GAMP - Process Control SIG

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Software Quality Assurance Plan
Radiopharmaceutical Production
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
System Integration Verification and Validation
Software Quality Assurance Plan
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
EQUIPMENT VALIDATION.
Audit of IT Systems SARQA / DKG Scandinavian Conference, October 2002, Copenhagen Sue Gregory.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Define ● Deliver ● Sustain Sundar Chellamani Technical Director SysComm Project Management Ltd.
Illinois Institute of Technology
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
CSSE 375 Software Construction and Evolution: Configuration Management
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
EQUIPMENT QUALIFICATION/VALIDATION
MethodGXP The Solution for the Confusion.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Rocky Mountain RAPS Process Validation Presentation 6/7/06 By Clay Anselmo.
Software Engineering Term Paper
VALIDATION METHODOLOGY
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Important informations
Topics of presentation
BE-SECBS FISA 2003 November 13th 2003 page 1 DSR/SAMS/BASP IRSN BE SECBS – IRSN assessment Context application of IRSN methodology to the reference case.
Software Engineering Prof. Ing. Ivo Vondrak, CSc. Dept. of Computer Science Technical University of Ostrava
1 DISTRIBUTION A. Approved for Public Release; Distribution Unlimited. 88ABW , 23 May Integrity  Service  Excellence ADT 101: Introduction.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Over View of CENELC Standards for Signalling Applications
VALIDATIONS: TOWARDS RELAIBLE QUALITY OUTCOMES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Purpose: The purpose of CMM Integration is to provide guidance for improving your organization’s processes and your ability to manage the development,
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Testing throughout Lifecycle Ljudmilla Karu. Verification and validation (V&V) Verification is defined as the process of evaluating a system or component.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Configuration Management
World Health Organization
Software Engineering (CSI 321)
Software and Systems Integration
Configuration Management
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Software Requirements
Computer System Validation
Software Quality Assurance Plans
Lockheed Martin Canada’s SMB Mentoring Program
How to conduct Effective Stage-1 Audit
PSS verification and validation
Machine Protection PLC Based System Verification and Validation Plan
Software Reviews.
Computer System Validation
Radiopharmaceutical Production
Presentation transcript:

GAMP - Process Control SIG GAMP 4 + Beyond Tony de Claire

GAMP - Process Control SIG SIG Background Evolved from impromptu lunchtime meeting at the launch of initial GAMP (PICSVF) draft release in Westminster Two control engineering representatives given a mission at a meeting hosted by Wellcome, Dartford soon after Initial Group set up, with recruitment at a hotel bar in Basle (May’96) Group’s basic aim is to “voice” control system issues Well attended group with members of “user” background Active with / instigating a variety of contributor panels

GAMP - Process Control SIG Purpose: Address the considerations in applying GAMP Principles to Process Control System applications Work focus: Process Control Systems Section in GAMP 4 * Forthcoming GAMP “Good Practice Guide” Input to Calibration panel, Audit, GEP revisions Liaison with NAMUR and JETT ( * copies of pre-edited Draft available)

GAMP 4 - Process Control Systems Used to automate manufacturing processes Dynamic real-time I/O Collect data Control and manage the process Link to higher level data handling functionality or systems in Computer Integrated Manufacturing (CIM)

GAMP 4 - Process Control Systems Covers a wide range of systems Small control systems, e.g. in manufacturing equipment Large control systems, e.g. operating bulk product plants Two Main Categories Embedded Standalone (Integrated)

Embedded Systems Microprocessor, PLC, or PC with sole purpose of controlling / monitoring manufacturing equipment. Usually delivered ‘embedded’ in a unit or machine Multi-discipline engineering effort required to produce Much of the lifecycle documentation produced by supplier

Standalone Systems Self contained systems, usually delivered separately & connected to field devices May be linked to / provide higher level functionality Supervisory Control and Data Acquisition (SCADA) Distributed Control Systems (DCS) Controller or PLC controlling part of a process Project engineering and co-ordination required

