Zero Discharge Water Management for Horizontal Shale Gas Well Development DE-FE0000833 Paul Ziemkiewicz, PhD, WVU Principal Investigator Jennifer Fulton,

Slides:



Advertisements
Similar presentations
Bethany Kurz Energy & Environmental Research Center.
Advertisements

RELIABLE REDUCTION & RECOVERY SYSTEMS Efficient Solutions to Difficult Water Treatment Problems.
August 2014 Rational for the Acquisition of Stimsol Business from Arcan Resources Ltd and the Creation of BlendForce Energy Services Inc. Fortaleza Energy.
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
Intel Water Reclaim Project Final Report 5/25/05.
SESSION: DEICER MANAGEMENT SOLUTIONS Salt Management Research in Virginia Jimmy White, Virginia Center for Transportation Innovation & Research The Virginia.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Sustained Treatment of AMD Containing Al and Fe 3+ with Limestone Aggregate Neil Wolfe and Robert Hedin Hedin Environmental West Virginia Mine Drainage.
Hydraulic Fracturing Best Management Practices Environmentally Friendly Drilling Program John Michael Fernandez Matthew Gunter.
Microwave Soil Vapor Treatment CHA Corporation Field DemonstrationWINTER 2004 CHA Corporation 372 W. Lyon Laramie, WY Telephone:(307) Fax:(307)
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
An Introduction to Acid Mine Drainage by George Mitchell and Tim Craddock.
Unconventional Gas: Shale Gas Shale Gas  Unconventional gas (hydrocarbons) found in subsurface shale formations  Replacement to coal, oil, and natural.
OVERVIEW OF PETROLEUM ENGINEERING.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
TRP Chapter Chapter 4.2 Waste minimisation.
Mission-Critical Work in the Water/Wastewater Industry.
Civil and environmental engineering Use of Abandoned Mine Drainage for Hydraulic Fracturing in Marcellus Shale Radisav D. Vidic Department of Civil and.
1 May 2010 Unconventional Gas- Shale gas, tight gas and coal seam gas.
Business Opportunity EPRS Energy Co. Inc.. Overview World-wide oil production has been declining for decades. There are over 400,000 stripper or marginal.
1. © 2013 Petroch Services Pty Ltd BP Version J11002– Occupational Hygiene in the Oil & Gas Industry Occupational Hygiene in the Oil & Gas Industry Day.
Making Waste Productive. Creating Energy from Waste.
Marcellus Shale Wastewaters Management by Resource Recovery Shale Gas Innovation Contest Ben Franklin Technology Partners April 13, 2012 Timothy Keister,
Landfill Processes. Objectives  Describe the physical, chemical, and biological processes occurring in a landfill  Describe leachate quality (Table.
Fresh Water in Dry Regions: Desalination Answers
Water Quality Issues with Wells
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
Server Virtualization: Navy Network Operations Centers
Concept Report / Preliminary Technical and Cost Analysis Delivery of Treated Produced Water from Indian Basin and Dagger Draw to the Pecos River, Eddy.
Preliminary Assessment of the Microbiology of Marcellus Shale Fracture and Flowback Waters Website: Customer Service:
Volvo Group North America, LLC Reuse of Wastewater - A Manufacturer’s Experience Steve Pierett, Env.Mgr. CEM, CRM, CP EnMS-Industrial.
SPWSTAC 2006 From POU to Centralized Arsenic Treatment: A Small Water System Case Study 2006 NGWA Naturally Occurring Contaminants Conference J. Mitchell.
ISO OPERATIONAL CONTROL
Managing Coal Bed Methane Produced Water for Beneficial Uses, Initially Using the San Juan and Raton Basins as a Model Mike Hightower Sandia National Laboratories.
Marcellus Gas Drilling and Water Resources PA’s abundant water resources - a blessing and a concern Bigger rigsMore wastewaterMore waterMore disturbance.
Effective Project Planning, Community Capacity Building, & Partnership Development in Indian Country LT Bradley Sherer Environmental Engineer Indian Health.
LEWIS ENVIRONMENTAL Cost Effective Solutions For …. Today’s Problems UPGRADING AMD FOR FRACKING WHO’S LEWIS ENVIRONMENTAL… COMPANY HAS SEVERAL PATENTS.
 Definition ◦ Scale up studies refers to the act of using results obtained from laboratory studies for designing a prototype and a pilot plant process;
1 CERTIFIED SOLIDWORKS ASSOCIATE (CSWA) EXAM Nov 26, 20119:00-12:00 Dec 3, :00-12:00 SEB1015 NOTES We’ll take registrations in November but you’ll.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
Evaluation of Non-Traditional Sources of Cooling Water Sujoy Roy and Michael DiFilippo Tetra Tech Inc, Lafayette, CA and MND Consulting, Berkeley, CA EPRI.
FOOD ENGINEERING DESIGN AND ECONOMICS
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
Decommissioned BCR Organic Media Characterization Standard Mine Superfund Site, Crested Butte, CO Neal Gallagher, Eric Blumenstein, Tom Rutkowski, John.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Northern Great Plains Water Consortium (NGPWC) Bakken Water Opportunities Assessment Water Resource Opportunities Meeting Bismarck, ND December 10, 2009.
Produced Water Treatment For Recycle 22 nd IPEC – Denver, CO Dan Mueller, P.E.
Hydraulic Fracturing in the Ohio River Basin. –Conventional vs. nonconventional (continuous) Overview of Hydraulic Fracturing.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Frack Flowback Water Opportunity Across the Eagle Ford Shale Alex Gupta, James Lamb, Zhengwang He Advised by Dr. Fred Beach and Professor John Butler The.
Practical Treatment of Produced and Flow-back Waters for Re-use or Surface Discharge Eric Ringler, Bill Chatterton (SR) Joon H. Min, Allen Chan (BKT Co.
Hydraulic Fracturing Tom Carr, Lauren Dynes, and Pete Strader.
Water Quality Concerns WRI and DEP Data Water Quality Concerns.
1 1 Presenter / date if required Independent, integrated thinking.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Game-Changing Technology for Oil Water Separation. The Development of the RJOS High Efficiency Oil Water Separation System Presented by Wade Bozak C.E.T.
Dr. James Conner Fairbanks North Star Borough November 8, 2012 Dr. James Conner Fairbanks North Star Borough November 8, 2012.
Oilfield Waterscape Navigating New Currents in Hydraulic Fracturing 1 Paul Pistono Senior Vice President Sales & Marketing Rockwater Energy Solutions.
Paul Eger, Global Minerals /Sovereign Consulting Peggy Jones, Doug Green, American Peat Technology Igor Kolomitsyn, Natural Resources Research Institute.
Innovations and Demonstration of Novel Mine Water Treatment Technologies Dr Jo Burgess Research Manager: Mine Water Treatment and Management Water Research.
Engineered Water Treatment Solutions
Electrocoagulation Treatment of Heavy Metals from Mine Impacted Water
Treatment – Ion Exchange Filters
Mohr Separations Research, Inc.
Presentation transcript:

