1 Key Principles and Practical Considerations for NRS 048-6 A Distributor Licensee Perspective AMEU Technical Convention 16-18 October 2006 Gallagher Estate,

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
22 August 2012 Regulating for productive efficiency – an assessment of the regulatory framework faced by Eskom Presented at the South African Economic.
RURAL ELECTRIFICATION Standardisation and Quality of Supply Presentation to UPDEA February 2009 By Rob Stephen.
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
Assessing the Potential of Energy Efficiency Programmes in South Africa by Modelling Selected Policy Interventions Alison Hughes Energy Research Centre,
Definition Reliability is a general quality of an object – an ability to perform a desired function, sustaining the values of rated operational indicators.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
The Centre For S USTAINABLE E LECTRICITY & D ISTRIBUTED G ENERATION Creation of SEDG The Centre for Sustainable Electricity and Distributed Generation,
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
APPA 2005 E&O Technical Conference Memphis, TN April 19, 2005
Autorità per l’energia elettrica e il gas FAULT STATISTICS IN DISTRIBUTION NETWORK: WHAT REGULATORS NEED? Roberto Malaman Autorità per l’energia elettrica.
60 th AMEU CONVENTION TOWARDS SUSTAINABLE REDs PRESENTED BY DR WILLIE DE BEER, COO: EDI HOLDINGS 17 OCTOBER 2007.
Date 08 October 2013 SC Economic Development: Electrification Programme Ms Ayanda Noah Group Executive Distribution.
1 Enhancing Eskom Distribution Network Planning 15 October 2007 Dr Clinton Carter-Brown Eskom Industry Association Resource Centre Project Lead.
Presenter: Peter Busch
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
1 ALLOCATIONS for the Integrated National Electrification Programme 2009/10 Presentation to the Select Committee on Finance 25 February 2009.
CITY OF CAPE TOWN’S SUBMISSION ON ESKOM’S MULTI-YEAR PRICE DETERMINATION – 2010/11 – 2012/13 (MYPD 2) City of Cape Town represented by : Alderman Ian Neilson.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
J A K Douglas UK Session ALPHA2 – Block 4 Barcelona May SETTING OF TARGETS FOR CONTINUITY OF SUPPLY THROUGH BENCHMARKING DOUGLAS J.A.K. and.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
CENTLEC (SOC) LTD (Addressing EDI Service Delivery Challenges) Centlec Delegation (SOC) LTD Joint Hearing between PC on Energy & PC on Cooperative Governance.
1 Cost of Service A Tariff Overview A presentation by Eskom April 2010.
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
The strategy for improved electricity distribution maintenance 9 June 2008.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
The Association of Municipal Electricity Undertakings (Southern Africa) 1 AMEU History and Structure The AMEU was founded in 1915 and for over 90 years.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
Electricity Distribution Industry (EDI) South Africa Presentation to the Joint Parliamentary Portfolio Committees of ENERGY and COOPERATIVE GOVERNANCE.
African Regional Director
AFRICAN MINERALS & ENERGY FORUM BEE Opportunities in the Electricity Industry Parliamentary Portfolio Committee: Minerals & Energy Prepared by: Cingembo.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
Portfolio Committee on Trade and Industry Electricity Pricing 16 November 2012.
1 ELECTRICITY REGULATION AMENDMENT BILL. 2 BACKGROUND Industry structure Electricity value chain Consequences of unregulated “reticulation” History in.
Presentation to Select Committee on Economic Development
Municipal involvement in the energy crisis Select Committee on Labour & Public Enterprises.
1 Presentation to Parliamentary Portfolio Committee on Energy 21 February 2012 Overview of the Regulatory Environment Regarding The Electricity Distribution.
Proposed framework for charges for generators connected to the Distribution network Please note that the contents of this presentation are proposals at.
National Grid - Key Challenges Beijing 24 October 2005 Alan Smart Optimisation & Risk Manager UK Transmission.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
The Association of Municipal Electricity Undertakings (Southern Africa) Experiences and views of the AMEU on the EDI and related issues Michael J Rhode.
Thandi Tesfagiorgis Supervisor: Prof John Ledger (University of Johannesburg) Co Supervisor: Andrew Paverd (Oxford University)
CIRED presentation Improving Quality of Service – Information and Incentives in the GB Electricity Industry Alan Friday (ERA Technology Ltd), Chris Watts.
AMEU QUARTERLY REPORT February 2017
Presentation to Portfolio Committee on Minerals & Energy
AMI Enterprise Task Force of the Utility AMI Working Group
ELECTRICITY REGULATION AMENDMENT BILL
Content Overview of the Regulatory Environment Regarding The Electricity Distribution Industry in South Africa Who is NERSA? Regulatory Principles The.
NERSA presentation at the PPC meeting held on 24 May 2006
Network Innovation Allowance Project: South East Smart Grid
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON MINERALS AND ENERGY POWER OUTAGES IN THE ELECTRICITY DISTRIBUTION INDUSTRY SMUNDA MOKOENA CHIEF.
Electricity Distribution Network Design Training & Courses
Fault Statistics – Quo Vadis Günther Brauner AT
Draft OECD Best Practices for Performance Budgeting
Regulators Indices on Power Quality
Distribution network reliability optimisation modelling and the development of appropriate network performance targets and improvement strategies Theo.
WECC August 2017 Reliability Workshop James Merlo, PhD
WECC August 2017 Reliability Workshop James Merlo, PhD
Background The electrification programme was started by Eskom during the late 1980’s It was further refined by the National Electrification Forum.
Presentation transcript:

1 Key Principles and Practical Considerations for NRS A Distributor Licensee Perspective AMEU Technical Convention October 2006 Gallagher Estate, Midrand Presented by Baden Chatterton Industry Association Resource Centre (IARC), Eskom Holdings Electricity Service Delivery - “The Challenge”

2 Personal Introduction  Employed at Industry Association Resource Centre (IARC), previously Distribution Technology, R&S Division in Eskom Holdings  Distribution Wires Incentive Based Regulation (IBR) Implementation Committee Chairman responsible for the national strategy and co-ordination of : Technical and financial aspects of the Distribution network performance component of the Eskom Multi Year Price Determination (MYPD) for  Distribution Network Performance and Quality of Supply Study Committee (SC) Chairman responsible for the data, systems, measuring, reporting and management of : Network Interruption Performance Quality of Supply (QOS) Equipment Reliability

3 Personal Introduction Cont.  Member of the South African industry NRS 048 working group (WG) responsible for the “NRS Quality of Supply” basket of standards  Author of NRS standard on behalf of the NRS 048 WG under the auspices of the Electricity Liaison Suppliers Committee (ELSC)

4 Presentation Overview  1. Setting the scene…….  2. Introduction and overview of NRS  3. Key aspects of NRS unpacked  4. Way forward NRS : Medium Voltage Network Interruption Performance Measuring and Reporting Standard For NRS 048 reporting purposes, MV is defined as the set of nominal voltage levels 1 kV ≤ Un < 44 kV

5 1. Setting the Scene……

6 Network Interruption Performance Quality of Supply Power Quality Reliability and Availability of Supply : NRS and 8 - Frequency of interruptions - Duration of interruptions Sustained interruptions Momentary interruptions Quality of the Voltage Waveform : NRS Voltage dips - Voltage regulation - Harmonics - Flicker - Unbalance Power Quality Unpacked

7 GENERATION Coal Gas Turbine Hydro Electric Pump Storage Nuclear Transmission Substations Distribution Lines Customer MV Lines (11, 22 and 33kV) TRANSMISSION 765 to 220 kV Lines DISTRIBUTION 132kV 88kV 66kV 44kV LV Line (380/220V) Distribution Substations Electricity System in South Africa MV/LV transformer

8 Residential Traction Agriculture Key Customers Commercial Redistributors Prepaid Mining & Industrial Customers Expectations, Perceptions and Experiences Power Quality provided by licensees Customer Expectations and Experiences Versus Actual Power Quality Provided

9 Why Measure……and Report ? “ To measure is to know.” “If you cannot measure it, you cannot improve it……..” Lord Kelvin, IEC's first President (1906) NRS provides a standard and consistent framework of MV network interruption performance measurement and reporting by distributor licensees in South Africa