GAMP Validation Principles Lifecycle (ref. Draft Figs 3.3, 3.4, 3.5) Planning, Supplier and Compliance Risk Assessments User and Supplier Partnership Specifications Traceability Formal Testing and Verification Documented Evidence

Lifecycle Phases Planning & Requirement Definition Design Specification, System Development, & Build Design Review and Acceptance Testing Qualification & GEP Commissioning * Operation and Maintenance Decommissioning and Retirement ( * Aligns with ISPE Baseline Guide for Commissioning & Qualification )

Planning & Definition Define Scope Software Hardware Instrumentation Electrical Mechanical

Planning (continued) Supplier Assessment Quality and Project Plan Quality System Capability Audits Quality and Project Plan Define structure of lifecycle documents GxP Criticality and Compliance Risk Assessment

Importance of Specifications Provide a structured definition of system requirements Enable requirement traceability matrix Allow complimentary lifecycle documents to be developed Support focused and auditable system development Establish test acceptance criteria Support maintenance of the system

User Requirements Specification For small embedded applications, could be part of equipment specification For large standalone applications, e.g. DCS or SCADA, a separate URS is normal

User Requirements Specification URS to clearly identify: Parameters to be controlled and monitored Data to be generated, manipulated, or stored Functions to be performed Process sequence, interlocks, alarms Quality-related critical parameters, data & functions Safety and Environmental requirements Levels of testing required

Functional Specification Embedded System – FS may be part of overall equipment specifications, including instrument, electrical, and mechanical elements Standalone System – FS typically one document, identifying the functions, features and the design intentions for the system hardware and software

Functional Specification Establishes how the requirements of the URS will be implemented Functions to be performed Facilities to be provided Detailed process sequence logic and interlocks Interfaces to instruments, equipment, and other systems Normally produced by supplier in response to the URS

Functional Specification Basis of subsequent testing and verification, e.g. System Acceptance Testing Divergence with the URS to be identified Should identify any software functions that are not being utilised Often a contractual document subject to Change Control by Supplier

Design Specifications Specifications for system design: Software Hardware Instrumentation ………… may include mechanical and electrical general arrangement drawings

Detailed Design Documentation Process and Instrument Diagrams (P&IDs) Showing process flow Identification and location of associated control and monitoring loops Plant Equipment Layout Identification and location of major items

Detailed Design Documentation Loop and Instrument Schedule Identify items in the loops Measurement ranges and tolerances Inputs and output signals Identifies Critical Parameters Alarm trip points and actions Sequence Logic & Interlock details

Detailed Design Documentation Interconnection Drawings Connections to field instrumentation Wiring termination, identification, rating, and polarity Sufficient detail to enable assembly, installation, and fault diagnosis

Hardware Design Specification Defines architecture and configuration of the hardware, including: Controllers PCs Input / Output types & allocation System Interfaces

Software Design Specification Defines how the software is to implement the Functions Specification Defines the software and data structure, architecture, the software modules, their interactions, and interfaces. Structural modular programming language / techniques

Software Design Specification Should identify programming standards where coding is involved, and naming conventions in all cases Ensure “annotated” hardcopy of software software provides clear understanding and can be used testing aid All non-standard software to be identified

System Software Development Against pre-defined design intentions In accordance with suitable structured programming standards Author fully conversant with programming language / techniques Author experienced in similar design intentions

System Build Embedded System - usually final assembly into automated equipment precedes installation at user-site Standalone System – the computer system & instrumentation are shipped to site, inspected and installed in conjunction with the manufacturing / process equipment (All system build carried out according to approved manufacturer design/assembly documentation)

Software Review Software to be reviewed (inspection, walk-through etc) by independent developer(s) Examined against formal procedures prior to testing Ensure written / configured against pre-defined intentions and in accordance with programming standards

Design (& Development) Review Formal and systematic verification that specified requirements are covered by the design and development activities Supported by a structured set of lifecycle documentation May be a series of reviews throughout system design and development To verify adherence to Requirements Traceability Matrix Can encompass elements of “acceptance testing” Requirements and Design intentions should be agreed before significant code development Findings to be documented in a Design Review Report