Zero Discharge Water Management for Horizontal Shale Gas Well Development DE-FE Paul Ziemkiewicz, PhD, WVU Principal Investigator Jennifer Fulton, MS, WVU Project Manager Doug Patchen, PhD, WVU Geologist Harry Johnson, FilterSure Project Manager C. David Locke, FilterSure Petroleum Engineer Ron McIlwain, FilterSure President 17 th Annual International Petroleum & Biofuels Environmental Conference San Antonio, Texas August 31, 2010 West Virginia University Water Research Institute1

Background West Virginia University, supported by FilterSure, Inc., was selected by the Department of Energy in 2009 to develop: “Zero Discharge Water Management for Horizontal Shale Gas Well Development.” The project is designed to be conducted in two phases, summarized as follows: West Virginia University Water Research Institute 2

Background – Phase I Evaluate treatment options for recycling frac return water (FRW) at WVU research facilities. ◦ Base system is the FilterSure filter, a 2-gpm Process Development Unit (PDU) ◦ Evaluate pre- and/or post- filtration treatment options ◦ Use real Marcellus Shale FRW Phase I ends with a decision to construct a prototype mobile unit West Virginia University Water Research Institute3 Dave Munyan, FilterSure operator

Background – Phase II Following decision to proceed: ◦ Fabricate a mobile prototype unit (similar to unit shown at right) ◦ Conduct sustained test at an active field drilling site. ◦ Evaluate results Apply the technology in commercial applications West Virginia University Water Research Institute4 Automated 30 US GPM Mobile Unit (7 m³/hr, 1000 bbl/day)