10 Network Interruption Performance is much more than just SAIFI and SAIDI…….. Planning and Design Asset Management System Automation Network interconnectivity Universal Access Program Protection and telecontrol External Environment Lightning Winds Theft Storms Vegetation Work/Build Management Quality and accuracy of build Network Operation Switching/operating Fault finding Supply restoration Skills, behaviour and resources Staff skills and training Manpower optimisation Network Performance Planned Work Maintenance Refurbishment Live work Staff training Performance Measurement How and what is measured ? Inclusions/exclusions of events Systems and Data Outage management system Data accuracy and completeness SCADA penetration SAIDI : System Average Interruption Duration Index SAIFI : System Average Interruption Frequency Index

11 2. Introduction and Overview of NRS 048-6

12 Overview of the NRS 048 Standards NRS 048 : Quality of supply standard for Engineering or Wires NRS 047 : Quality of service standard for Customer Services or Retail

13 Acknowledgements for NRS  Tony Dold, NRS 048 WG Chairman, eThekewni Electricity  Francisa Mabuza, Project Leader, IARC, Eskom Holdings  Nelson Mandela Metro  Eskom Holdings (Dx, Tx, KSACS, Corporate and R&S)  SABS  Ekurhuleni Municipality  City Power  EIUG  Tshwane Electricity  Glass Industry  Chamber of Mines  City of Cape Town  Mondi Paper  Mangaung Municipality  DPE  NERSA  IST OTOKOV

14 Key Objectives of NRS  Provide standard, accurate and reliable network interruption performance measures for South Africa  Minimum future system and data requirements for interruption capturing and recording for licensees  Framework for local and international network performance (reliability) benchmarking and best practices  Assist NERSA and licensees with the implementation of Incentive Based Regulation (IBR)  Common industry high level interruption cause code hierarchy : identifying problem areas  Provide annual regulatory reporting guidelines 

15 Foundation for NRS  International standards, work and developments IEEE P1366 standard (USA) IEEE Task force on reporting practices CIGRE : Technical report TB261 UK regulator (ofgem) : “QOS” related standards  Local work, lessons learnt and experiences Eskom Distribution standards Distributor licensees AMEU role-players Customer and industry role-players input

16 3. Key Aspects of NRS Unpacked Refer to the final draft standard (version 4.2) or to the published paper for the technical details and additional information

17 Scope of NRS Implementation 1. Interruption performance requirements 7. Performance reporting requirements 6. Data and change management NRS standard 2. Interruption categories for reporting 5. Interruption cause code categories 4. Event data auditing and validation 3. Definition for performance indices It is recognised that NRS may not be practically and financially possible currently for some licensees and is a long term objective for the effective management of MV network interruption performance in South Africa

18 Key Concepts Introduced  Interruption categories for reporting Unplanned (“U”) Planned (“P”) Customer related (“C”) Intake supply (“S’)  Customer network link (CNL) and end state levels Data connectivity model (HV, MV and LV) % data accuracy and completeness levels  Re-interruptions and criteria for counting Definition and strict application criteria Comprehensive explanatory notes

19 Key Concepts Introduced Cont.  Pre-arranged events for planned interruptions Treatment and counting of planned and co-ordinated interruptions for reporting  Generic customer categories Broad and generic customer category descriptions Long term (forward looking) regulatory requirements  Classification and reporting of major events Criteria A : national comparison of licensees Criteria B : year-on-year licensee performance comparison and tracking Criteria C : internal licensee reporting

20 Key Concepts Introduced Cont..  Accuracy reporting estimation methodology Method to audit and estimate the accuracy of the reported performance measures by licensees “Gatekeeper” to ensure the accuracy and integrity  Data and change management (software) Requirements for data archiving Requirements for tracking any system changes  Different types of licensee reporting Annual power quality reporting Future incentive based (IBR) reporting Reporting for benchmarking purposes

21 4. The Way Forward

22 Implementation  Solid future framework for EDI  4 to 7 years business plan, in order to be completely implemented by the licensees  Some licensees may not meet the current requirements and may require selective exemptions  Resource and financial constraints that need to be managed  Open invitation for any assistance (011)

23 The challenge is now for the distributor licensees to implement the NRS standard and start improving their electricity service delivery – reliability and availability of electricity supply. Electricity Service Delivery - “The Challenge”