Dec. 2004JM Chaize TANGO ELETTRA 20041 ESRF Personal changes Recent key projects Modernization of VMEs.

Slides:



Advertisements
Similar presentations
22-23/06/20093 rd Libera Users Meeting, ESRF1 3 years of experience of Libera BPMs at SOLEIL Nicolas HUBERT Synchrotron SOLEIL On behalf of Diagnostics.
Advertisements

24th October 2006 JM Chaize, ESRF PCAPAC Jefferson Lab TANGO Control System Status Status: A mature system Collaboration issues Next phase of development.
March 2005JM Chaize PCaPac20051 TANGO A control system framework for accelerator and beamlines Design principles Basic concepts Status and projects Jean-Michel.
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
SPEAR Upgrade – EPICS Status
FAST ORBIT CORRECTION AT THE ESRF Eric Plouviez on behalf of: J. Chavanne, J.M. Koch, J.L. Pons, F. Uberto, L. Zhang.
Mar. 12, 2008 Li, Chuan: NSRL Control System NSRL 1 NSRL Control System Presented by Li, Chuan National Synchrotron Radiation Laboratory.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
June 2010 JM Chaize, ESRF/CERN control workshop 1 Overview of TANGO Control system E UROPEAN S YNCHROTRON R ADIATION F ACILITY
RAID Acquisition Computer Forensics COEN 152/252.
Single Board Computers and Industrial PC Hardware at the CLS
Marco Lonza, “The Control System of the ELETTRA Booster Injector” ICALEPCS2005, Geneva October 2005 The Control System of the ELETTRA Booster Injector.
The Future of TANGO or Quo Vadis TANGO ?. TANGO Future The future can be divided into 2 parts : The Realworld The Dreamworld.
3 rd Libera Users Meeting – June 2009 Preparation work for ALBA’s Closed-Orbit BPMs 1/33 Preparation work for ALBA’s Closed-Orbit BPMs 3rd Libera Users.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Control System and Software Engineering Process Elder Matias
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
First birds’ flyInstituteCity, Country Namedistance [Km]Accelerator Yingbing9329SSRFShanghai, China Om6227 Igor6227NSLS-2Brookhaven, USA Yuke6227 Frank.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Find the software in the PC  C:/PTmonitor/monitoring.
Status of the control system of Alba Introduction The construction of ALBA, the 3 GeV Synchrotron Light Source near Barcelona (Spain) is proceeding according.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Control Group April 26, 2006 Progress of Control System Presented by C.H. Wang Control Group Accelerator Center of IHEP IMAC, April
Instrumentation at CLS (Presentation to Saskatchewan Instrumentation Society Executive) Elder Matias Canadian Light Source University of Saskatchewan
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
"Witness of a new dancer". 14 October TANGO at ALBA Alba team: Presented by DFC. Witness of a new dancer.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
5-Oct-051 Tango collaboration status ICALEPCS 2005 Geneva (October 2005)
IDE DCS development overview Ewa Stanecka, ID Week, CERN
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Control System Pravin Fatnani Accelerator Control Section IIFC Meeting RRCAT Presentation Feb 2015.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Tango Meeting Grenoble September 5/ Claudio Scafuri, Elettra ELETTRA Status Claudio Scafuri
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
LCLS MD Downtime William Colocho June 2014 to June 2016.
Report Technical Director Storage-Ring-Installation Completed
MicroTCA Development and Status
2nd Libera Users’ Meeting 3rd and 4th of April 2008 ALBA
ESRF Status Report – part 1
Overview of TANGO Control system
SESAME Control System Status
Libera and ELETTRA Marco Lonza, Giulio Gaio, Vincenzo Forchi’
Status report SOLEIL May 2009
ATF/ATF2 Control System
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Tango status at Elettra
Diagnostics for ThomX Nicolas HUBERT, Marie LABAT, Moussa EL-AJJOURI, D. PEDEAU, Synchrotron SOLEIL Iryna CHAIKOVSKA, N. DELERUE, LAL.
Control and Data Acquisition System for ESRF Beamlines
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
JINR NICA beam transfer channels CS
High Level applications development status
High Level Physics Applications for LCLS Commissioning
(Beam) Commissioning Plan
Control System Overview Hamid Shoaee LCLS Control System Manager
Commissioning the European XFEL cryogenic system and best practice
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Dec. 2004JM Chaize TANGO ELETTRA ESRF Personal changes Recent key projects Modernization of VMEs

