For Discussion Purposes Only Digital 395 SE C RBC– Board Presentation Discussion Guide February 28, 2013.

Slides:



Advertisements
Similar presentations
Project Management An Electric Utility Perspective Michael Jackovich President and Owner Project Management Plus, Inc. May 18, 2009 Copyright 2009 Project.
Advertisements

Effective Contract Management Planning
Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
EPSCoR/NSHE C2 Grant Wrap UP Las Vegas Metro Fiber Ring Upgrade Project Presented By: Ed Anderson and Stanton Gurr 1.
Merit Network BTOP Status Robert Duncan & Pete Miller Director of Network Operations.
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
Puyallup IT & Communications Puyallup Services and South Sound 911 TOPICS Summary – Current Direction of IT & Communications South Sound Updates Puyallup.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Metropolitan Unified Fiber Network (MUFN) Silly name – SERIOUS fiber.
Planning and Community Development General Plan EIR: Traffic Thresholds & The Pipeline City Council February 10, 2014.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Board of Standards and Appeals Community Board 3 / Manhattan June 13, 2011 Introduction Introduction Applications: Applications: –Variances –Special Permits.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
December 22, :30 to 2:30 PM Transportation Laboratory Auditorium 5900 Folsom Boulevard Sacramento, CA Hector Romero, P.E. Senior Transportation.
Increased Pipeline Safety Through Shared Planning Pipeline Safety Trust Conference New Orleans, LA November 15, 2007.
Following the BTOP Money What to do after the grant arrives Merit’s REACH-3MC Project Educause August 4, 2010.
Los Angeles Interoperable Regional Communications System © Copyright 2015, LA-RICS Authority. All Rights Reserved. CPRA Update January 15, 2015.
Kjell Nelin OVSA Site Manager, Center for Solar-Terrestrial Research New Jersey Institute of Technology.
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
Carbon Management Steering Board 7 th October 2011 ETHOS (waste to heat) & ComPod – Update CARBON MANAGEMENT BOARD – October 2011.
“Community Benefits of Earth Science” SPECIAL WASTE COMMITTEE MEETING of the California Integrated Waste Management Board FEBRUARY 9, 2005 Presented by.
MURRIETA FIRE DEPARTMENT Fire Station 5 January 2010.
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
Palm Coast’s Municipal Fiber-Optic Network: Project Update
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Wausau CAN: Marathon County, Wisconsin 18: Community Anchor Institutions to be connected 0: Community Anchor Institutions currently connected 0: Total.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
1 Three Rivers Levee Improvement Authority Follow-up on Twelve Compliance Issues Raised on February 26, 2007 March 22, 2007.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Alameda Power & Telecom An Enterprise of the City of Alameda LAST-MILE TECHNOLOGY AND RFP DEVELOPMENT.
Napa Salt Marsh Restoration Project 2010 Status Update.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update January 14, 2008.
Bishop Lee Vining June Lake Mammoth Lakes Crowley Benton Big Pine Independence Lone Pine Olancha / Coso Ridgecrest Boron Kramer Junction Barstow Antelope.
For Discussion Purposes Only Digital 395 August 2-5, 2011 Vendor Overview for Electronics Requirements.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Center for Water Resource Studies - WKU Field Operations Unit Alanna Storey.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
USA Parkway Project Welcome Public Information Meeting to the
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
1 UPDATE ON SHELLEY’S SERVICE CONTRACT Y PD Utilities Department Orange County Board of County Commissioners November 15, 2011.
Kern Council of Governments KERN REGIONAL BLUEPRINT PROJECT March 16, 2006.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
Green College Initiative Jem Morris. Green College Initiative The College has created a ‘Green College’ group that meets at least every 8 weeks The group.
1 Wide Area Network Project Information Technology Advisory Committee March 21, 2007.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
AES HUNTINGTON BEACH ENERGY PROJECT
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
RHP 12 Regional Update Jeff Dane Executive Vice President & Chief Financial Officer.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
June 5, 2017.
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Eligible Services and Fiber Options for Service Providers
June 26, 2017.
Gunnerson Street Safety Project
Presentation transcript:

For Discussion Purposes Only Digital 395 SE C RBC– Board Presentation Discussion Guide February 28, 2013

Project Status

For Discussion Purposes Only 3 Rights-of-Way & Permits  ROW Remaining  All in place (Recent Washoe BIA Approval this week)  NTIA Route Changes for 5 Route Changes (2 NV, 3 CA)  Encroachment Permits  City of Reno Permits for M101( Approval 3/4/13)  Caltrans (Big Pine to China Lake)  Distribution  County Licenses for Kern County approval 3/3/13  County and City licenses include Anchor Access Agreements  NTIA Route Changes for 25 anchors and POIs

