Britannia Mine Remediation Project Britannia Shoreline Public Meeting June 25, 2008 Britannia Shoreline Public Meeting June 25, 2008 www.britanniamine.ca.

Slides:



Advertisements
Similar presentations
By Chris Ford and James Hughes ( ) ( )
Advertisements

Britannia Mine: Environmental Impact Study of Treated Effluent Discharge Lee Nikl.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
BoRit Superfund Site Timeline
Greater Vancouver Regional District’s Liquid Waste Management Plan.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Kabwe is the second largest city in Zambia. 150 kilometres north of the nation’s capital, Lusaka. ≈ of population 58% of the population are living.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
MINING. Overview StepsDescriptionEnvironmental Effects MiningRemoving mineral resources from the ground Mine wastes – acids and toxins Displacement of.
Summitville Gold Mine Disaster
PROTECTFP Work Package 1:- results from questionnaire and overview of tools for chemical assessment.
Iron Mountain Mine California Acid Mine Drainage Discharge Stuart Gaunt Guy Laurie.
The EU Water Framework Directive and Sediments The Water Framework Directive was transposed into law in EU Member States at the end of Nearly two.
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Groundwater Topic 1053 Uses, System Components And Contamination Mr.Christensen.
ENVE 4505 Surface Water Quality Engineering Dr. Martin T. Auer.
WATER POLLUTION.
WATER POLLUTION.  Water covers more than 70 percent of the Earth’s surface. While less than 3 percent of this water is drinkable, all of it is necessary.
Point Source POLLUTION: CAUSES AND CONSEQUENCES
Open-pit Mining By Jessica Paddy. What Is open-pit mining? The process of extracting rocks and minerals through an open pit or hole in surface of the.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
LAKE OHRID MACEDONIA AND ALBANIA Experiences with Nutrient Management and Agricultural Non-point Source Pollution Control.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Tailings and Waste Rock Management Alternatives Study
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
“MAINTAINING ENVIRONMENTAL INTEGRITY IN MINING ” Tashana Redmond Senior Environmental Officer.
Canada’s Ocean Strategy. The Oceans Act In 1997, Canada entrenched its commitment to our oceans by adopting the Oceans Act. In 1997, Canada entrenched.
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
What are some ways to reduce the risks to public health in drinking water from Salinas Valley? Andrew Mims Nitrates In Groundwater Presentation ENSTU 300.
Critical Loads and Target Loads: Tools for Assessing, Evaluating and Protecting Natural Resources Ellen Porter Deborah Potter, Ph.D. National Park Service.
Hydrology Unit Review. The continuous movement of water from the ocean to the atmosphere to the land and back to the ocean is called what? The Water Cycle.
Aquatic Biodiversity. Chapter Overview Questions What are the basic types of aquatic life zones and what factors influence the kinds of life they contain?
MINING Review notes from fossil fuels - coal. MINING Diamond mine, Siberia Largest hole Diamond mine, South Africa Largest hand-dug hole.
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
Regulatory Framework for Uranium Production Facilities in the U.S.
Tracking Groundwater Contamination
Lesson 1.5 Pg
WATERHOLIC - a drop of water, a drop of hope COLEGIUL TEHNIC „MIRON COSTIN” ROMAN, ROMÂNIA 23 – Palermo, ITALIA.
Margaret Byrne, U.S. Fish and Wildlife Service
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
Soil contamination Proposed EEA/ETC contribution to the working group on Soil Contamination European Topic Centre on Terrestrial Environment SESSION 2.
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
Chapter 20 Environmental Protection
Watersheds and Wetlands CHAPTER 1. Lesson 1.5 Factors That Affect Wetlands and Watersheds Human Activities Watershed Quality Health of U.S. Watersheds.
Bellringer. Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. – They include: solids,
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
Westbrook Contractor Safety Training (March 31, 2016) Dana Beaulieu Sappi Westbrook Operations Environmental, Health, Safety and Security Manager Environmental.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Stormwater Management
Identification on Significant Pressures - Surface Water Bodies
Phase 2 Hope Bay Belt Project
Classroom Catalyst.
Water & Human Impact: Unit 4
Warmup 10/22/12 As the population of Durham increases…
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Mining and quarrying activities and waste generation
DG Environment, Unit D.2 Marine Environment and Water Industry
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Britannia Mine Remediation Project Britannia Shoreline Public Meeting June 25, 2008 Britannia Shoreline Public Meeting June 25,

Why are we here? Provide a brief overview of where we are at Engage members of the community about where we are going. –Build on significant stakeholder consultation which contributed to the Overall Remediation Plan

Why are we here? Focus is on the Britannia shoreline and eventually setting resource conservation objectives (RCO).