Dec. 2004JM Chaize TANGO ELETTRA Personal changes A. Goetz back from Australia –D. Kimdon CDD 12 months until august 2004 R. Bourtembourg CDD 18 Months for modernization B. Vedder CDD until september 2004 M. Peru 60% for Machine development and 40% SC.

Dec. 2004JM Chaize TANGO ELETTRA ESRF PSS project Global fast orbit Feedback Tune Monitor IR Beamline Screen Monitors + Emittance Measurment Other projects Tango on Beamlines

Dec. 2004JM Chaize TANGO ELETTRA Personal Safety System F.Poncet JL Pons M.Peru

Dec. 2004JM Chaize TANGO ELETTRA Personal Safety System Control of Interlock racks Interlock editor Interlock Animator

Dec. 2004JM Chaize TANGO ELETTRA Global feedback (Hardware Overview) VDSP71 Concentrate Data VME031 (OS9) W-C32-1 (Win32 CPCI) C67 DSP (PID) GlobalFeedback DS 3L/Diamond SMT327 6U Rack (Sundance) BPM (Beam position Measurement) VDSP71 Compute x and z beam positions (VMEIDXX) Steerers (Fast Dipoles) x4 x16 BPM (Beam position Measurement) VDSP71 Compute x and z beam positions (VMEIDXX) Steerers (Fast Dipoles) BPM (Beam position Measurement) VDSP71 Compute x and z beam positions (VMEIDXX) Steerers (Fast Dipoles) BPM (Beam position Measurement) VDSP71 Compute x and z beam positions (VMEIDXX) Steerers (Fast Dipoles) JL Pons F. Uberto (DSP program)

Dec. 2004JM Chaize TANGO ELETTRA Tune Monitor application Taco Server TimeServer / sr-sy Shaker Taco Server Tunemon / sr-sy sr/d-tm/new sr/d-tm/timer 1,2,3 Tango Server MachstatWrap / inst1 sys/machstat/tango Tango Server Agilent_4395a Spectrum analyzer sr/d-tm/agilent4395 Tango Server TuneServer / tunemon sr/d-tm/ntm New Tango ATK Application “ntm” Spectrum peak follow-up Configuration file management Parameters setting F. Poncet B. Vedder GPIB

Dec. 2004JM Chaize TANGO ELETTRA IR Beamline Vacuum control IR mirror control Animated Synoptic + Panels E. Taurel (mirror) J.Meyer (installation) JL Pons (JDRAW) M Peru (PLC)

Dec. 2004JM Chaize TANGO ELETTRA Image acquisition Labview Appli on Windows Calculate on line the emittance Compiled in DLL Tango server uses the DLL Tango server F. Epaud

Dec. 2004JM Chaize TANGO ELETTRA Other projects TL1 Power supply refurbishment with LabviewRT –A server above DataSocket server Tango on 8 Beamlines –Installed common TACO/TANGO db. –Few device servers for the moment Refurbishment of Linac using TANGO New GPIB devices for machine Starting the Bunch per bunch feedback –Uses the Libera acquisition system from Instrumentation technology Several other devices –(motors, Radiation mapping, scanning…)

Dec. 2004JM Chaize TANGO ELETTRA Modernize VME platform Moving out from OS9 (92 crates in 2002) –Software preparation D.Kimdon, A. Goetz –New CPU selection, hardware management: P.Pinel Migration of RF system to 7 Linux diskless VMEs – JL Pons, D.Kimdon, P.Pinel Migration of ID+Diag VMEs to Linux (29 crates) – R.Bourtembourg, P.Pinel Migration of several other functions (BPM, Linac…)

Dec. 2004JM Chaize TANGO ELETTRA