Construction Status - Nevada  Installed Plant  Reno / Carson Nodes  28 miles fiber (Reno- Carson)  Conduit: 2 Segments  Present Operations  Curtis & Sons, Apex  Focused on 395 thru Carson  Issues  BIA Approval to Proceed in N111-N113  2 Route Changes (2,000 ft)

Construction Status – Mono County  Installed Plant  Antelope, Bridgeport, Lee Vining, Mammoth Nodes  39 miles fiber (Coleville-VL)  Conduit: 8 Segments  Present Operations  Kleven, Westech, Apex, ASI  Focused State Line to June, and South of Mammoth to Crowley  Issues  Inyo National Forest  1 Route Changes (Mammoth)

Construction Status – Inyo County  Installed Plant  Bishop, Independence, and Nodes (Olancha is in GS10)  2 miles fiber (Reno-Carson)  Conduit: 3 Segments  Present Operations  Westech – Heavily Plowing  Focused on southward from Bishop  Issues  BLM Trespass (Resolved)  Caltrans Permits  1 Route Change (Round Valley)

Caltrans Permit Progress

Construction Status – Kern & South End  Installed Plant  Reno / Carson Nodes  104 miles fiber (Barstow- Pearsonville)  Conduit: 15 Segments  Cable: 14 Segments  Present Operations  Westech, McCullin Pipeline  Ridgecrest Distribution  Focus  K121 (Inyokern Lateral)  County of Kern Distribution

Environmental Issues / Responses For Discussion Purposes Only 9  BLM  Claim: Trespassing into WSA: Outcome 200’ conduit re-installationt  $15K Study Cost; $20K for project monitoring  Section 106 Violations  N103 alleged disturbing of sacred artifacts - NTIA validated our practices  ESA Breach: Contractor drove over ESA; Invalidated by NTIA Study  INF archeological concerns: NTIA working with USFS  Long Bores (over 2,000 ft): negotiating for pit excavations, break up  Biological  Construction crews would be locked out of bird nesting areas: accelerated work in sensitive areas and obtained relief on timeframes  DFG 1602 Violations: Audit found unsatisfactory training with Sub- Contractors. Proactive Ride-Alongs, Training Sessions

Node Construction

For Discussion Purposes Only 11 NodeLandPermitSiteBldgPowered RenoOwnedYesCompletedPlacedYes CarsonOwnedYesCompletedPlacedYes AntelopeFire DistYesCompletedPlacedYes BridgeportCountyYesCompletedPlacedNo Lee ViningSchoolYesCompletedPlacedNo MammothSchoolYesCompletedPlacedNo BishopLADWPYes2/26/13ReadyN/A IndependenceCountyYes3/1/13ReadyN/A OlanchaCountyYes/PA3/15/13ReadyN/A RidgecrestOwnedYesIn ConstPlacedN/A BarstowOwnedYes3/7/13ReadyN/A

Distribution Construction For Discussion Purposes Only 12  Key Service Areas (Ridgecrest, Mammoth, Bishop)  Contract Awarded to Kleven  Construction underway in Ridgecrest  Mammoth construction starts post April. To be challenged in March  Other Areas: Benton, Walker, Coleville, Bridgeport, Lee Vining, Big Pine, Independence, and Lone Pine  Praxis Focus (Aerial and Smaller Areas)  Boron  InyoKern  Round Valley (Aerial)  Benton Tribe(Aerial)  Bridgeport Indian Colony  China Lake Distribution (Aerial)  June Lake (Aerial)  Randsburg / Johannesberg (Aerial)  Cerro Community College (Aerial)

Inyokern Distribution and Anchors

Ridgecrest Distribution and Anchors For Discussion Purposes Only 14

Ridgecrest – China Lake Blvd.

Bishop Distribution and Anchors

Independence Distribution & Anchors For Discussion Purposes Only 17

Anchor Status For Discussion Purposes Only 18 AttributeNumberComment Anchors Visited328 Completed Engineering Surveys322 Access Agreements Signed228 Access Agreements Pending14 Kern Co Agreement Access Agreements Rejected0 Not Access Agreements in Place37 Anchors Cancelled39 By Choice of Customer / Site Moved TOTAL ANCHORS328

Anchor Service Trench For Discussion Purposes Only 19 Anchor Service Trench Integration With Backbone Conduit Placement. When the backbone work is being done in the street the backbone contractor will place the service trench and conduit to the customer location.  Cost savings over separate service trench. Using the same equipment and work setup as the backbone  Time savings. One crew completes backbone and service trench/conduit placement  Less disruption to anchor locations  Praxis fiber and NID installation follows

Anchor Service Trench Ridgecrest Regional Hospital For Discussion Purposes Only 20 This service trench will be completed by boring onto Hospital property using the same work setup and equipment as the backbone work on K104 that places conduit on N China Lake Blvd

For Discussion Purposes Only 21 Thank You