Agenda Welcome and Introductions Overview of the Britannia Remediation Project Summary of Environmental Monitoring Resource Conservation Objectives Participation and Feedback Closing: Questions and Answers

What’s the Problem?  Britannia Mine - “the largest point source of metal pollution in North America discharging to a marine environment” until October 2005  Naturally occurring metal sulphide orebody

Environmental Issues  Acid Rock Drainage (ARD) was discharging from the mine (~5million m 3 /year) - copper, zinc, cadmium, pH~3.5  Metal-contaminated groundwater: –Alluvial Fan of Britannia Creek –Waste dump leaching  Metal-contaminated surface water (run-off)  All the above impact aquatic life in Howe Sound and local waterways: –Squamish River salmon run

Britannia Creek Alluvial Fan (‘Fan Area’) Britannia Creek Mill Building 4100 Level Mine Entrance ‘Concentrate Wharf’ BC Museum of Mining Highway 99

4100 L 2700L 4100 Portal 4100 Plug Mineral Creek Britannia Creek Howe Sound Britannia Beach #10 Shaft Victoria Shaft 3D Cutaway of Britannia Mine 2200 Portal 2700 Portal Jane Basin Mine Levels defined in feet measured downwards from highest elevation in mine

Howe Sound Assessment of contaminated sediments (Environment Canada) Treatment: of mine drainage Management of contaminated groundwater Collection: (Plug installed in 2200 level In 2001 by UBC/CERM3) Mill Management of contaminated waste rock and groundwater Province’s Remedial Concept Prevention: Inflow diversion Use of mine void as storage/ balancing reservoir New Deep Outfall Plug with control valve Inflow Diversions Collection/storage of ARD Treatment of ARD Deep outfall Groundwater capture/treatment Surface water management Contaminated soil management Monitoring & Risk Assessment

Overall Remediation Plan (ORP) Prepared by Golder on behalf of Ministry of Agriculture and Land (MAL) in 2003; Input from Crown Land Restoration Branch, technical consultants, BC and Federal regulators and project stakeholders; Strategy evolved from years of study and assessment since mine closure in 1974

ORP Objectives 1.Reduce discharge of harmful substances (metals) to habitable areas and aquatic communities; 2.Protect, sustain and promote recovery; 3.Achieve and maintain acceptable levels of risk to health and safety for humans and other terrestrial organisms; 4.Implement in a timely and cost effective manner

Review of Progress 1.Immediate Actions 2200 Plug Removal of Mill Building Concentrate Pile Removal of lower settling pond sediment Removal and stabilisation of sedimentation pond Removal of mill slope soils* Ground and storm water interception in Fan Area Surface water diversions in Jane Basin First stage of monitoring and assessment *Now a potential action: surface & groundwater control in lieu

Review of Progress 2.Committed Actions Mine water collection and storage Mine water treatment plant New deep water outfall WTP sludge disposal Stage 2 of monitoring and assessment

Review of Progress 3.Potential Actions Additional Fan Area groundwater interception Additional surface water diversions Remediate additional mine wastes and portals* Additional Fan Area surface and storm water management, collection and treatment** ? Remediate Fan Area soils*** ? Remediate Fan Area inter-tidal zone*** *Some completed/in progress. Review ongoing ** Underway *** Contingent on risk assessment findings

Additional ORP Requirements Environmental remediation is primary focus of the ORP, however additional objectives include: –Mitigation of public health and safety risks –Compliance with Section 10.6 and 10.7 of the BC mine Code

ORP Status Summary Immediate remedial actions have all been implemented (excl. Mill Slopes) Committed remedial actions have all been implemented Potential remedial actions –Most implemented –Remainder under review

