical software tool to evaluate actual or proposed program changes Project directed and supported by an industry expert team Primary Goal Make informed decisions that support a Balanced Effluents Program

Objectives Develop interactive tritium analytical tool Input actual and hypothetical plant data Based on site ODCM and operating practices Use that information to: Evaluate program changes Track and trend data

Objectives (continued) Provide graphical output display Capture production, inventory, and effluents Real time or projected values for tritium concentrations Additional reports as recommended by a utility support team The tool not intended to replace existing pathway modeling software Is intended to complement its effectiveness.

ID Plant Design Performance Generic production mechanisms ID plant specific mechanisms Define plant specific boundaries Design FSAR Inventory

Quantify Actual Performance Production Calculation Quantify plant specific results ID current plant goals Inventory Plant values/ quantities Known and design unknown (sumps, etc) Other unknown (unidentified, analytical error) Point of origin for tritium inventory Inventory impact factors

Quantify Actual Performance (cont.) Effluents Accountability by effluent stream ODCM NO PATHWAY MODELING IN THIS TOOL Mass Balance Perform a mass balance Production, inventory, and effluents V&V model and define current state

Evaluate Results (investigation phase) Benchmark plant effluent values with Industry Experience Regulatory EPRI ANI INPO Possible link to Industry sources

Evaluate Design vs. Actual (investigation phase) Consequence Analysis ODCM & R.G. 1.109 pathway analysis, dose Identify each forms’ contribution to environmental impact Compare analysis results to model & design predictions For each effluent stream and pathway analysis Determine reason for discrepancies Conduct source analysis of abnormal results

Consequence Analysis (cont.) Evaluate current performance impact Effluent values versus pathway impact Effluent values versus on site exposure Baseline cost analysis Define intangible and soft issues

Evaluate Options Improvement or Redirection Liquid Recycle primary water Recycle all waste Alter release strategy Develop strategic release protocol (feed and bleed) Solid waste Treatment, VR, and disposition options Solidify Incineration Pyrolosis Direct burial environmental impact

Evaluate Options Improvement or Redirection Airborne Evaporator use Inventory tanks/ pools Release elevation Atmosphere temperature Humidity Leaks Containment purges Stack flow rate Dehumidify Cooling towers SFP (impacts all three forms) Inventory manipulation Temperature, HVAC, humidity Investigate new technology

Acceptability Determination Performance Options Evaluate acceptability of results Benchmark, site specific results, consequences, investigation results, costs Identify improvement opportunities Define potential path forward Perform an impact analysis (sensitivity) for each option Cost benefit Consequence Mass balance Pathway analysis Intangible/ soft issues/factors/benefits

Completion Path Plan/Recommendation Approval Validation Develop management plan Prioritized actions Goals – success measurement Document plan with supporting documentation Approval Peer group – sanity validation Senior management – concurrence and resources Validation Evaluate actual results versus plan projections

Multi Year Project Driven by utility sponsorship 2004 Develop technical skeleton for software Team concept EPRI Utilities – your participation is needed & welcome! DOE WSRS Contractors ANI First meeting held May 6 Second meeting in Fall TBD based on team input and outage schedules

2005 & Beyond 2006? Complete tool design Final document Software has not been funded to date Requires utility support through EPRI fund direction 2006? Tritium management tool for delivery to utilities Special thanks to Ken Sejkora and the Tritium Team Ideas? Questions? Concerns?