RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen250.000 CHF 2010 Expenditures (2009 carry over)110.000 CHF Present Income Balance.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
NY/CRE Actual Outstandings to Budget End of Month Balances January 2006.
NY/CRE Actual Outstandings to Budget End of Month Balances.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
CLOUD Financial Review Committee meeting #3 1 October 2014 Financial plan for 2014 and beyond 1 Oct 2014, indico: rd FRC meeting, Antti Onnela,
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
Results of 2012 Financial Operations. AGENDA Introduction Cash, Receivables, Equity Capital Assets/Reserve Accounts Income & Expenditures Budget Performance.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Results of 2012 Financial Operations. AGENDA Introduction Cash, Receivables, Equity Capital Assets/Reserve Accounts Income & Expenditures Budget Performance.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
RRB Scrutiny Group Meeting A. Charkiewicz, 16 July 2013 M&O Budget Issues.
Roberto Tenchini CMS FB December 2004 CMS Tracker The Tracker Cost Review - November 2004.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
SG 27/1/2014. Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
2009 RPC CAF experience We did a very good exercise at the end of 2009 – 2 shifters + 1 shift leader + Experts: Costantini/Ocampo/Carillo/Cimmino/Lomidze/Tupputi/Trentadue.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
Wesley SmithMay 12, 2008 Trigger Budget Review - 1 US CMS Mid-Year Budget Review Trigger Wesley Smith May 12, 2008 Outline Overview of Activities FY 08.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
RPC DSS & DCS Action Matrices Review Anton Dimitrov CMS Action Matrix Review 2015, 06.Mar.2015, CERN, Geneva.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ATLAS M&O General Comments
NA62 Finance Review Committee CERN-FRC November 2016
RPC Barrel HV & LV system Lappeenranta University
30th meeting of the ALICE RRB C. Decosse
4th FRC meeting, Antti Onnela, CERN-PH-DT
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
Workstream 5: Governance Financial overview for Year 5
PH Dept (and other) news
RPC Detector Control System: towards the final system
HV & LV status LV system in W+1 and W+2 is OK
LCC Common Fund 2016 February 24, 2016 KEK, JAPAN - FALC.
Pierluigi Paolucci & Giovanni Polese
23 Barrel chambers and 12 Endcap chambers
Presentation transcript:

RPC M&OB status Pigi Paolucci

Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance (including outstanding commitments): CHF Remaining contributions: CHF 2010 Total: CHF 2010 M&OB was a great success for the RPC community. We are using the budget in the proper way. We have to define the list of people to be supported in the 2011 by the project payments invoice will be send from March (after the CMS FB) 7/12/102RPC IB - Pigi Paolucci

Manpower 2010 G. Polese – 3 months - DCS M. Rozonov –3 months - Noise S. Tupputi – 3 months - Skim and DB U. Berzano – 3 months - WBM A. Dimitrov – 4 months - TC/RC H. Shahzad -2 months – TC/RC (2009) C. Pinto – 4 months – Endcap (2009) Technicians-4 weeks – Upgrade TOTAL:63.6 KCHF 7/12/103RPC IB - Pigi Paolucci

Maintenance & Material 2010 CAEN board reparations:10 KCHF CAEN SY1527 upgrade:7 KCHF CAEN contract:10 KCHF Pool Rental: 700 x 128 KCHF Magazine:5 KCHF Varie (Trigger….)3 KCHF TOTAL:43 KCHF 7/12/104RPC IB - Pigi Paolucci

Varie Manpower A. Dimitrov (sofia): 3 months (RPC) + 3 months (CMS) Database/Noise: Rodozov ? WBM: Berzano ? Request from Pakistan Request from Uniandes What else ? Materials Replace all the HV fan boxes Replace DCS computer Reparation during the shut-down 7/12/10RPC IB - Pigi Paolucci5