Acceptance Testing Proving the correct operation of software, hardware, and instrumentation, as defined by the URS and FS Based on approved Test Specifications, and formally reported Test specifications to include objectives, procedures and “acceptance criteria” To focus on GxP and other critical functions and data Determine level of testing to support Lifecycle “Qualifications”

Acceptance Testing Depending on circumstances can encompass system development / build testing: Software development tests Hardware manufacturing tests System integration tests Instrument manufacturing / calibration tests SAT (and FAT) Tests during & on completion of manufacture to be to pre-defined procedures and documented

Acceptance Testing Factory Acceptance Testing (FAT) Pre-delivery Normally a “contractual milestone” For standalone systems - without connection to field instrumentation, with an agreed level of process simulation Testing constraints to be documented Opportunity to identify problems best resolved in Supplier environment

Acceptance Testing Site Acceptance Testing To determine that the system and any associated equipment has not been damaged, and functions correctly in the operating environment Normally a repeat of the FAT plus tests possible with process, instrumentation, interfaces, and service connections in place With adequate level of test procedures may be combined with engineering commissioning to provide necessary test data for IQ and OQ

Calibration of Instrumentation Pre- and post-delivery, to defined, approved procedures Test equipment documented, and traceable back to acceptable standards Calibration test results retained Establish calibration interval depending on criticality, robustness, sensitivity, and operational experience

Qualification Installation Qualification (IQ) confirms: Hardware, electrical connections, data highways, field instrumentation, field cabling (and associated electrical & pneumatic equipment) is installed to documented design / standards Software loaded correctly Basic system functions operate satisfactorily on power-up System configuration / calibration Field instrumentation calibrated Lifecycle and associated support documentation approved and available

Qualification Operational Qualification (OQ) - confirms that operation of system hardware, software, I/O devices and field instrumentation will function satisfactorily under normal operating conditions and, where appropriate, under realistic stress conditions Performance Qualification (PQ) - normally carried out in conjunction with process qualification to confirm the correct operation of all system components, associated equipment, people and procedures that combine to run the manufacturing process

Validation Qualification / Validation Reports – on successful completion of qualification testing and approved summary reports, a Validation Report will confirm that the system is ready for use in the manufacturing process for which it was designed

Operation & Maintenance To ensure validation status is maintained: Quality, Maintenance and Calibration regime Configuration Management Change Control Reference to critical process parameters / data and Requirements Traceability Matrix Periodic Reviews and Internal Audits System reliability, repeatability, performance & diagnostic data Approved Lifecycle document status and accuracy SOP status and use

System Retirement Decommissioning to include archiving data and software Archive Report to describe approach, list documents, raw data, and electronic records Verification of critical instrument calibration Special care with preservation and availability of GxP records throughout their retention period, as required by of 21 CFR Part 11, and associated predicate rules

Conclusions GAMP Principles - can be applied effectively to process control systems, both embedded and standalone Good Engineering Practice - normal engineering commissioning activities can support the requirements of Qualification testing

GAMP – Process Control SIG Q. What’s next? A. Produce a Good Practice Guide Work underway to expand on the work done for the new GAMP 4 publication and produce a supplementary Good Practice Guide for “Validation of Process Control Systems”

Validation of Process Control Systems Guide Proposed Contents Introduction, Background, Definitions Regulatory Considerations Supplier Assessments Standalone and Embedded Systems Importance of Good Specifications Manufacturing Parameters & Quality Data Lifecycle of Process Control Systems Criticality Assessment Systems Specification, Design, Development and Review

Validation of Process Control Systems Guide Proposed Contents (continued) Factory Acceptance Tests Installation Qualification Operational Qualification Maintenance Calibration Change Management Review of Existing Systems Retirement / De-commissioning New Technologies

Validation of Process Control Systems Guide Proposed Contents (continued) Appendices Critical Parameters & Data Software Categories for Control Systems Postal Audit of Suppliers NAMUR guidance documents

GAMP Liaison Thanks to Sion Wyn & John Andrews

Any Questions? Tony de Claire Process Control SIG