LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Preconditions for operating at 5 TeV in 2010 Session th January 2010 J. Wenninger BE/OP How to safely reach higher energies and intensities? Settings.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
MP overview: experience and scaling to /29/2015JW - BC Workshop - Evian - Jan J. Wenninger Inspired by the discussions, commissioning shifts,
Weaknesses of the LHC Machine Protection System Bernhard Holzer, CERN BE-ABP... what a MPS should do: 2 major tasks * protect the machine in case of hardware.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
1 Operational availability Optimizing LHC L. Ponce With the (un)intentiona lcontribution of all OP crew.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
1 Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag Jörg Wenninger AB-OP-SPS Introduction to ‘injection flags’ Machine.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LHC Beam Operation WorkshopM. ZerlauthDecember 2011 Thanks to : rMPP and MPP members, K.Fuchsberger, M.Galetzka, B.Goddard, R.Schmidt J.Wenninger, et al.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday 11/07: Recovery Plenty of accesses.
Initial Experience with the Machine Protection System for LHC
Tuesday TOTEM and transverse loss map (1) OK
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Summary of Week 16 G. Arduini, J. Wenninger
Planning at 5 o’clock meeting Friday
Aims for the week Recover from technical stop and precycle at 10A/s
Machine Protection System Commissioning plans
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Can operation put the MPS in a unsafe state?
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Interlocking strategy
Friday 15th February - morning
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system response? Review of Protection Dumps in 2010 Analysis of suspicious events, are there potential holes ? Are tools and procedures adequate? Envisaged changes for 2011 run

CERN LHC beam commissioning Workshop - Evian Review of Protection dumps 2 During 2010 run we counted 1280 breaking of beam permit loops 640 with beam in the machine 370 where the energy ramp had started Each dump is exercising parts of the machine protection infrastructure and used to assess the correctness of its response Dump summary is stored in database (time, cause, intensities, energy, operator comments, classifications, fill duration/integrated luminosity…) - [11] Breaking of BPLs in 2010 Breaking of BPLs above injection current

CERN LHC beam commissioning Workshop - Evian Machine ‘availability’ seen from PM (Indirect) measure of machine availability: fraction of fills terminated with a programmed dump (counted from a given date until the end of the 2010 run) Yearly average: 8% of all fills, 17% of ramped fills During Ion run: 23% of all fills, 38% of ramped fills Confirms steep learning curve in addition to intensity increase of factor >10 4 All fills Fills where ramp has started

CERN LHC beam commissioning Workshop - Evian Main challenges during 2010 run (> injection) SIS (TCDQ Position, missing energy) Magnet Powering (Orbit Feedback, etc..) Collimator interlocks during ramp Magnet Powering (OFB/QFB, QPS sector trip,..) Loss Maps, Collimator setup, Fast losses ATLAS Magnet Powering (Mostly PC issues + FB, CRYO,..) Fast losses, loss maps,… SW Permits (TCDQ position, trip of DOCs) Loss maps, wire scanner tests, collimators moving… SW Permits (TCDQ position,…) Magnet Powering (Mostly PC issues, …) >> Fast Losses (UFOs) Magnet Powering (QPS, CRYO, PC,.. ) SW Permit (Orbit, BLM lost in IR7…) Electrical Perturbations Beam dumps as a function of beam mode for fills where energy ramp started and main causes of loosing the beams…

CERN LHC beam commissioning Workshop - Evian BLMs as ‘ultimate’ protection? 5 During 2010 run, 47 dumps out of 370 Protection Dumps (above injection energy) triggered by BLMs, i.e. ~ 13% Most of dumps prior to increase of BLM thresholds on various cold/warm elements (i.e. with very conservative thresholds) UFOs predominant, remaining triggers mostly during MPS tests /setup such as loss maps, wire scanner / quench tests, etc… at moderate intensities All failures (including few ‘real’ equipment failures) nicely captured by BLMs before quenching any magnet (QPS providing ‘ultimate’ redundancy)

CERN LHC beam commissioning Workshop - Evian Dependability of MPS during 2010 run 6 Dependability / Availability of the machine protection systems has been a major design criteria and subject to extensive studies and Failure mode, effects and criticality analysis (FMECA) After ~ 10 months of operation Dependability studies for MPS systems seems to be confirmed (or be better) Nota bene: Only counting fills > injection