ORP Status Summary ‘Potential’ remedial actions ongoing/under consideration –2200 Level Waste Dump Hazardous Waste identified and remedial plan in progress to be implemented this year –2200 Level Waste Dump drainage improvements – to be implemented this year –Beta Portal discharge diversion (potential diversion back into the mine)

Risk Assessment Screening-level risk assessment was used to identify environmental risk and prepare ORP A more detailed aquatic and terrestrial monitoring programme and risk assessment was proposed (Tier 2 Assessment)* The detailed assessment would be used to refine potential risks and select any appropriate additional remedial actions Current status: defining Resource Conservation Objectives

Planning out risk assessment?Planning out risk assessment? –Large site –Mine workings that exist across 2 watersheds Planning out risk assessment?Planning out risk assessment? –Large site –Mine workings that exist across 2 watersheds

Why a Risk Assessment Plan?Why a Risk Assessment Plan? –Large site –Mine workings that exist across 2 watersheds –Ore processing area located along Howe Sound

Furry Creek Watershed Limited surface water sampling Water chemistry generally good. Limited remedial work Recommended that a Problem Formulation/Sampling & Analysis Plan be prepared (first part of a risk assessment)

Britannia Creek Watershed Dominant influence on Britannia Cr water quality is from Jane Creek Some waste materials removed; planning underway to remove Haz Waste at 2200 level. Jane Creek drains a naturally mineralized area.

Britannia Creek Watershed

RA not likely to contribute to near-term remedial actions Natural mineralization of the area may constrain practicability of remediation to plausible RA endpoints Near-term: –Investigate sources –Remediation of selected potential sources

Fan Area Monitoring indicates: –Contaminant concentrations in nearshore groundwater are high –Biological assessment and testing – significant adverse localized effects Risk assessment at present is not seen to play a major role until sources are controlled Development of Resource Conservation Objectives will aid in defining remedial endpoints at this time and will form a basis for future RA. –How clean is clean enough?

Environmental Monitoring Findings Britannia Shoreline 3 main program components: –Marine water quality –Nearshore groundwater quality (porewater) –Shoreline ecology

Station Locations

Marine Surface Water Chemistry - Intertidal

Marine Surface Water - Subtidal Total copper Dissolved copper mg/L = chronic WQG mg/L = maximum WQG

Pore Water Chemistry mg/L = chronic WQG mg/L = maximum WQG

Pore Water Toxicity- Mytilus galloprovincialis (ns)

Intertidal Community Structure

Reach BB-6 Reach BB-3 % Coverage (Mean  SD) HighMidLow Intertidal Zone Spring Summer Fall Spring Summer Fall Clado- phora sp. Entero- morpha sp. Fucus gardneri Mytilus edulis Balanus glandula Clado- phora sp. Entero- morpha sp. Fucus gardneri Mytilus edulis Balanus glandula 2006

Intertidal Community Structure Reach BB-6 (Spring 2006) Reach BB-3 (Spring 2006)

Caged Bivalve Study

Caged Bivalve Study Change in Weight (g; mean  SD) Tissue Copper (mg/kg ww)

Resource Conservation Objectives How good is good enough? –More often thought of in terms of chemical concentrations –Can also be expressed in ecological terms as a shoreline community condition and/or function

Resource Conservation Objectives How good is good enough? –Example: percent cover by mussels and barnacles Community interests and values assist scientists in defining what is “good enough”

Resource Conservation Objectives Shoreline Use: –Human use of the shoreline –Ecological use of the shoreline –What is important to you? Community aspirations should influence resource conservation objectives and remedial measures to attain those

Resource Conservation Objectives In addition to community values, there are regulatory requirements. –Ministry of Environment, Environment Canada, Fisheries and Oceans Canada Agency consultation will take place, following community consultation (projected for Fall 2008) Agency input to the project has been ongoing through the TAC –Agency representatives in attendance tonight.

Now its your turn… Questionnaire available here and online: – Scientists and engineers working on the project are present this evening to help you Please review the posters and other materials, ask them questions, formulate your thoughts and tell us what you think!