Phase I Industry Group Industry contact group assembled ◦ Abarta Energy, Covalent Energy, Chesapeake Energy Corporation, Energy Corporation of America, Gastem USA, Marathon Oil Company, Range Resources, and Universal Well Services Industry group queried for basic frac procedures, general information, and frac water requirements ◦ Outstanding industry response, providing valuable data. ◦ Industry group provided FRW for testing at WVU as well as valuable advice on what would help them most. West Virginia University Water Research Institute5

Phase I Survey Phase I Survey Water requirements obtained from 6-page survey Information on volumes, storage, quality, transport West Virginia University Water Research Institute6

Phase I Survey Highlights Phase I Survey Highlights Slickwater frac is dominant type of treatment Frac sizes for most horizontal wells range from 4 million to 6 million gallons (up to 10 stages) using as much as 250 tons of sand/stage. Vertical well fracs are similar in size to a single horizontal well stage, about 500,000+ gallons, usually in a single stage, with a total of 250 to 500 tons of sand. West Virginia University Water Research Institute7

Phase I Survey Highlights (cont.) Phase I Survey Highlights (cont.) Frac return water is ~10 to 20% of the amount injected. After days flow back is greatly reduced and is considered produced water Flow-back rates during first 7 – 14 days may average 3, ,000 barrels/day, declining rapidly to a few 100 bbl/day. Further decline is gradual, 10 to 20 b/day, after a few months Both horizontal and vertical wells are successful upon stimulation, but horizontal wells appear to provide better economics. West Virginia University Water Research Institute8

Phase I Survey Highlights (cont.) Phase I Survey Highlights (cont.) Frac water Requirements ◦ Chlorides < 70,000 mg/L ◦ TDS <120,000 mg/L ◦ TSS not defined ◦ pH from 5.5 to 8.0 ◦ Multivalent ions – Should be limited but no specific cutoffs cited, except for Fe (<500 mg/L) and SO 4 (<50 mg/L) ◦ Bacteria < 10,000 counts (bugs/ml) West Virginia University Water Research Institute9

Recycling is Widely Practiced, Solves a Problem, but… Operators are concerned that untreated water may damage gas production. ◦ Micro-fractures may become plugged with residual chemicals, precipitates, or shale fines. ◦ Communication with reservoir may be reduced or lost entirely. Field Case Studies are Needed to Document Frac Treatment Effects on Gas Production. ◦ These studies need to be done, but will take years to complete. ◦ Water cleanup now will reduce/eliminate productivity concerns until definitive studies are completed. West Virginia University Water Research Institute10

Common Sense + Science Common Sense + Science Some Frac waters are better than others ◦ TSS should be low – don’t pump something that could plug the miniscule reservoir permeability ◦ TDS is a potential problem, but focus on controlling sulfate, calcium, iron, magnesium, barium, and strontium ◦ Solubility of scale-forming multivalent ions are pressure and temperature dependent. High pressure fracture treatment causes dynamic changes in both. ◦ Eliminate bacteria. West Virginia University Water Research Institute11

Phase I Technical Approach Phase I Technical Approach Develop and Test Treatment Methods WVU acquired and tested four frac water samples with TDS ranging from 10,000 – 185,000 mg/L Chemistry was determined, including radioactivity (none detected) and hardness (4,000 – 50,000 mg/L) Particle Size Distribution and Total Suspended Solids were used to select and sequence filter media Electrocoagulation (EC) Followed By FilterSure Filtration Has Proven To Be Effective West Virginia University Water Research Institute12

Continuous Process Flow Demonstrated Laboratory scale EC Unit West Virginia University Water Research Institute 13

West Virginia University Water Research Institute14 EC Shifts Particle Size Distribution

Crystal Clear Water Produced By EC And Filtration West Virginia University Water Research Institute 15

West Virginia University Water Research Institute 16 32% Dissolved Solids Removal FilterSure only EC then FilterSure Rawpost UnitWaterFilterSure% Δ Post ECFilterSure% Δ net dissolved Clmg/L 17,100 13,000-24% 14,800 12,600-15% -26% Namg/L 8,530 7,260-15% 9,050 4,960-45% -42% Camg/L 1,610 1,540-4% 1,870 1,040-44% -35% Srmg/L % % -24% Kmg/L % % -15% Mgmg/L % % -36% Bamg/L % % -59% Femg/L % 0 00% -99% SO4mg/L % % -52% calc TDSmg/L 28,183 22,712-19% 26,612 19,227-28% -32% anions cations ratio 100%87% 81%123%