CERN LHC beam commissioning Workshop - Evian ● Dumps above 450 GeV are systematically analyzed by MPS experts ● At injection however little rigor is currently applied to fully understand the cause of event Losing beam during/just after injection because of beam instabilities or fast kicks Main causes are often wrong chromaticity, tune trims, quads at wrong current, low intensity on BPMs in IR6, injection losses, wrong timing tables,..…) Are there any ‘suspicious events’, where are potential holes ? 12mm 2mm 5mm

CERN LHC beam commissioning Workshop - Evian Are there any ‘suspicious events’, where are potential holes ? ● While all dumps were correctly captured by the MPS, few occasions highlighted protection layers being bypassed (redundancy being lost), especially early on, during MDs… Masking (forgetting to unmask) SIS channels Software and human errors (not correctly controlling equipment, settings generations, thresholds,..) -> See talk of Alick Controlling equipment from outside the CCC (RBAC not yet fully enforced) Acknowledging of automatic checks vs procedures (IQC,XPOC, PM,…) ….many more… ● For analysis of events the available tools (IQC, XPOC and Post Mortem) are generally well suited to analyze performance of the Machine Protection Systems Work reliably for identifying potential problems, long term degradation, etc… More rigor in acknowledging/following-up failures is needed in all systems, especially in PM more automated checks should be done (partially still relying on procedures /experts to assure offline follow-up) Similar rigor for re-commissioning of MPS changes after Technical Stops

CERN LHC beam commissioning Workshop - Evian Envisaged improvements for 2011 ● Post Mortem System evolving towards an expert system, further enhancing automatic checks rather than relying on procedures Split SIS input into maskable + a new unmaskable channel (vital machine protection features such as redundancy of user inputs, etc.. needing expert acknowledge) Possibility for analysis modules to propose “Advised Action” (to avoid e.g. repetitive trials to inject beam) Systematic check of TCDQ/TCT, TCP/Beam Dump Losses Automatic identification of beam loss shapes (UFO, dump losses, collimation, wire scanner, quench,…) Insufficient granularity in check-List / categories in PM: useful but needs to be more dynamic ● Additional changes of related HW, diagnostics and procedures Direct use of telegrams from Timing Card rather than Network by SIS Enforcing intermediate injection: If less than particles in LHC the SPS intensity will be verified by SIS to inhibit too big injections Verification of injection oscillations: SIS will block high intensity injection in case large oscillations observed during previous injection SMP Version 3 will be installed, providing full redundancy, energy read-back + new Beam Presence Flag No disabling of PM if above injection energy (enforced in sequencer + timing)

CERN LHC beam commissioning Workshop - Evian Envisaged improvements for 2011 – ctd.. ● Extend possibilities to view and correlate data for more efficient analysis PM data will be sent from interlocked BPMs in IR6 New analysis modules for Tune, BLM and Collimators If possible adding vacuum info in PM to correlate with e.g. BLM data (e-cloud) BLM data has vital importance for understanding of events, not only around dump but over whole fills (UFO search, etc…) Play-back of BLM signals as a function of time (new application by Fabio) (Very) time-consuming data extraction from Logging DB -> Alternative data structures / extraction possibilities to be studied? Introduce ‘alternative’ x-scales for PM data, i.e. translate e.g. turn by turn data into time series data to correlate beam data against power converters, etc... Ultimate goal to correlate PM data with Logging Data (needs common data formats,…)

CERN LHC beam commissioning Workshop - Evian Summary 11 LHC Machine Protection Systems have been working extremely well during 2010 run thanks to a lot of commitment and rigor of operation crews and MPS experts Most failures are captured before effects on beam are seen, still no quenches with circulating beam (with ~ 30MJ per beam and 10mJ for quenching a magnet) Beam dumps above injection are rigorously analyzed, we can do better at injection (avoiding repetitive tries without identifying the cause) Still a lot of room for improving tools for more efficient and automated analysis No evidence of major loopholes or uncovered risks, but bypassing of protection layers was/is still possible -> Follow-up of MPS Review recommendations Still we have to remain vigilant to maintain current level of dependability of MPS systems, especially when entering longer periods of ‘stable running’

CERN LHC beam commissioning Workshop - Evian 12 Thanks a lot for your attention