West Virginia University Water Research Institute 17 99% Suspended Solids Removed FilterSure only EC then FilterSure Rawpost UnitWaterFilterSure% Δ Post ECFilterSure% Δ net ECµS/cm 66,300 51,000-23% 61,500 48,800-21% -26% TDSmg/L 38,700 28,200-27% 35,000 26,800-23% -31% Hardnessmg/L 4,890 4,650-5% 5,620 3,960-30% -19% TSSmg/L % 5, % -33% TOCmg/L % % 56% pH %

Success Criteria for Moving to Phase II 1. Technical capability – will the technical design achieve target water quality? 2. Economics – will a commercial design have the potential to improve on cost of hauling and disposal of frac return water? West Virginia University Water Research Institute18

Prototype Mobile Unit Major Components 5 th Generation FilterSure 30-GPM Unit Access Hatch to Change Media, If Needed Commercial 30-GPM Electro-Coagulation Unit 36 West Virginia University Water Research Institute

20 Five chambers hold media increasing filter capacity by 400% over conventional filter Proprietary media carefully selected for Marcellus Shale testing program Manual operation at WVU but commercial unit will be automated o Automatic bypass valve o Automatic backwash o Low backwash volumes o Low pressure ops (30 psig) FilterSure TM Technology Highlights West Virginia University Water Research Institute20

Phase II Finalize System Design and Determine Costs The preliminary design of the MTU will be finalized, cost quotes obtained, vendors selected, and equipment ordered. Fabricate Mobile Treatment Unit (MTU) The MTU will be fabricated and subsystems integrated, including data acquisition instrumentation needed for remote monitoring of automatic operation of the unit in the field. The unit will be tested at the fabricators facility and problems fixed before shipment to the field. West Virginia University Water Research Institute21

Phase II (Cont.) West Virginia University Water Research Institute22 Install the Mobile Treatment Unit in the Field The MTU will be installed at a producer location. Additional water storage may be needed, and will be coordinated with the producer’s plans for current and future drilling. MTU Testing and Startup Installed MTU will be inspected and determined ready for testing. Any problems will be fixed. Startup will be coordinated with producer.

Phase II Tasks (Cont.) MTU Operations, Monitoring, Maintenance On-site operations will last months. Initially monitored by technicians, operations will transition to electronic monitoring. Maintenance schedules will be established. MTU Decommissioning MTU will be decommissioned at the end of the test plan period. Ownership will transfer to FilterSure who has guaranteed the industry cost-share for this effort. MTU Demonstration Report A formal and complete MTU demonstration report will document the Phase II activities. West Virginia University Water Research Institute23

Preliminary Capital Cost Estimates Major commercial cost elements reasonably well known: o 30 GPM electrocoagulation unit o 30 GPM FilterSure unit o Construction costs Economics remain favorable West Virginia University Water Research Institute 24

Expected Impacts On Gas Industry Recycled water can be reused indefinitely ◦ >99% suspended solids removed ◦ Salinity stabilizes by 3rd recycle ◦ Water meets or exceeds recycle requirements Eliminate leaching liability concerns ◦ EC converts metals to complex particles ◦ Solids should pass EPA non-hazardous leach test West Virginia University Water Research Institute25

Less frac water to be hauled Zero frac water for disposal Lower roadway, traffic impacts Lower pollution from fugitive dust, engine exhaust, muddy streams Reduce regional water demand West Virginia University Water Research Institute26 Expected Impacts On Gas Industry (Cont.)

Acid Mine Drainage Possibilities Industry has expressed a strong interest in using AMD to extend water supplies Initial AMD tests using EC and FilterSure favorable Additional research required to develop a viable commercial process West Virginia University Water Research Institute 27

Commercialization Schedule Complete Process Proof of Concept Demos o Early September 2010 Reach Decision to Proceed o End September 2010 Construct and Startup 30-GPM Mobile Unit o Spring 2011 Complete DOE Contract o End September 2011 West Virginia University Water Research Institute28

Summary Research ahead of planned schedule Batch testing of EC/FilterSure successful Continuous process demonstration successful Decision to proceed - end of September 2010 West Virginia University Water Research Institute29

Summary (cont.) Prototype 30-GPM Mobile Unit o Designed, constructed, and in the field by Spring 2011 o Operations proven by Summer 2011 o Contract complete by end of September 2011 Commercial 70-GPM Units o Could begin field operations by Fall of 2011 West Virginia University Water Research Institute30